HomeMy WebLinkAboutSUB201300081 Review Comments Preliminary Plat 2013-07-02�� OF A
i"
A
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road
Charlottesville, Virginia 22902 -4596
Phone (434) 296 -5832 Fax (434) 972 -4126
Project: Houndstooth Subdivision — Preliminary SUB201300081
Plan preparer: Shimp Engineering [tel 434- 207 -8086]
Owner or rep.: Simon Walker, Bertha Paige, Rose W. Brown,
Carrie W. Wood & Roberta W. King
Plan received date: 11 June 2013
Date of comments: 2 July 2013
Reviewer: Michael Koslow
Review coordinator: Megan Yaniglos
The first preliminary plat submittal (SUB20130081) submitted 10 June 2013 has received
Engineering Review and does not appear to meet Albemarle County minimum checklist items for
approval. This review does not include a review of Erosion & Sediment Control or Stormwater
Management. Please adequately address the following comments for preliminary plat approval:
A. Existing Conditions Information
1) Please indicate all existing easements. Overhead telephone line appears on sheet
1 next to Free Union Road.
B. Proposed Plan View Information
1) VDOT approval is required for this project as it affects public right of way.
2) Short Version BMP Computations indicate 5 driveways but only 3 proposed
structures. Please update with WPO plans. Recommend update to preliminary plat
submittal.
C. Tier III Groundwater Assessment
1) Please provide a graphic depiction of groundwater recharge areas and flow. Of
particular concern is providing adequate area for proposed Lot 1 which is not adjacent
to conceptual BMP location.
Engineering Review Comments
Page 2 of 2
Please adequately address the following comments for final plat approval:
D. Application Information
1) Please submit a separate set of 7 road plans with application and fee for review
and approval.
2) Owner is required to provide a completed copy of the standard stormwater
maintenance agreement and fee for recordation for any stormwater management
facilities.
3) Prior to final plat approval, a separate set of Water Protection Ordinance plans
must be submitted and approved including: stormwater management plan and erosion
and sediment control plan.
4) Prior to final plat approval:
water protection ordinance — erosion and sediment control and stormwater
management and
subdivision — road and drainage
bonds must be calculated by the county and paid by owner after receipt of a Bond
Request Form from owner.
Community Development Engineering is available from 2:30 -4 PM on Thursdays to discuss these review
comments. Please contact Michael Koslow at 434 - 296 -5832 ext. 3297 or email mkoslow@albemarle.org
to schedule an appointment.