Loading...
HomeMy WebLinkAboutWPO201200032 Review Comments Erosion Control Plan 2013-07-11ALg�4 a i � � �HGIN�P Project: K, V c✓' ` 01A Number: `;! 9.01 Date: ­'f I 10 113 Reviewer: K i ehaAP o! WPO Plan Review S�hr� Iv1G' COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road Charlottesville, Virginia 22902 Phone: �414- 933a X3a`7_7 This is an abbreviated review comment notice. County engineering staff is available- every Thursday afternoon to discuss details of review. To schedule, please call your reviewer for an appointment. Erosion & Sediment Control: Adequate (Code Chapter 17, Article II) Not Adequate Y N State standards followed, and Design Standards Manual notes and details Adequate limits and perimeter measures out of work areas All stages protected adequately Adequate channels ti "N � (L urea SW nD E itl P?t y00'1 IrGir�c,anc,sL r'PG�G4 'T�r'Gl►'A�lef O�f'l ?•�'S �Y"d%�S$CL Stormwater Management: Adequate (Code Chapter 17, Article III) Not Adequate Y N v Enough capture and treatment for on -site areas ,j,n',H -49 1 �� y .� Enough detention storage for on -site areas L ✓ Sealed hydrologic and hydraulic computations provided iC�e, Sys WA •plCt d e (Code Chapter 17, Article III) Aquate Not Adequate Y N Buffers and disturbed areas adequately shown Adequate plantings at 2:1, or other mitigation provided This review attempts to encompass the larger compliance questions. County staff does not assume responsibility for any calculation or plan details, and cannot cover the intricacies of every plan submitted. Each plan and calculation must have a professional seal and signature to assume these responsibilities. This plan is Approved (please see attached Approval Fact Sheet) v" Not Approved