Loading...
HomeMy WebLinkAboutWPO201200096 Review Comments Bond Estimate 2013-05-15 (3)Belvedere Phase II WPO file number: WP0201200096 Erosion and Sediment Control Bond Estimate Item Item Number stablization (PS, TS) silt fence (SF) safety fence (SAF) diversion (DD, FD, RWD) temporary slope drain (TSD) SB1A temporary sediment basin (Sal sale temporary sediment basin (SB) SB2 temporary sediment basin (Sal sift fence inlet protection (IP) stone inlet protection (IP) T= height of dam at toe height of dam at face length of dam top width (comp. fill Vol) length of spillway width of spillway riser height riser diameter barrel length barrel diameter barrel collars height of dam at toe height of dam at face length of dam top width (comp. fill Vol) length of spillway width of spillway riser height riser diameter barrel length barrel diameter barrel collars height of dam at toe height of dam at face length of dam top width (comp. fill -1) length of spillway width of spillway riser height riser diameter barrel length barrel diameter barrel collate outlet protection (OP) length channel (SCC, matted) length check dam depth in channe construction entrance (CE) cut at high side ash rack 140 ft paved construction entrance 180 ft rip -rap, placed depth 50 ft width survey and layout (price per 0.1 mi.) acres mobilization stream crossing (computed independently) 0 ft pipe diameter 0 in 14 ft cut at dam 0 ft 8 ft cut at high side loft 140 ft length of cut 180 ft loft width of cut 50 ft 3878.5 cy (cut Vol) 2333.3 cy loft (cy esQ 4656.3 50 ft (spillway stone tons) 75 11 ft $3,500.00 $3,500.00 36 in (riser unit price) $70.00 100 ft (price of base) $200 24 in (barrel unit price) $50.00 2 baffle length 29 ft 9 ft cut at dam 0 ft 9 ft cut at high side 10 ft 80 ft length of cut 120 ft 8 ft width of cut 20 ft 1413.3 cy (cut vol) 888.9 cy 12 ft (cy est) 1709.6 12 ft (spillway stone tons) 21.6 8 ft 24 in (riser unit price) $50.00 45 ft (price of base) $200 18 in (barrel unit price) $40.00 2 baffle length 29 ft 5 ft cut at dam 0 ft loft cut at high side 8 ft 80 ft length of cut 100 ft 6 ft width of cut 50 ft 911.1 cy (cut vol) 977.8 cy 6 ft (cy esQ 1281.5 10 ft (spillway stone tons) 9 7 f 30 in (riser unit price) $65.00 40 ft (price of base) $200 24 in (barrel unit price) $50.00 2 baffle length 29 ft 15 ft width 10 ft 0 ft width 10 ft 1 ft channel width 10 ft 2 ft length 1.0 ft 1.0 (tons) 0.15 1 traps and basins 2 No. Unit Unit Cost Cos 0 (installed) $0.00 21.0 acres $5,000.00 $105,000.00 2250.0 ft $5.00 $11,250.00 1300.0 ft $5.00 $6,500.00 1175 ft $13.00 $15,275.00 0 $0.00 $0.00 $13.00 $50.00 $64,281.85 $13.00 $50.00 $23,305.19 $13.00 $50.00 $17,109.26 5/10/2013 $3,635.00 0 $100.00 $0.00 38 $200.00 $7,600.00 1 $675.00 $675.00 $0.00 1 $225.00 $225.00 0 $2,000.00 $0.00 1 $2,000.00 $2,000.00 1 $3,500.00 $3,500.00 $60.00 $9.00 $1,500.00 $500.00 cost sum $272,695.30 proj mgmt $40,904.29 contingency $31,359.96 Total $344,960 5/10/2013