Loading...
HomeMy WebLinkAboutWPO201300027 Review Comments Bond Estimate 2013-06-25Project Name: Block 29A & 35A WPO file number: WP0201300027 Erosion and Sediment Control Bond Estimate Item Item Number stablization (PS, TS) cut at dam silt fence (SF) 1.5 ft safety fence (SAF) 8 ft diversion (DD, FD, RWD) length of cut temporary slope drain (TSD) pipe length 1 temporary sediment trap (ST or CIP) 31 ft 211.1 cy height of dam at toe 948.4 cy height of dam at face (cy set) length of dam 6 ft top width 12 (camp. fill vol) cut at dam length of spillway 6 ft width of spillway 2 temporary sediment trap (ST or CIP) 60 ft length of cut height of dam at toe 6 ft height of dam at face 38 ft length of dam (cut Vol) top width 18 ft (comp. fill Vol) 662.4 length of spillway (spillway stone tons) width of spillway silt fence inlet protection (IP) width stone inlet protection flo) 30 ft outlet protection (OP) length channel (SCC, matted) length check dam depth in channel construction entrance (CE) 30.0 ft wash rack (tons) paved construction entrance 1 rip -rap, placed depth width survey and layout (price per 0.1 mi.) acres mobilization stream crossing (computed independently) ft pipe diameter 6.5 ft cut at dam 6 ft 1.5 ft cut at high side 8 ft 50 ft length of cut 62 ft 6 ft width of cut 31 ft 211.1 cy (cut Vol) 948.4 cy 18 ft (cy set) 1018.7 6 ft (spillway stone tons) 12 1 ft cut at dam 4 ft 6 ft cut at high side 4 ft 60 ft length of cut 76 ft 6 ft width of cut 38 ft 163.3 cy (cut Vol) 608.0 cy 18 ft (cy est) 662.4 Eft (spillway stone tons) 12 30 ft width 15 ft 30 ft width 12 ft 1.5 ft channel width 8 ft 3 ft length 30.0 ft 15.0 (tons) 101.25 1 traps and basins 2 No. Unit Unit Cost Cos $300.00 (installed) $1,600.00 4.0 acres $5,000.00 $20,000.00 2500.0 ft $5.00 $12,500.00 ft $5.00 $0.00 1800 ft $13.00 $23,400.00 $0.00 $0.00 $13.00 $50.00 $13,843.63 $13.00 $50.00 $9,211.78 3 $100.00 $300.00 8 $200.00 $1,600.00 1 $2,025.00 $2,025.00 $468.00 5 $270.00 $1,350.00 1 $2,000.00 $2,000.00 $2,000.00 1 $3,500.00 $3,500.00 M. cost sum $98,273.41 proj mgmt $14,741.01 contingency $11,301.44 Total $124,320 Method for VolumE (tenth) x (total widt assume face at 2: total width = 3x(tof average height = ( 6/19/2013