HomeMy WebLinkAboutWPO201300027 Review Comments Bond Estimate 2013-06-25 (3)Old Trail Blocks 29A & 35A
WPO file number: WP0201300027
Stormwater Management Plan Bond Estimate
Item tam
cut w dam
Number
0 ft
siteclearing
0 ft
permanent diversion or ditch
length of cut
standard manhole frame top (not inlet)
0 ft
manhole structure (per ft. rise)
0 ft
pipe, rep, amp (15 to 48')
0.0 in d
aggregate base or drainage stone
0.0 in d
1 basin
0.0
0 ft
height of dam at toe
0
height of dam at face
(price of base)
length of dam
0
top width
0 ft
(comp. fill voil
length of spillway
1 ea
width of spillway
$2,000.00
barrel collars
0 ES -1,2 0 EC -1
0.0 ft L 0.0 ft w
0 ft
cut w dam
0 ft
0 ft
cut at high side
0 ft
260 ft
length of cut
0 ft
0 ft
width of cut
0 ft
0.0 cy
(cut Vol)
0.0 cy
0 ft
(cy set)
0.0
0 ft
(spillway some tons)
0
(price of base)
$0
0
baffle length
0 ft
Vass
shrubs
seedlings
underdrain (LF)
Witter soil mix (C1)
fresh rack/ anti vortex devices
maintenance access road (Li
rip -rap, placed depth 0 ft length
width 0.0 (tans)
umey and layout (price per 0.1 mi.) acres 1 basins
mobilization
as -built drawings (per facility)
materials testing (per facility)
compaction testing (per dam)
manufactured facilities (attach manufacturer's or contractors price as a base
1.0 ft
0
2
No. Unit
Unit Cost
Cost
0 as
(installed)
$0.00
0 ft
$13.00
$0.00
0 ea
$500.00
$0.00
0 ft
$450.00
$0.00
0.0 ft
$0.00
$0.00
0.0 ton
$35.00
$0.00
$13.00
$50.00 $0.00
$0.00
0 as
$150.00
$0.00
0 as
$50.00
$0.00
0 as
$5.00
$0.00
100 ft
$5.00
$500.00
259 cy
$38.00
$9,842.00
1 ft
$1,500.00
$1,500.00
0 ft
$50.00
$0.00
$60.00
$0.00
$1,500.00
$500.00
1 ea
$2,000.00
$2,000.00
1 ea
$2,000.00
$2,000.00
1 ea
$5,000.00
$5,000.00
cost sum $22,842.00
prof mgmt $3,426.30
contingency $2,626.83
Total $28,900
6/19/2013