Engineering has completed the Site Development Plan review. Please see below for the following
comments.
A. Site Development Plan (SDP201300047)
Please label proposed streets as public, private or alley. If streets are private/alley, please ensure it
meets private road standards from section 14-410 and 14-412.
Comment not addressed. Please show crowned road with curb and gutter.
2. I recommend aligning the far western entrance with the Laurel Park Subdivision entrance.
Comment addressed.
Please provide typical sections and profiles for proposed street.
Comment addressed.
4. Per 14-410 H, please show curb and gutter for proposed street. Please show standard entrance
gutter, CG -9D, and improve runoff catchement by placing additional DI's. Also, a DI shall be
placed before intersections. Please provide a DI near lot 7.
Comment not addressed. Provide curb and gutter for road with the standard CG -9D for
each driveway entrance. The painted white line is not recommended.
5. Please show the sight distances. 280' is VDOT requirement for 25 mph roads. Also, per 18-4.12
please ensure 100' sight distance for travelways within site.
Comment not addressed. Remove trees within all required sight distances.
6. Lots 15-22 do not have adequate frontage access due to horizontal curve. Please revise.
Comment addressed.
7. All entrances shall be a 4% grade or less for a minimum of 40' from the edge of pavement at the
intersected street. The entrance on the far west is about 6% for 20'.
Comment partially addressed. Ensure the flow line on CG -11 entrance is aligned with flow
line to DI -1. Also, update profile to show the sag at flow line.
Engineering Review Comments
Page 2 of 2
Please provide the Albemarle County general construction notes for streets.
Comment addressed.
9. Please provide traffic control signage.
Comment addressed.
10. Please ensure all items in proffer 2 are addressed prior to approval of site plan. Per proffer 3, "All
road improvements listed in proffer 2 above shall be substantially completed prior to the issuance
of the first Certificate of Occupancy in Area C..."
Comment not addressed.
New Comment
11. Please label ROW on private roads.
12. Please provide street signs.
13. Change the white hatching of light duty pavement on SP5.
14. Clearly show limits of removal for the 15" RCP on SP3.
15. Show handicap ramp symbols on plans and not just labels.
16. It appears there is a concrete median between each driveway. Will this be concrete, a
planting strip or gravel? Please clarify. Also, note a minimum of 3' should be provided for a
concrete median.
17. Clarify what will be in the 6' median between each driveway. Grass or gravel?
18. Please label Laurel Park Lane as public or private.
Sincerely,