Loading...
HomeMy WebLinkAboutWPO201200065 Review Comments Bond Estimate 2013-05-23Avemore Phase IV WPO file number: WP0201200065 Erosion and Sediment Control Bond Estimate Item Item No. Unit Unit Cost Cost Number installed stablization (PS, TS) 2.6 acres $5,000.00 $13,000.00 silt fence (SF) 1080.0 ft $5.00 $5,400.00 safety fence (SAF) 0.0 ft $5.00 $0.00 diversion (DD, FD, RWD) 180 ft $13.00 $2,340.00 temporary slope drain (TSD) pipe length 0 ft pipe diameter 0 in $0.00 $0.00 1 temporary sediment trap (ST or CIP) height of dam at toe 0 ft cut at dam 3 ft height of dam at face 2 ft cut at high side 3 ft length of dam 10 ft length of cut 20 ft top width 2.5 ft width of cut 60 ft (comp. fill Vol) 2.4 cy (cut Vol) 160.0 cy $13.00 length of spillway loft (cy est) 160.8 width of spillway 20 ft (spillway stone tons) 22.2222 $50.00 $3,201.54 1 temporary sediment basin (SB) height of dam at toe 0 ft cut at dam 0 ft height of dam at face 0 ft cut at high side 0 ft length of dam 260 ft length of cut 0 ft top width 0 ft width of cut 0 ft (comp. fill Vol) 0.0 cy (cut Vol) 0.0 cy $13.00 length of spillway 0 ft (cy est) 0.0 width of spillway 0 ft (spillway stone tons) 0 $50.00 $0.00 riser height 0 ft riser diameter 0 in (riser unit price) $0.00 barrel length 0 ft (price of base) $0 barrel diameter 0 in (barrel unit price) $0.00 barrel collars 0 baffle length 0 ft $0.00 silt fence inlet protection (IP) 0 $100.00 $0.00 stone inlet protection (IP) 7 $200.00 $1,400.00 outlet protection (OP) length 15 ft width loft 0 $675.00 $0.00 channel (SCC, matted) length 1 ft width loft $13.00 check dam depth in channel 1 ft channel width loft 0 $225.00 $0.00 construction entrance (CE) 0 $2,000.00 $0.00 wash rack 1 $2,000.00 $2,000.00 paved construction entrance 1 $3,500.00 $3,500.00 rip -rap, placed depth 0 ft length 0.0 ft width 0.0 (tons) 0 $60.00 $0.00 survey and layout (price per 0.1 mi.) acres 1 traps and basins 2 $1,500.00 mobilization $500.00 stream crossing (computed independently) cost sum $32,854.54 proj mgmt $4,928.18 contingency $3,778.27 Method for volum, (tenth) x (total wid assume face at 2: total width = 3x(to average height = 5/23/2013 Avemore Phase IV WPO file number: WPO201200065 Erosion and Sediment Control Bond Estimate Item Item No. Unit Unit Cost Cost Number installed Total $41,570 5/23/2013