HomeMy WebLinkAboutWPO201300032 Review Comments Mitigation Plan 2013-07-11.y
�rRG1
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road
Charlottesville, Virginia 22902
WPO Plan Review
Proj ect: S C
Number: IQ P 0, lk! I -9a 0008
Date: tlt 10 113
Reviewer: Ltl r c k C 1
Phone: t18[1 `dA S'b 3 a X J j` <i7
This is an abbreviated review comment notice. County engineering staff is available every Thursday
afternoon to discuss details of review. To schedule, please call your reviewer for an appointment.
Erosion & Sediment Control: Adequate
(Code. Chapter 17, Article 11) K Not Adequate
Im
State standards followed, and Design Standards Manual notes and details
Adequate limits and perimeter measures out of work areas
All stages protected adequately r
Adequate channels��'`
1 r _
V �_CA ' /_`UP
Stormwater Management: Adequate
(Code Chapter 17, Article II)
Not Adequate
Y N
Enough capture and treatment for on -site areas
Enough detention storage for on -site areas
Sealed hydrologic and hydraulic computations provided ('plc s ✓114 SZGI k k
Oa%aKa4 Vt,tWe l"O�n�7'�1j"V�1v�l� circt�HucdlL 4r�4,S
�riu1 hv;t�m�•r- �� -� o.ri�.Si'c� -�� jam.. cudGS
X Mitigation. Adequate
(Code Chapter 17, Article
W& Lt ' Not Adequate
Y N
Buffers and disturbed areas adequately shown
Adequate plantings at 2:1, or other mitigation provided
vv�ytar►�- i�"vl �! E e c, ,p��; o f ^GpPeAr5
This review attempts to encompass the larger compliance questions. - County staff does not assume
responsibility for any calculation or plan details, and cannot cover the intricacies of every plan submitted. �"
Each plan and calculation must have a professional seal and signature to assume these responsibilities.
This plan is
Approved (please see attached Approval Fact Sheet)
Not Approved
b,T-rvrs)