Loading...
HomeMy WebLinkAboutWPO201300022 Review Comments Bond Estimate 2013-08-12Project Name Whittington Subdivision - Phase A WPO file number: WP0201300022 Stormwater Management Plan Bond Estimate Item tem Cost 0 ea (installed) $0.00 Number $13.00 $0.00 0 as $500.00 $0.00 0 ft sitecleaang $0.00 0 EC -1 0.0 ft $0.00 $0.00 630 ft permanent diversion or ditch $31,500.00 0.0 ton $35.00 $0.00 standard manhole frame top (not inlet) $0.00 $2,000.00 manhole structure (per ft. nse) $500.00 1 ea $2,000.00 $2,000.00 1 as pipe, mp, cmp(15 to 48') 0.0 in 0ES -1,2 $5,000.00 basin height of dam at toe 0 ft cut at dam 0 ft height of dam at face 0 ft out at high side 0 ft length of dam 260 ft length of out 0 ft top width 0 ft width of out 0 ft (comp. fill vcl) 0.0 cy (cut vcl) 0.0 cy length of spillway 0 ft my set) 0.0 width of spillway 0 ft (spillway stone tons) 0 (pace of base) $0 barrel collars 0 baffle length 0 ft trees shrubs seedlings underdrain (LF) biofilter sail mix (C1) trash rack/ anti vortex devices maintenance access road (LF) aggregate base or drainage stone 0.0 ft d 0.0 ft L 0.0 ft W 2 basin height of dam at toe 0 ft cut at dam 0 ft height of dam at face 0 ft out at high side 0 ft length of dam 260 ft length of out 0 ft top width 0 ft width of out 0 ft (comp. fill vcl) 0.0 cy (cut Vol) 0.0 cy length of spillway 0 ft my set) 0.0 width of spillway 0 ft (spillway stone tons) 0 (pace of base) $0 barrel collars 0 baffle length 0 ft trees shrubs seedlings underdrain (LF) biofilter sail mix (C1) trash rack/ anti vortex devices maintenance access road (LF) aggregate base or drainage stone 1.0 ft d 130.0 ft L 20.0 ft W 3 basin height of dam at toe 0 ft cut at d- 0 ft height of dam at face 0 ft cut at high side 0 ft length of dam 260 ft length of cut 0 ft top width 0 ft width of cut 0 ft (comp. fill Vol) 0.0 cy (cut Vol) 0.0 cY length of spillway 0 ft (cy set) 0.0 width of spillway 0 ft (spillway stone tons) 0 (price of base) $0 barrel collars 0 baffle length 0 ft trees shrubs seedlings underdmin (Li biofilter sail mix (C1) trash rack/ anti vortex devices maintenance access road (LF) aggregate base or drainage stone 1.0 ft d 80.0 ft L 30.0 ft W rip-rap, placed depth 0 ft length 1.0 ft width 0.0 (tons) 0 survey and layout (pace per 0.1 mi.) acres 1 basins 3 mobilization as -built drawings (per facility) materials testing (per facility) compaction testing (per dam) manufactured facilities (attach manufacturer's or contractors price as a base No. Unit Unit Cost Cost 0 ea (installed) $0.00 0 ft $13.00 $0.00 0 as $500.00 $0.00 0 ft $450.00 $0.00 0 EC -1 0.0 ft $0.00 $0.00 $13.00 $50.00 $0.00 $0.00 0 ea $150.00 $0.00 0 ea $50.00 $0.00 570 ea $5.00 $2,850.00 0 ft $5.00 $0.00 0 cy $38.00 $0.00 1 ft $1,500.00 $1,500.00 630 ft $50.00 $31,500.00 0.0 ton $35.00 $0.00 $13.00 $50.00 $0.00 $0.00 21 ea $150.00 $3,150.00 63 ea $50.00 $3,150.00 0 ea $5.00 $0.00 126 ft $5.00 $630.00 313 cy $38.00 $11,894.00 1 ft $1,500.00 $1,500.00 1000 ft $50.00 $50,000.00 2600.0 ton $35.00 $91,000.00 $13.00 $50.00 $0.00 $0.00 13 ea $150.00 $1,950.00 38 as $50.00 $1,900.00 0 ea $5.00 $0.00 120 ft $5.00 $600.00 305 cy $38.00 $11,590.00 0 ft $1,500.00 $0.00 0 ft $50.00 $0.00 2400.0 ton $35.00 $84,000.00 $60.00 $0.00 $2,000.00 $500.00 1 ea $2,000.00 $2,000.00 1 as $2,000.00 $2,000.00 1 ea $5,000.00 $5,000.00 cost sum $308,714.00 prof mgmt $46,307.10 contingency $35,502.11 Total $390,530 8/12/2013