TO: Megan Yaniglos, Senior Planner
FROM: Margaret Maliszewski, Principal Planner
RE: SDP - 2013 -29 and ARB- 2012 -10: Three Notched Center Minor Amendment
DATE: May 14, 2013
A Certificate of Appropriateness must be issued for ARB- 2012 -10 before I can recommend approval of
the SDP - 2013 -20 minor amendment. The last ARB action letter for ARB- 2012 -10 is copied below. It
outlines the ARB's conditions of approval and the applicant's next steps. If SDP - 2013 -20 includes
additional changes that were not included with ARB- 2012 -10, those changes should be included on the
plan provided for the ARB re- submittal, and a memo should be provided outlining all the additional
changes.
AL
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, North Wing
Charlottesville, Virginia 22902 -4596
Phone (434) 296 -5832 Fax (434) 972 -4126
March 30, 2012
Project Development Limited LC
C/O Jo Higgins
2564 Mt. Torrey
Lyndhurst, Va 22952
RE: ARB- 2012 -10: Three Notch'd Center Car Wash
Tax Map 56A3, Parcel 9
Dear Ms. Higgins:
The Albemarle County Architectural Review Board reviewed the above noted item at its meeting on
Monday, March 19, 2011. The Board, by a vote of 4:0, approved the request, pending staff administrative
approval of the following conditions:
1. Provide for review details on the size, color and illumination of the vacuum equipment. Ensure
that equipment design will maintain minimal noticeability from the EC.
2. Update the lighting plans for the overall development to include the wall lights and the soffit lights
for the car wash, and the revised pole light count.
3. Update the landscape plans and plant schedule to specify the tree and shrubs proposed around
the car wash and to account for trees deleted from the plan.
4. Clarify on the plan how the parking rows terminate at the east end of the car wash building.
5. Previously approved materials for the development shall be used for this facility.
6. Vacuum equipment shall be located behind the building and shown on the site plan.
Please provide:
1. Two full sets of revised drawings addressing each of these conditions. Include updated ARB
revision dates on each drawing.
2. A memo including detailed responses indicating how each condition has been satisfied. If
changes other than those requested have been made, identify those changes in the memo also.
Highlighting the changes in the drawing with "clouding" or by other means will facilitate review and
approval.
3. The attached "Revised Application Submittal" form. This form must be returned with your revisions
to ensure proper tracking and distribution.
When staff's review of this information indicates that all conditions of approval have been met, a Certificate
of Appropriateness may be issued.
If you have any questions, please do not hesitate to contact me.
Sincerely,
Margaret Maliszewski
Principal Planner
Cc: Notch'd LLC
90 Stockton Ridge PI
Greenwood Va 22943
COUNTY OF ALBEMARLE
Department of Community Development
REVISED APPLICATION SUBMITTAL
This form must be returned with your revisions to ensure proper tracking and distribution. County
staff has indicated below what they think will be required as a resubmission of revisions. If you need to
submit additional information please explain on this form for the benefit of the intake staff. All plans
must be collated and folded to fit into legal size files, in order to be accepted for submittal.
TO: Margaret Maliszewski DATE:
PROJECT NAME: ARB- 2012 -10: Three Notch'd Center Car Wash
Submittal Type Requiring Revisions O indicates Submittal Code
County Project Number
# Copies
Erosion & Sediment Control Plan E &S
# Copies
Distribute To:
Mitigation Plan (MP)
2
Margaret Maliszewski
Waiver Request (WR)
Stormwater Management Plan (SWMP)
Road Plan RP
Private Road Request, with private /public comparison
(PRR)
Private Road Request — Development Area (PRR -DA)
Preliminary Site Plan PSP
Final Site Plan or amendment FSP
Final Plat (FP)
Preliminary Plat (PP)
Easement Plat (EP)
Boundary Adjustment Plat (BAP)
Rezoning Plan (REZ)
Special Use Permit Concept Plan (SP -CP)
Reduced Concept Plan (R -CP)
Proffers (P)
Bond Estimate Request (BER)
Draft Groundwater Management Plan (D -GWMP)
Final Groundwater Management Plan (F -GWMP)
Aquifer Testing Work Plan (ATWP)
Groundwater Assessment Report (GWAR)
Architectural Review Board (ARB)
ARB2012 -10
Other: Please explain
(For staff use only
Submittal Code
# Copies
Distribute To:
Submittal Code
# Copies
Distribute To:
ARB
2
Margaret Maliszewski