HomeMy WebLinkAboutWPO201200062 Review Comments Erosion Control Plan 2013-07-11�OF �1LBn.
�'rRGIN1P -
_.___ WPO Plan Review
Project: 01A Iv 41 CVre_k-SI'Jt
Number: 1,4?*apl4 -ocvo b."D.
Date: -7,11011 a
Reviewer: 1 �C Ltgke ( ko$ (o W
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road
Charlottesville, Virginia 22902
Phone: 4 3'1- a�16- S 33 a F k99 7
This is an abbreviated review comment notice. County engineering staff is available every Thursday
afternoon to discuss details of review. To schedule, please call your reviewer for an appointment.
Erosion & Sediment Control: Adequate
(Code Chapter 17, Article In Not Adequate
Y N
State standards followed, and Design Standards Manual notes and details
Adequate limits and perimeter measures out of work areas
All stages protected adequately
Adequate channels
Stormwater Management: Adequate
(Code Chapter 17, Article M)
Not Adequate
Y N
Enough capture and treatment for on -site areas
Enough detention storage for on -site areas
Sealed hydrologic and hydraulic computations provided
Mitigation: Adequate
(Code Chapter 17, Article IIn
Not Adequate
Y N
Buffers and disturbed areas adequately shown
Adequate plantings at 2:1, or other mitigation provided
This review attempts to- encompass the - larger- compliance - questions- Countystaff does not- assume - - --
responsibility for any calculation or plan details, and cannot cover the intricacies of every plan submitted.
Each plan and calculation must have a professional seal and signature to assume these responsibilities.
This plan is
�( Approved (please see attached Approval Fact Sheet)
Not Approved