Loading...
HomeMy WebLinkAboutWPO201300004 Review Comments Bond Estimate 2013-08-08Ivy Creek United Methodist Church WPO file number: WP0201300004 Stormwater Management Plan Bond Estimate Item Item $3,816.93 contingency $2,926.32 Total No. Unit Unit Cost Cost Number installed 1 site clearing 2 permanent diversion or ditch 0 fl $13.00 $0.00 3 Infiltration Trench 1 Isum $3,635.00 $3,635.00 4 manhole structure (per ft. rise) 0 fl $450.00 $0.00 5 pipe, rcp, cmp (15 to 48 ") 15.0 in d 0 ES -1,2 1 EC -1 25.0 fl $35.00 $1,375.00 6 aggregate base or drainage stone 0.0 in d 1.0 ft L 0.0 ft W 35.0 ton $35.00 $1,225.00 7 basin height of dam at toe 5 fl cut at dam 0 ft height of dam at face 3.5 fl cut at high side 4.25 ft length of dam 55 fl length of cut 45 ft top width 4.5 fl width of cut 45 ft (comp. fill Vol) 229.4 cy (cut Vol) 189.5 cy $13.00 length of spillway 8.82 fl (cy esl) 292.6 width of spillway 4.5 fl (spillway stone tons) 5.9535 $50.00 $4,101.23 (price of base) $0 barrel collars 0 baffle length 0 ft $0.00 8 trees 0 as $150.00 $0.00 9 shrubs 16 ea $50.00 $800.00 10 seedlings 0 ea $5.00 $0.00 11 underdrain (LF) 58 fl $5.00 $290.00 12 biofiller soil mix (C10 40 cy $38.00 $1,520.00 13 trash rack/ anti vortex devices 1 fl $1,500.00 $1,500.00 14 maintenance access road (LF) 0 fl $50.00 $0.00 15 rip -rap, placed depth 0 fl length 1.0 ft width 0.0 (tons) 0 $60.00 $0.00 16 survey and layout (price per 0.1 mi.) acres 1 basins 2 $1,500.00 17 mobilization $500.00 18 as -built drawings (per facility) 1 ea $2,000.00 $2,000.00 19 materials testing (per facility) 1 ea $2,000.00 $2,000.00 20 compaction testing (per dam) 1 ea $5,000.00 $5,000.00 cost sum $25,446.23 proj mgmt $3,816.93 contingency $2,926.32 Total $32,190 C:\ Users \mkoslow\ Documents \CurrentReviews \WP0201300004 Ivy Creek United Methodist Church\ 2013- 08- 07- SWM_bond_estimate_WPO2013 -00004 8/8/2013