Loading...
HomeMy WebLinkAboutWPO201300022 Review Comments Bond Estimate 2013-08-12 (3)Project Name Whittington Subdivision - Phase A WPO file number: WP0201300022 Erosion and Sediment Control Bond Estimate Item Item Number stablization (PS, TS) Unit Cost Cos 0 (installed) silt fence (SF) 23.7 acres $5,000.00 $118,500.00 5500.0 ft safety fence (SAF) $27,500.00 1450.0 ft $5.00 $7,250.00 diversion (DD, FD, RVVD) $13.00 $9,750.00 0.0 $35.00 temporary slope drain (TSD) pipe length 20 ft pipe diameter 15 in 1 temporary sediment trap (ST or CIP) $3,500.00 $60.00 $9.00 height of dam at toe 1.8 ft cut at dam 3 ft $500.00 height of dam at face 1.8 ft cut at high side loft length of dam 50 ft length of cut 50 ft contingency top width 2 ft width of cut 15 ft $432,280 (camp. fill vol) 36.7 cy (cut Vol) 493.5 cy length of spillway 30 ft (cy esQ 505.7 width of spillway 9 ft (spillway stone tons) 30 1 temporary sediment basin (Sal height of dam at toe 8 ft cut at dam 3 ft height of dam at face 6 ft cut at high side 6 ft length of dam 120 ft length of cut 119 ft top width loft width of cut 96 ft (comp. fill Vol) 1431.1 cy (cut Vol) 2261.0 cy length of spillway 100 ft (cy esQ 2738.0 width of spillway 15 ft (spillway stone tons) 225 riser height 7 ft riser diameter 48 in (riser unit price) $150.00 barrel length 75 ft (price of base) $200 barrel diameter 24 in (barrel unit price) $50.00 barrel collars 2 baffle length 15 ft 2 temporary sediment basin (SB) height of dam at toe 8 ft cut at dam 0 ft height of dam at face 4 ft cut at high side 6 ft length of dam 150 ft length of cut 95 ft top width 10 ft width of cut 59 ft (comp. fill Vol) 1400.0 cy (cut .1) 749.4 cy length of spillway 160 ft (cy est) 1649.8 width of spillway loft (spillway stone tons) 240 riser height 7 ft riser diameter 48 in (riser unit price) $150.00 barrel length 80 ft (price of base) $200 barrel diameter 24 in (barrel unit price) $50.00 barrel collars 2 baffle length 70 ft 3 temporary sediment basin (SB) height of dam at toe 4 ft cut at dam 0 ft height of dam at face 4 ft cut at high side 4 ft length of dam 220 ft length of cut 118 ft top width loft width of cut 49 ft (comp. fill Vol) 977.8 cy (cut Vol) 498.2 cy length of spillway 35 ft (cy esQ 1143.9 width of spillway loft (spillway stone tons) 52.5 riser height 2.4 ft riser diameter 18 in (riser unit price) $40.00 barrel length 50 ft (price of base) $200 barrel diameter 12 in (barrel unit price) $35.00 barrel collars 1 baffle length 136 ft sift fence inlet protection (IP) stone inlet protection (IP) outlet protection (OP) length 15 ft width 10 ft channel (SCC, matted) length 3875 ft width 8 ft check dam depth in channel 1 ft channel width 8 ft construction entrance (CE) wash rack paved construction entrance rip -rap, placed depth 2 ft length 1.0 ft width 1.0 (tons) 0.15 survey and layout (price per 0.1 mi.) acres 1 traps and basins 2 mobilization stream crossing (computed independently) No. Unit Unit Cost Cos 0 (installed) $0.00 23.7 acres $5,000.00 $118,500.00 5500.0 ft $5.00 $27,500.00 1450.0 ft $5.00 $7,250.00 750 ft $13.00 $9,750.00 0.0 $35.00 $1,200.00 $13.00 $50.00 $8,074.63 $13.00 $50.00 $46,844.48 In= $13.00 $50.00 $33,447.59 films $13.00 $50.00 $17,495.07 Method for VolumE (tenth) x (total widt assume face at 2: total width = 3x(to, average height = ( 8/12/2013 $4,966.00 0 $100.00 $0.00 5 $200.00 $1,000.00 6 $675.00 $4,050.00 $40,300.00 6 $180.00 $1,080.00 0 $2,000.00 $0.00 1 $2,000.00 $2,000.00 1 $3,500.00 $3,500.00 $60.00 $9.00 $1,500.00 $500.00 cost sum $341,716.78 proj mgmt $51,257.52 contingency $39,297.43 Total $432,280 Method for VolumE (tenth) x (total widt assume face at 2: total width = 3x(to, average height = ( 8/12/2013