HomeMy WebLinkAboutSUB201300023 Review Comments Road Plan and Comps. 2013-06-06Michelle Roberge
From: Graham Murray [ graham @collins - engineering.com]
Sent: Thursday, July 11, 2013 10:51 AM
To: Michelle Roberge
Subject: FW: Belvedere TC & Glenmore Plans
Attachments: E2_rp,esc,swm_Glenmore Leake K2 Lots 24 -27 & 29.pdf; 130611 Glenmore Sheet 3-
Revised per Approval Condition 4.pdf
Michelle,
I wanted to follow up on this e -mail to ensure comments #3 and #4 have been resolved.
Thanks,
Graham
- - - -- Original Message---- -
From: Graham Murray
Sent: Tuesday, June 11, 2013 8:00 AM
To: Michelle Roberge (mroberge(@albemarle.org)
Subject: FW: Belvedere TC & Glenmore Plans
Good morning Michelle,
I wanted to follow up your e -mail from Wednesday on Glenmore lots 24 -27 & 29. Below is an e-
mail from Fire & Rescue stating their approval of the plans. Also, I have attached a revised
plan sheet showing the hatched existing driveway to be removed on lot 29. These two items
should resolve conditions #3 and #4 of your conditional approval dated June 5, 2013. If you
have any questions /concerns please let me know.
Thanks,
Graham
- - - -- Original Message---- -
From: Shawn Maddox [mailto:smaddox0albemarle.org]
Sent: Monday, June 10, 2013 6:23 PM
To: Graham Murray
Subject: RE: Belvedere TC & Glenmore Plans
Graham - based on our phone conversation on June 6, 2013 the Belvedere Town Center plans
recently submitted for Fire Rescue review will have no objections from our department per
your previous email discussions with Robbie Gilmer. The plans submitted for Glenmore Lots 24-
27 & 29 will have no objections from Fire Rescue based on your measurements and assurances
the maximum hydrant spacing requirements are met. If you need further please let me know.
Shawn Maddox
Albemarle County Fire Rescue
From: Graham Murray
Sent: Thu 6/6/2013
To: Shawn Maddox
Subject: Belvedere
[mailto: graham (@collins- engineering.com]
8:59 AM
TC & Glenmore Plans
1
Good morning Shawn,
Thank you for reviewing the Belvedere TC amendment plans, and the Glenmore Lots 24 -27 & 29
plans. Per our conversation this morning, can you please send me an e -mail documenting Fire
& Rescue's approval of these two plans?
Thanks and have a great day.
Graham
Graham Murray, P.E.
COLLINS ENGINEERING
www.collins- eneineerina.com <htt
200 Garrett Street, Suite K
Charlottesville, VA 22902
www.collins- enaineerine.com />
Cell: (434) 566 -3011
graham (@collins- engineering.com <mailto: kirsten (@collins- engineering.com>
4