HomeMy WebLinkAboutWPO201300018 Review Comments Erosion Control Plan 2013-07-15�pF A
vt�r�1Q
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902 -4596
Phone (434) 296 -5832 Fax (434) 972 -4126
Project:
Plan preparer:
Owner or rep.:
Plan received date:
Date of comments:
Reviewer:
Briarwood Underground Detention
Collins Engineering [293 -3719]
Woodbriar Associates
3 Jul 2013
15 Jul 2013
Michelle Roberge
A. SWM & Erosion and Sediment Control (WP0201300018)
1. Per VESCH, a sediment trap is required for the a drainage area up to 3 acres. Please show a
sediment trap where the grass swale is shown.
2. Please provide forebays at both ends of the grass swale and outlet protection.
Sincerely,
r&qer-
Michelle Roberge
AL
� �kciN�P
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road
Charlottesville, Virginia 22902
WPO Plan Review
Proj ect:
Number: LO ?DotO
Date: Y 15
Reviewer: mllklofko ecbe!A� Phone:
This is an abbreviated review comment notice. County engineering staff is available every Thursday
afternoon to discuss details of review. To schedule, please call your reviewer for an appointment
Erosion & Sediment Control: Adequate
(Code Chapter 17, Article II) Not Adequate
State standards followed, and Design Standards Manual notes and details
limits and perimeter measures out of work areas
All stages protected adequately
Adequate channels
o
is
Stormwater Management: Adequate
(Code Chapter 17, Article III)
Not Adequate
Y -
Enough capture and treatment for on -site areas
Enough detention storage for on -site areas
Sealed hydrologic and hydraulic computations provided
Tffltigation:
(Code Chapter 17, Article III) Ad equate
Not Adequate
Y N
Buffers and disturbed areas adequately shown
Adequate plantings at 2:1, or other mitigation provided
/iffi
This review attempts to encompass the larger compliance questions. County staff does not assume
responsibility for any calculation or plan details, and cannot cover the intricacies of every plan submitted.
Each plan and calculation must have a professional seal and signature to assume these responsibilities.
This plan is Approved (please see attached Approval Fact Sheet)
Not Approved