Loading...
HomeMy WebLinkAboutWPO201300026 Review Comments Erosion Control Plan 2013-08-08� OF AL ,. vIRGI1`IZP COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project: Town & Country Shopping Center — Final Plan preparer: Balzer & Associates [540- 248 -3220] Owner or rep.: Tap Investments, LLC Plan received date: 16 Jul 2013 Date of comments: 8 Aug 2013 Reviewer: Michelle Roberge I have completed the engineering review WP02013 -26. Please see below for the following comments. A. SWM Plan (WP0201300026) 1) [Comment] It appears the stormwater management plan fee has not been paid. Please provide the $300 fee for the engineering review. [Revision 1] Comment addressed. 2) [Comment] It also appears that the grade allows for runoff from the parking lot to the Guadalahara site. Please revise grading to capture as much runoff within site. [Revision 1] Applicant has shown that existing pipe on Guadalahara site is adequate to capture additional runoff from proposed site. 3) [Comment] Please note that 15" pipes are the minimum allowed for the county. [Revision 1] Comment addressed. 4) [Comment] MS -19 shall be addressed for the adequacy of downstream pipes. [Revision 11 Applicant has shown that existing pipe north of site is adequate to capture additional runoff from proposed site. The Town and Country will eventually drain into pond #1 created from the Luxor Development (WP02004 -11). The Town and Country DA was included in the the design of pond #1. B. Erosions Control Plan (WP0201300026) 1) [Comment] It appears that work will be done outside the property line for the Guadalahara connection. Please provide a temporary construction easement from the adjacent property owner. [Revision 11 Comment partially addressed. Please submit a letter from adjacent property owner allowing temporary construction. 2) [Comment] For all other areas, please adjust LOD to be at at or within property line. [Revision 1] Comment addressed. 3) [Comment] It is not clear the phasing of erosion and sediment control plan. I recommend Engineering Review Comments Page 2 of 2 showing separate plans for each phasing. Per minimum standards, please place a sediment trap NW of site with diversion dikes along the northern boundary and western boundary. [Revision 11 Comment partially addressed with the phasing plan now shown. Please place the sediment trap in the NW corner of site for phase 1. For phase 2, you can fill the sediment trap and use the proposed CIP shown on sheet C4. 4) [Comment] In conjunction with comment 3, the stockpile shall be relocated. Also, please show silt fence around the stockpile. [Revision 11 Comment partially addressed with silt fence now shown. In conjunction with comment 3, please place stockpile east of sediment trap. 5) [Comment] The parking area shall be constructed in accordance with VDOT or 6" inches shall be applied immediately following grading for CRS. Please provide note on page C6. [VESH STD & SPEC 3.031 [Revision 11 Comment addressed. 6) [Comment] Silt fence shall be provided north of the Guadalahara connection since grading is shown. [Revision 11 Comment addressed. 7) [Comment] Please revise CE to be 12' wide on sheet C4. [Revision 11 Comment addressed. 8) [Comment] The location of fence south of site blocks construction area for sidewalk. Please re- route fence to allow sidewalk construction. [Revision 1] Comment no longer applicable. Applicant is not proposing to relocate sidewalk. Sincerely, Michelle Roberge