Loading...
HomeMy WebLinkAboutSDP201300031 Review Comments Minor Amendment 2013-06-05Ellie Ray From: Alex Morrison [amorrison @serviceauthority.org] Sent: Wednesday, June 05, 2013 8:30 AM To: Ellie Ray Subject: SDP201300031: Federal Express Phase 4 - Minor Ellie, I have reviewed the above described plans. I have the following comments: • Add to the abandoned water meter note that the service line will be abandoned at the main. • Show new water meter connection -n to the main. • Provide fixture counts so the 1.5" water size can be verified and connection fees can be calculated. Thank you. Alexander J. Morrison, EIT Civil Engineer A"kk v (r:-al -f Service Authbrify 168 Spotnap Road Charlottesville, VA 22911 Office: (434)977-4511 EXT: 116 This email may contain confidential information that should not be shared with anyone other than its intended recipient(s).