HomeMy WebLinkAboutWPO201300022 Review Comments Erosion Control Plan 2013-07-31�� OF A
i"
A
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902 -4596
Phone (434) 296 -5832 Fax (434) 972 -4126
Project: Whittington Subdivision — Phase A WP0201300022
Plan preparer: Dominion Engineering [fax 434 - 979 -1681]
Owner or rep.: TRIUMPH WHITTINGTON LLC [8230 Leesburg Pike]
Plan received date: 23 July 2013
Date of comments: 31 July 2013
Reviewer: Max Greene
The Erosion & Sediment Control Plans (WP0201300022) submitted 23 July 2013 has received
Engineering Review and meets Albemarle County minimum checklist items for engineering approval.
The forms and instructions to request the Water Protection Ordinance Bond amount can be found on the
Community Development Department Web site at
http: / /www.albemarle.or /g_upload /images /forms_ center / departments /Community_ Development /forms /bond
sBond Estimate Request Form.pdf
The County requires a Stormwater Management/BMP Facilities Maintenance Agreement document recorded with
the "Clerk of Circuit Court".
Please use the following links for the SWM agreement and procedures:
http:// www.albemarle.oriz/upload/images /forms_ center / departments /Community_Development/forms/En ineering_a
nd WPO Forms/Plan Review -
_Stormwater_Management_BMP_ Facilities _ Maintenance—Agreement Procedures.pdf
http:/ /www.albemarle.org�pload/imaizes /forms_ center / departments /Community_Development/forms/En ineering_a
nd_WPO_Forms/Plan_ Review_- _Stormwater_ Management _BMP_ Facilities _ Maintenance_Agreement.pdf
You may contact Ana Kilmer (Albemarle County Department of Community Development) at ext. 3246
for further information on bonding procedures and Maintenance Agreements.
Once the WPO bonds have been posted, you may contact the Department of Community Development to
arrange a pre - construction meeting with a County Erosion & Sediment Control Inspector. Should the
County Inspector find the limits of disturbance increased or the need for additional control measures
required to protect the site, additional fees will be required.
[17 -204.0 An approved erosion and sediment control plan shall be void if the owner fails to obtain a grading, building, or other
permit for activities involving land disturbing activities within one (1) year after the date of the approval.
File: F &SC Approval letter.doc