Loading...
HomeMy WebLinkAboutWPO201100010 Review Comments Mitigation Plan 2013-08-01Ot �1L8n. `1 ��RG[N1P Proj ect: _ Number: Date: Reviewer: 2e L3 COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road Charlottesville, Virginia 22902 WPO Plan Review o� U Phone: DI-911-5F23) X33.17 This is an abbreviated review comment notice. County engineering staff is available every Thursday afternoon to discuss details of review. To schedule, please call your reviewer for an appointment. Erosion & Sediment Control: Adequate (Code Chapter 17, Article 11) Not Adequate Y N State standards followed, and Design Standards Manual notes and details Adequate limits and perimeter measures out of work areas All stages protected adequately Adequate channels Stormwater Management: Adequate (Code Chapter 17, Article III) Not Adequate Y N Enough capture and treatment for on -site areas Enough detention storage for on -site areas Sealed hydrologic and hydraulic computations provided Mitigation: Adequate (Code Chapter 17, Article III) Not Adequate Y N Buffers and disturbed areas adequately shown Adequate plant�u}}gs at 2:1, or other mitigation provided / /krQe►` 0, D µfed r- m4op -t wJer�ry taft, ptid i4,15 Ue L$L Ab Jl-lbeM6,1U Co (k h104, � dakLOR responsibility for any calculation or plan details, and cannot cover the intricacies of every plan submitted. Each plan and calculation must have a professional seal and signature to assume these responsibilities. This plan is Approved (please see attached Approval Fact Sheet) Not Approved