HomeMy WebLinkAboutSUB201300042 Review Comments Final Plat 2013-04-22 (3)YlAGIl`11A
County of Albemarle
Department of Community Development
The final subdivision plat has been reviewed:
1. Final plat approval cannot precede final road plan (SUB2013- 00025; not yet approved) or WPO
plan (WP02012- 00013, for which an amendment is being reviewed separately which contains
stormwater management (SWM) easements) approval for Old Trail Village Block 14.
2. If SWM amendment proposes to treat runoff from Block 14 off -site, please modify easement note
on sheet 3A "variable width drainage p. s*,,,..,... ater- f edit , maintenance easement."
3. Please indicate proposed water and sewer lines, proposed drainage lines and structures, fire
hydrants, and proposed stormwater management facilities after approved on Old Trail Village
Block 14 road and WPO plans.
4. A VDOT accepted public road or a subdivision - road bond will need to be posted for roads
proposed with Old Trail Village Block 14 site plan prior to the approval of the final plat.
5. Subdivision — water & sewer (by ACSA) and WPO (ESC and SWM, by the county) bonds will
need to be posted prior to the approval of the final plat.
6. A stormwater management maintenance agreement will be required for Old Trail Village Block 14
prior to final subdivision plat approval.
Memorandum
To:
Megan Yaniglos, Project Planner
From:
Michael Koslow, Engineering Review (SUB201300042)
Project:
Old Trail Village Block 14 - Final Plat
Plan preparer:
Roudabush, Gale & Associates Inc. [434- 977 -0205]
Owner or rep.:
March Mountain Properties, LLC
Plan received date:
26 March 2013
Date of comments:
22 April 2013
Reviewer:
Michael Koslow
The final subdivision plat has been reviewed:
1. Final plat approval cannot precede final road plan (SUB2013- 00025; not yet approved) or WPO
plan (WP02012- 00013, for which an amendment is being reviewed separately which contains
stormwater management (SWM) easements) approval for Old Trail Village Block 14.
2. If SWM amendment proposes to treat runoff from Block 14 off -site, please modify easement note
on sheet 3A "variable width drainage p. s*,,,..,... ater- f edit , maintenance easement."
3. Please indicate proposed water and sewer lines, proposed drainage lines and structures, fire
hydrants, and proposed stormwater management facilities after approved on Old Trail Village
Block 14 road and WPO plans.
4. A VDOT accepted public road or a subdivision - road bond will need to be posted for roads
proposed with Old Trail Village Block 14 site plan prior to the approval of the final plat.
5. Subdivision — water & sewer (by ACSA) and WPO (ESC and SWM, by the county) bonds will
need to be posted prior to the approval of the final plat.
6. A stormwater management maintenance agreement will be required for Old Trail Village Block 14
prior to final subdivision plat approval.