Loading...
HomeMy WebLinkAboutSUB201000113 Review Comments Bond Estimate 2013-06-13Avemore Subdivision Phase 4 Road and Infrastructure Construction Bond Estimate (roads, site work, storm sewer) Plan # SUB201000113 Item No. Unit Unit Cost Cost installed % compete cost remaining Avemore Pond Road station road length 780.0 ft aggregate base 6.0 in d 780.0 ft L 20.0 ft W 546.0 ton $35.00 $19,110.00 0% $19,110.00 blotted or prime &double seal 780.0 ft L 0.0 ft W 0.0 sy $10.00 $0.00 0% $0.00 asphalt base 2.0 in d 780.0 ft L 20.0 ft W 191.1 tons $100.00 $19,110.00 0% $19,110.00 asphalt surface 1.5 in d 780.0 ft L 20.0 ft W 143.3 tons $120.00 $17,199.00 0% $17,199.00 curb CG -2 0.0 ft $13.00 $0.00 0% $0.00 curb CG -6 1000.0 ft $15.00 $15,000.00 0% $15,000.00 sidewalk, concrete (6) 150.0 ft $17.00 $2,550.00 0% $2,550.00 ramp CG -12 0 ft $350.00 $0.00 0% $0.00 street name sign 0 each $200.00 $0.00 0% $0.00 traffic control sign 3 each $200.00 $600.00 0% $600.00 Street Landscape 0 Each 0 each $150.00 $0.00 0% $0.00 guardrail 0 ES @ 0 0.0 ft $17.00 $0.00 0% $0.00 drop inlet or grate 7 each $3,500.00 $24,500.00 0% $24,500.00 standard manhole frame top (not inlet) 2 each $500.00 $1,000.00 0% $1,000.00 manhole structure (per ft. rise) 34 ft $450.00 $15,300.00 0% $15,300.00 pipe, rep, cmp (15 to 48 ") 15.0 in d 0 ES -1,2 0 EC -1 377.0 ft $35.00 $13,195.00 0% $13,195.00 pipe, rep, cmp (15 to 48 ") 24.0 in d 0 ES -1,2 0 EC -1 0.0 ft $50.00 $0.00 0% $0.00 pipe, rep, cmp (15 to 48 ") 18.0 in d 0 ES -1,2 0 EC -1 243.0 ft $40.00 $9,720.00 0% $9,720.00 pipe, rep, cmp (15 to 48 ") 18.0 in d 0 ES -1,2 0 EC -1 0.0 ft $40.00 $0.00 0% $0.00 rip -rap, placed 0.0 ft d 0.0 ft L 0.0 ft W 0.0 ton $60.00 $0.00 0% $0.00 matting, EC -2 or 3 0.0 ft L 4.0 ft W 0.0 sy $2.00 $0.00 0% $0.00 clear and grub (for wooded sites) 0.0 ft L 30.0 ft W 0.0 acre $24,000.00 $0.00 0% $0.00 cut grading 0.0 cy $4.00 $0.00 0% $0.00 fill grading 0.0 cy $9.00 $0.00 0% $0.00 as -built drawings (1k+ price per 0.1 mi.) 780.0 ft L 0.14773 mi. 2 Isum $2,000.00 $5,000.00 0% $5,000.00 survey and layout (price per 0.1 mi.) 780.0 ft L 0.14773 mi. 2 Isum $2,000.00 $5,000.00 0% $5,000.00 mobilization 0Isum $500.00 $0.00 0% $0.00 materials testing 780.0 ft L 1.56 inc of 500' 3 each $200.00 $520.00 0% $520.00 compaction testing 780.0 ft L 1.56 inc of 500' 3 each $200.00 $520.00 0% $520.00 CBR tests (1 every 0.1 mi. per road) 780.0 ft L 1.56 inc of 500' 3 each $200.00 $520.00 0% $520.00 stone depth inspections 780.0 ft L 1.56 inc of 500' 3 each $200.00 $520.00 0% $520.00 pavement inspections 780.0 ft L 1.56 inc of 500' 3 each $200.00 $520.00 0% $520.00 pipe and drainage video inspections 0 ft $1.00 $0.00 0% $0.00 cost sum $149,884.00 $149,884.00 proj mgmt $22,482.60 $22,482.60 contingency $17,236.66 $17,236.66 Total $189,610 $189,610 \\ Cob- dts01 \CityViewLnk \Docs \2010 \SUB \SUB201 0001 1 3 Avemore Phase IV Final \road bond estimate 13 June 2013.x1s 6/14/2013 Avemore Subdivision Phase 4 Road and Infrastructure Construction Bond Estimate (roads, site work, storm sewer) Plan # SUB201000113 Item Avemore Pond Road No. Unit Unit Cost Cost (installed) % compete cost remaining \\ Cob- dts01 \CityViewLnk \Docs \2010 \SUB \SUB201 0001 1 3 Avemore Phase IV Final \road bond estimate 13 June 2013.x1s 6/14/2013