Loading...
HomeMy WebLinkAboutWPO201300045 Review Comments Stormwater Management Plan 2013-07-24�'IRGINZP WPO Plan Review Project: Lochlyn Hill Phase IA& 1B Number: WP0201300045 Date: _07 -24 -2013 Reviewer: Max Greene COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road Charlottesville, Virginia 22902 Phone: 434 - 296 -5832 ext. 3283 This is an abbreviated review comment notice. County engineering staff is available every Thursday afternoon to discuss details of review. To schedule, please call your reviewer for an appointment. Erosion & Sediment Control: (Code Chapter 17, Article II) Y N Adequate x Not Adequate State standards followed, and Design Standards Manual notes and details Adequate limits and perimeter measures out of work areas All stages protected adequately Adequate channels MS -19 needs to be adequately addressed. Erosion and sediment control Basins are not on County property. Per Erosion and Sediment Control Law, Title 10.1, Chapter 5, Article 4 (10.1- 563.A) of Virginia State Code as found in Chapter 8 page 13 of VESCH the County requests the project be submitted to the Department of Conservation and Recreation for review and approval rather than to each jurisdiction concerned. http: / /www.dcr.vir ig nia.gov/ other / deq / stormwater _management /documents/ Stormwater Management: (Code Chapter 17, Article III) Y N Adequate x Not Adequate Enough capture and treatment for on -site areas Enough detention storage for on -site areas Sealed hydrologic and hydraulic computations provided Per Erosion and Sediment Control Law, Title 10. 1, Chapter 5, Article 4 (10.1- 563.A) of Virginia State Code as found in Chapter 8 page 13 of VESCH the County requests the project be submitted to the Department of Conservation and Recreation for review and approval rather than to each jurisdiction concerned. http: / /www.dcr.virginia.gov /other /deq /stonnwater management/documents Mitigation: (Code Chapter 17, Article III) Adequate Not Adequate Y N F-7 I Buffers and disturbed areas adequately shown Adequate plantings at 2:1, or other mitigation provided N/A This review attempts to encompass the larger compliance questions. County staff does not assume responsibility for any calculation or plan details, and cannot cover the intricacies of every plan submitted. Each plan and calculation must have a professional seal and signature to assume these responsibilities. This plan is Approved (please see attached Approval Fact Sheet) g Not Approved