From: Austin, Nathran. (VDOT) [Nathran .Austin @vdot.virginia.gov]
Sent: Thursday, August 22, 201310:00 AM
To: Max Greene
Cc: Glenn Brooks
Subject: New Hope Church
Good morning Max. I just spoke with Basil Finnegan from Blackwell Engineering concerning this project. He
indicated that there is a revision to the site plan more recent than the 6/28/13 revision that I am currently
reviewing. He had indicated that one of the revisions is showing wet storage for a sediment trap at the culvert
under Dickerson Road. This trap would be located in the State right -of -way. I'm not going to allowthis for a
couple of reasons. First of all, the excavation of a hole this close to the road poses a safety concern.
Secondly, an excavated area that close to the road provides an opportunity for water to infiltrate into the
subgrade of the road, posing potential maintenance issues. These sediment trap needs to be located on site
for this project. I had suggested using the location of the underground detention as the sediment trap during
construction. The construction entrance would need to be shifted to allowthis, but I believe that could be
accomplished. The detention area is going to need to be excavated at some point, so why not utilize the
excavated area during construction? The detention area /sediment trap and the final entrance would have to
be one of the last items constructed on this project, but if everything upstream was permanently stabilized,
the sediment trap would not be necessary and could be converted to the underground detention. Just a
thought, I'm sure there are other options as well.
Troy Austin, P.E.
Area Land Use Engineer
Virginia Department of Transportation
Land Development —South
Culpeper District
P.O. Box 1017
Troy, VA 22974
Phone: (434) 589 -5871
Fax: (434) 589-3967
file:// cob- dts01/ CityViewi _nWDocs /2013/WPO/WP0201300049- New Hope Church/VDOT Comment New Hope Church.htm 1/1