HomeMy WebLinkAboutSUB201300078 Review Comments Bond Estimate 2013-06-17Hyland Ridge Phase 3A Road and Infrastructure Construction Bond Estimate (roads, site work, storm sewer) Plan # SUB201300078 summary Aspen Drive $544,610 Fontana Drive Ext $309,480 Grand Total $854,090 C:\ Users \mkoslow\ Documents \CurrentReviews \SUB201300078 Hyland Ridge Phase 3A \2013- 06- 12- EN- MK- RD -BE- SUB201300078- Hyland_Ridge_Phase_3A 6/17/2013 Hyland Ridge Phase 3A Road and Infrastructure Construction Bond Estimate (roads, site work, storm sewer) Plan # SUB201300078 Item No. Unit Unit Cost Cost installed % compete cost remaining Aspen Drive station 10 +00 to 22 +78.24 road length 1278.2 ft aggregate base 6.0 in d 1278.2 ft L 28.0 ft W 1252.7 ton $35.00 $43,843.63 0% $43,843.63 blotted or prime &double seal 0.0 ft L 28.0 ft W 0.0 sy $10.00 $0.00 0% $0.00 asphalt base 3.0 in d 1278.2 ft L 28.0 ft W 657.7 tons $100.00 $65,765.45 0% $65,765.45 asphalt surface 1.5 in d 1278.2 ft L 28.0 ft W 328.8 tons $120.00 $39,459.27 0% $39,459.27 curb CG -2 0.0 ft $13.00 $0.00 0% $0.00 curb CG -6 2556.5 ft $15.00 $38,347.20 0% $38,347.20 sidewalk, concrete (6) 2556.5 ft $17.00 $43,460.16 0% $43,460.16 ramp CG -12 0 each $350.00 $0.00 0% $0.00 street name sign 1 each $200.00 $200.00 0% $200.00 traffic control sign 6 each $200.00 $1,200.00 0% $1,200.00 Street Landscape 0 Each 0 each $150.00 $0.00 0% $0.00 guardrail 0 ES @ 3000 0.0 ft $17.00 $0.00 0% $0.00 drop inlet or grate 15 each $3,500.00 $52,500.00 0% $52,500.00 standard manhole frame top (not inlet) 6 each $500.00 $3,000.00 0% $3,000.00 manhole structure (per ft. rise) 46 ft $450.00 $20,700.00 0% $20,700.00 pipe, rcp, cmp (15 to 48 ") 15.0 in d 1 ES -1,2 0 EC -1 565.0 ft $35.00 $20,275.00 0% $20,275.00 pipe, rcp, cmp (15 to 48 ") 18.0 in d 0 ES -1,2 0 EC -1 83.0 ft $40.00 $3,320.00 0% $3,320.00 pipe, rcp, cmp (15 to 48 ") 30.0 in d 1 ES -1,2 0 EC -1 628.0 ft $65.00 $41,320.00 0% $41,320.00 pipe, rcp, cmp (15 to 48 ") 18.0 in d 0 ES -1,2 0 EC -1 0.0 ft $40.00 $0.00 0% $0.00 rip -rap, placed 0.0 ft d 0.0 ft L 0.0 ft W 0.0 ton $60.00 $0.00 0% $0.00 matting, EC -2 or 3 4000.0 ft L 4.0 ft W 1777.8 sy $2.00 $3,555.56 0% $3,555.56 clear and grub (for wooded sites) 1278.2 ft L 30.0 ft W 0.9 acre $24,000.00 $21,127.93 0% $21,127.93 cut grading 350.0 cy $4.00 $1,400.00 0% $1,400.00 fill grading 200.0 cy $9.00 $1,800.00 0% $1,800.00 as -built drawings (1k +price per 0.1 mi.) 1278.2 ft L 0.24209 mi. 3 Isum $2,000.00 $7,000.00 0% $7,000.00 survey and layout (price per 0.1 mi.) 1278.2 ft L 0.24209 mi. 3 Isum $2,000.00 $7,000.00 0% $7,000.00 mobilization 1 Isum $500.00 $500.00 0% $500.00 materials testing 1278.2 ft L 2.55648 inc of 500' 4 each $200.00 $720.00 0% $720.00 compaction testing 1278.2 ft L 2.55648 inc of 500' 4 each $200.00 $720.00 0% $720.00 CBR tests (1 every 0.1 mi. per road) 1278.2 ft L 2.55648 inc of 500' 4 each $200.00 $720.00 0% $720.00 stone depth inspections 1278.2 ft L 2.55648 inc of 500' 4 each $200.00 $720.00 0% $720.00 pavement inspections 1278.2 ft L 2.55648 inc of 500' 4 each $200.00 $720.00 0% $720.00 pipe and drainage video inspections 0 ft $1.00 $0.00 0% $0.00 VDOT surety (1 lane) 1278.2 ft L 0.24209 mi. 2 Lanes $2,000.00 $9,683.64 0% $9,683.64 VDOT maintenance fee (1 In rd, 1 yr) 1278.2 ft L 0.24209 mi. 2 Lanes $150.00 $726.27 0% $726.27 VDOT admin. Cost recovery fee(1 lane) 1278.2 ft L 0.24209 mi. 2 Lanes $100.00 $734.18 0% $734.18 cost sum $430,518.29 $430,518.29 proj mgmt $64,577.74 $64,577.74 contingency $49,509.60 $49,509.60 Total $544,610 $544,610 C:\ Users \mkoslow\ Documents \CurrentReviews \SUB201300078 Hyland Ridge Phase 3A\ 2013- 06- 12- EN- MK- RD- BE- SUB201300078- Hyland_ Ridge_ Phase_ 3A 6/17/2013 Hyland Ridge Phase 3A Road and Infrastructure Construction Bond Estimate (roads, site work, storm sewer) Plan # SUB201300078 Item No. Unit Unit Cost Cost installed % compete cost remaining Fontana Drive Extended station 25 +50to 28 +20 road length 270.0 ft aggregate base 6.0 in d 270.0 ft L 28.0 ft W 264.6 ton $35.00 $9,261.00 0% $9,261.00 blotted or prime &double seal 0.0 ft L 28.0 ft W 0.0 sy $10.00 $0.00 0% $0.00 asphalt base 3.0 in d 270.0 ft L 28.0 ft W 138.9 tons $100.00 $13,891.50 0% $13,891.50 asphalt surface 1.5 in d 270.0 ft L 28.0 ft W 69.5 tons $120.00 $8,334.90 0% $8,334.90 curb CG -2 0.0 ft $13.00 $0.00 0% $0.00 curb CG -6 540.0 ft $15.00 $8,100.00 0% $8,100.00 sidewalk, concrete (6) 540.0 ft $17.00 $9,180.00 0% $9,180.00 ramp CG -12 10 each $350.00 $3,500.00 0% $3,500.00 street name sign 1 each $200.00 $200.00 0% $200.00 traffic control sign 15 each $200.00 $3,000.00 0% $3,000.00 Street Landscape 0 Each 0 each $150.00 $0.00 0% $0.00 guardrail 0 ES @ 3000 0.0 ft $17.00 $0.00 0% $0.00 drop inlet or grate 24 each $3,500.00 $84,000.00 0% $84,000.00 standard manhole frame top (not inlet) 3 each $500.00 $1,500.00 0% $1,500.00 manhole structure (per ft. rise) 26 ft $450.00 $11,700.00 0% $11,700.00 pipe, rcp, cmp (15 to 48 ") 15.0 in d 2 ES -1,2 0 EC -1 1295.0 ft $35.00 $46,325.00 0% $46,325.00 pipe, rcp, cmp (15 to 48 ") 18.0 in d 0 ES -1,2 0 EC -1 256.0 ft $40.00 $10,240.00 0% $10,240.00 pipe, rcp, cmp (15 to 48 ") 24.0 in d 0 ES -1,2 0 EC -1 268.0 ft $50.00 $13,400.00 0% $13,400.00 pipe, rcp, cmp (15 to 48 ") 18.0 in d 0 ES -1,2 0 EC -1 0.0 ft $40.00 $0.00 0% $0.00 rip -rap, placed 0.0 ft d 0.0 ft L 0.0 ft W 0.0 ton $60.00 $0.00 0% $0.00 matting, EC -2 or 3 0.0 ft L 0.0 ft W 0.0 sy $2.00 $0.00 0% $0.00 clear and grub (for wooded sites) 270.0 ft L 30.0 ft W 0.2 acre $24,000.00 $4,462.81 0% $4,462.81 cut grading 600.0 cy $4.00 $2,400.00 0% $2,400.00 fill grading 500.0 cy $9.00 $4,500.00 0% $4,500.00 as -built drawings (1k +price per 0.1 mi.) 270.0 ft L 0.05114 mi. 1 Isum $2,000.00 $3,000.00 0% $3,000.00 survey and layout (price per 0.1 mi.) 270.0 ft L 0.05114 mi. 1 Isum $2,000.00 $3,000.00 0% $3,000.00 mobilization 1 Isum $500.00 $500.00 0% $500.00 materials testing 270.0 ft L 0.54 inc of 500' 2 each $200.00 $320.00 0% $320.00 compaction testing 270.0 ft L 0.54 inc of 500' 2 each $200.00 $320.00 0% $320.00 CBR tests (1 every 0.1 mi. per road) 270.0 ft L 0.54 inc of 500' 2 each $200.00 $320.00 0% $320.00 stone depth inspections 270.0 ft L 0.54 inc of 500' 2 each $200.00 $320.00 0% $320.00 pavement inspections 270.0 ft L 0.54 inc of 500' 2 each $200.00 $320.00 0% $320.00 pipe and drainage video inspections 0 ft $1.00 $0.00 0% $0.00 VDOT surety (1 lane) 270.0 ft L 0.05114 mi. 2 Lanes $2,000.00 $2,045.45 0% $2,045.45 VDOT maintenance fee (1 In rd, 1 yr) 270.0 ft L 0.05114 mi. 2 Lanes $150.00 $153.41 0% $153.41 VDOT admin. Cost recovery fee(1 lane) 270.0 ft L 0.05114 mi. 2 Lanes $100.00 $352.27 0% $352.27 cost sum $244,646.35 $244,646.35 proj mgmt $36,696.95 $36,696.95 contingency $28,134.33 $28,134.33 Total $309,480 $309,480 C:\ Users \mkoslow\ Documents \CurrentReviews \SUB201300078 Hyland Ridge Phase 3A\ 2013- 06- 12- EN- MK- RD- BE- SUB201300078- Hyland_ Ridge_ Phase_ 3A 6/17/2013