Loading...
HomeMy WebLinkAboutWPO201200084 Review Comments Bond Estimate 2013-05-21 (3)Morey Creek Professional Center WPO file number: WP02012 -00084 Stormwater Management Plan Bond Estimate Item Item Number No. Unit Unit Cost Cost (installed) 1 site clearing proj mgmt $30,498.00 contingency 2 standard manhole frame top (not inlet) 8 as $500.00 $4,000.00 3 manhole structure (perft. rise) 74 ft $450.00 $33,300.00 4 pipe, rcp, cmp (15 to 48 ") 15.0 in d 1 ES -1,2 0 EC -1 962.0 ft $35.00 $34,170.00 4 pipe, rep, cmp (15 to 48 ") 24.0 in d 1 ES -1,2 0 EC -1 173.0 ft $50.00 $9,150.00 5 survey and layout (price per 0.1 mi.) acres 5.4 basins 2 $3,700.00 6 mobilization $500.00 7 as -built drawings (per facility) 1 as $2,000.00 $2,000.00 8 materials testing (per facility) 1 as $2,000.00 $2,000.00 9 compaction testing (per dam) 1 as $5,000.00 $5,000.00 10 manufactured facilities (attach manufacturer's or contractors price as a base) 1 Isum $109,500.00 $109,500.00 cost sum $203,320.00 proj mgmt $30,498.00 contingency $23,381.80 Total $257,200 C:\ Users \mkoslow\ Documents \CurrentReviews \WP0201200084 Morey Creek Office Park\2013- 05- 20 -SWM bond estimate WP02012 -00084 5/21/2013