Loading...
HomeMy WebLinkAboutWPO201300027 Review Comments Bond Estimate 2013-06-25 (3)Old Trail Blocks 29A & 35A WPO file number: WP0201300027 Stormwater Management Plan Bond Estimate Item tam cut w dam Number 0 ft siteclearing 0 ft permanent diversion or ditch length of cut standard manhole frame top (not inlet) 0 ft manhole structure (per ft. rise) 0 ft pipe, rep, amp (15 to 48') 0.0 in d aggregate base or drainage stone 0.0 in d 1 basin 0.0 0 ft height of dam at toe 0 height of dam at face (price of base) length of dam 0 top width 0 ft (comp. fill voil length of spillway 1 ea width of spillway $2,000.00 barrel collars 0 ES -1,2 0 EC -1 0.0 ft L 0.0 ft w 0 ft cut w dam 0 ft 0 ft cut at high side 0 ft 260 ft length of cut 0 ft 0 ft width of cut 0 ft 0.0 cy (cut Vol) 0.0 cy 0 ft (cy set) 0.0 0 ft (spillway some tons) 0 (price of base) $0 0 baffle length 0 ft Vass shrubs seedlings underdrain (LF) Witter soil mix (C1) fresh rack/ anti vortex devices maintenance access road (Li rip -rap, placed depth 0 ft length width 0.0 (tans) umey and layout (price per 0.1 mi.) acres 1 basins mobilization as -built drawings (per facility) materials testing (per facility) compaction testing (per dam) manufactured facilities (attach manufacturer's or contractors price as a base 1.0 ft 0 2 No. Unit Unit Cost Cost 0 as (installed) $0.00 0 ft $13.00 $0.00 0 ea $500.00 $0.00 0 ft $450.00 $0.00 0.0 ft $0.00 $0.00 0.0 ton $35.00 $0.00 $13.00 $50.00 $0.00 $0.00 0 as $150.00 $0.00 0 as $50.00 $0.00 0 as $5.00 $0.00 100 ft $5.00 $500.00 259 cy $38.00 $9,842.00 1 ft $1,500.00 $1,500.00 0 ft $50.00 $0.00 $60.00 $0.00 $1,500.00 $500.00 1 ea $2,000.00 $2,000.00 1 ea $2,000.00 $2,000.00 1 ea $5,000.00 $5,000.00 cost sum $22,842.00 prof mgmt $3,426.30 contingency $2,626.83 Total $28,900 6/19/2013