HomeMy WebLinkAboutWPO201300004 Review Comments Stormwater Management Plan 2013-07-11of n
�'�RGINIP
WPO Plan Review
Project: T-VV (ock United Ke_I� oc
Number: y4P40l — oo'a o `I'
Date: -11 Iv l 13
Reviewer: Kj' Gkpel koSlDU/
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road
Charlottesville, Virginia 22902
Phone:W -ag6 --583 fkf 32 97
This is an abbreviated review comment notice. County engineering staff is available every Thursday
afternoon to discuss details of review. To schedule, please call your reviewer for an appointment.
Erosion & Sediment Control: Adequate
(Code Chapter 17, Article Il) Not Adequate
Y N
State standards followed, and Design Standards Manual notes and details
Adequate limits and perimeter measures out of work areas
All stages protected adequately
Adequate channels
Stormwater Management: Adequate
(Code Chapter 17, Article ]L1)
Not Adequate
Y N
Enough capture and treatment for on -site areas
Enough detention storage for on -site areas Nc k' tqk 6-�. ec, S r
Sealed hydrologic and hydraulic computations provided
Gwlc VIC+ Sealt-1 o A a � VL%At,�4Ck�
10"14 p6k
Mitigation: Iu(A Adequate flow
(Code Chapter 17, Article III)
Not Adequate
Y N
Buffers and disturbed areas adequately shown
Adequate plantings at 2:1, or other mitigation provided
-- - -Thus review attempts -to encompass-the larger compliance questions. - County staff does not assume
responsibility for any calculation or plan details, and cannot cover the intricacies of every plan submitted.
Each plan and calculation must have a professional seal and signature to assume these responsibilities.
This plan is
Approved (please see attached Approval Fact Sheet)
Not Approved