HomeMy WebLinkAboutWPO201100010 Review Comments Mitigation Plan 2013-08-01Ot �1L8n.
`1
��RG[N1P
Proj ect: _
Number:
Date:
Reviewer:
2e L3
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road
Charlottesville, Virginia 22902
WPO Plan Review
o� U
Phone: DI-911-5F23) X33.17
This is an abbreviated review comment notice. County engineering staff is available every Thursday
afternoon to discuss details of review. To schedule, please call your reviewer for an appointment.
Erosion & Sediment Control: Adequate
(Code Chapter 17, Article 11) Not Adequate
Y N
State standards followed, and Design Standards Manual notes and details
Adequate limits and perimeter measures out of work areas
All stages protected adequately
Adequate channels
Stormwater Management: Adequate
(Code Chapter 17, Article III)
Not Adequate
Y N
Enough capture and treatment for on -site areas
Enough detention storage for on -site areas
Sealed hydrologic and hydraulic computations provided
Mitigation: Adequate
(Code Chapter 17, Article III)
Not Adequate
Y N
Buffers and disturbed areas adequately shown
Adequate plant�u}}gs at 2:1, or other mitigation provided /
/krQe►` 0, D µfed r- m4op -t wJer�ry taft, ptid i4,15
Ue L$L Ab Jl-lbeM6,1U Co (k h104, � dakLOR
responsibility for any calculation or plan details, and cannot cover the intricacies of every plan submitted.
Each plan and calculation must have a professional seal and signature to assume these responsibilities.
This plan is
Approved (please see attached Approval Fact Sheet)
Not Approved