HomeMy WebLinkAboutWPO201300038 Review Comments Erosion Control Plan 2013-09-17Michelle Roberge
From: Michelle Roberge
Sent: Tuesday, September 17, 2013 11:53 AM
To: 'mbuswell @hazenandsawyer.com'
Subject: E3_esc_Rivanna Pump Station & Interceptor Tunnel
Hello Matthew,
Please consider this as the official approval notice for WPO2013 -38. There is one slight change to the note on sheet C-
10. See attached. Please revise the plans and resubmit 4 signed copies which I will then stamp "approved." Thanks!
El
E3_esc_Rivanna EngApprovalFactS
Pump Station & ... heet.doc
- Michelle
Michelle Roberge
Department of Community Development
County of Albemarle, Virginia
401 McIntire Road i Charlottesville, VA 22902
434.296.5832 ext. 3458
�RGICn4'
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road
Charlottesville, Virginia 22902
WPO Plan Review
Project: Rivanna Pump Station and Interceptor Tunnel
Number: WP02013 -38
Plan Received Date: 28 Aug 2013
Review Date: 17 Sep 2013
Reviewer: Michelle Roberge
This is an abbreviated review comment notice. County engineering staff is available every Thursday
afternoon to discuss details of review. To schedule, please call your reviewer for an appointment.
Erosion & Sediment Control:
(Code Chapter 17, Article II)
X Adequate
Not Adequate
Y N
X State standards followed, and Design Standards Manual notes and details
X Adequate limits and perimeter measures out of work areas
X All stages protected adequately
X Adequate channels
Stormwater Management:
(Code Chapter 17, Article 111)
M N
X Adequate
Not Adequate
Enough capture and treatment for on -site areas
Enough detention storage for on -site areas
Sealed hydrologic and hydraulic computations provided
- Please note that previous design under WP02008 -79 was approved to
allow no treatment for area north of pump station. This current
design is mimicking this and therefore I will approve. Please note that
for all future projects impervious areas should be treated to the
maximum amount possible.
- Change note 5 on Sheet C10 to revise portion of note to
"...perforations shall contain at least 6 holes."
- Contractor shall provide manufacturer's certification.
Mitigation:
(Code Chapter 17, Article III) Adequate
Not Adequate
Y N
F__T I Buffers and disturbed areas adequately shown
Adequate plantings at 2:1, or other mitigation provided
N/A
This review attempts to encompass the larger compliance questions. County staff does not assume
responsibility for any calculation or plan details, and cannot cover the intricacies of every plan submitted.
Each plan and calculation must have a professional seal and signature to assume these responsibilities.
This plan
X Approved (please see attached Approval Fact Sheet)
Not Approved
is
�pF A
vt�r�1Q
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902 -4596
Phone (434) 296 -5832 Fax (434) 972 -4126
Project: Moores Creek WWTP - Rivanna Pump Station and Interceptor Tunnel
Plan preparer: Hazen and Sawyer
Owner or rep.: Rivanna Water & Sewer Authority
Plan received date: 3 Jun 2013
Date of comments: 1 Jul 2013
Reviewer: Michelle Roberge
A. Erosion and Sediment Control Plan (WP0201300038)
1. The SWM management application and fee have not been submitted at this time. This review is
for erosion and sediment control only.
2. Since it is not clear if the tunnel is being proposed at this time, also clarify if the stockpiles are for
both the pump station and the interceptor tunnel, or the pump station only. This information is
necessary to determine if the proposed erosion control measures around the stockpiles are
adequate.
3. Any stockpile taken offsite will require a permit.
4. The erosion control measure for the stockpiles shall wrap around entire stockpile location. Please
show on sheet C5 and C6.
5. On C5 and C6, all construction entrances shall be, at a minimum, 12'x 70'. [VESH 3.021
6. The access road, from note 7 on sheet C6, shall show a CRS. The slope shall not exceed 10 %.
Roadbeds shall be at least 14' wide for one way and 20' for two way. [VESH 3.031
7. Please place the TS and DC symbols on sheet C5.
8. Stockpile #1 is within the floodplain. Please relocate outside of floodplain. [Section 30.3.04 -
Prohibited Uses]
9. On sheet C5, I recommend placing note #19 within the limits of Stockpile # 2, so it is clear this
area will only be used after the completion of the digester project.
10. Is the proposed gravel entrance for RWSA personnel temporary or permanent?
11. On the SW corner of sheet C6, I recommend revising the silt fence to follow the 316 & 318
contour. Silt fences do not work well on slopes.
Sincerely,
Michelle Roberge
�RGICn4'
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road
Charlottesville, Virginia 22902
WPO Plan Review
Project: Rivanna Pump Station and Interceptor Tunnel
Number: WP02013 -38
Plan Received Date: 21 Jan 2014
Review Date: 27 Jan 2014
Reviewer: Michelle Roberge
This is an abbreviated review comment notice. County engineering staff is available every Thursday
afternoon to discuss details of review. To schedule, please call your reviewer for an appointment.
Erosion & Sediment Control:
(Code Chapter 17, Article II)
Adequate
X Not Adequate
Y N
X State standards followed, and Design Standards Manual notes and details
X Adequate limits and perimeter measures out of work areas
X All stages protected adequately
X Adequate channels
- Please show tunnel profile within Albemarle County limits only.
(Gray out section within Charlottesville limits). Label the station at end
of County limits.
- Calculate amount of borrow from tunnel and pump station.
-Show proposed grades for stockpile areas and label cf or cy of
stockpile in each designated stockpiling area. Note max grade for slope
is 2:1. (We need to verify if stockpile locations are adequate)
-It appears a staging area for tunnel boring is required near the pump
station. Show phasing since pump station excavation may not be
possible until after the tunnel is drilled.
Stormwater Management:
(Code Chapter 17, Article III)
M N
Adequate
X Not Adequate
Enough capture and treatment for on -site areas
- Please note that previous design under WP02008 -79 was approved to
allow no treatment for area north of pump station. This current
design is mimicking this. Please note that for all future projects
impervious areas should be treated to the maximum amount possible.
Enough detention storage for on -site areas
Sealed hydrologic and hydraulic computations provided
- Certain pipes for storm drains changed. Provide updated calcs,
sealed and signed.
- Change note 5 on Sheet C10 to revise portion of note to
"...perforations shall contain at least 6 holes."
- Contractor shall provide manufacturer's certification.
Mitigation:
(Code Chapter 17, Article I1I) Adequate
Not Adequate
Y N
Buffers and disturbed areas adequately shown
Adequate plantings at 2:1, or other mitigation provided
N/A
This review attempts to encompass the larger compliance questions. County staff does not assume
responsibility for any calculation or plan details, and cannot cover the intricacies of every plan submitted.
Each plan and calculation must have a professional seal and signature to assume these responsibilities.
This plan
Approved (please see attached Approval Fact Sheet)
X Not Approved
is
�RGICn4'
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road
Charlottesville, Virginia 22902
WPO Plan Review
Project: Rivanna Pump Station and Interceptor Tunnel
Number: WP02013 -38
Plan Received Date: 3 Feb 2014
Review Date: 10 Feb 2014
Reviewer: Michelle Roberge
This is an abbreviated review comment notice. County engineering staff is available every Thursday
afternoon to discuss details of review. To schedule, please call your reviewer for an appointment.
Erosion & Sediment Control:
(Code Chapter 17, Article II)
lip
Adequate
X Not Adequate
X State standards followed, and Design Standards Manual notes and details
X Adequate limits and perimeter measures out of work areas
X All stages protected adequately
X Adequate channels
Please show on a plan the waste /disposal area for the remainder of
excavated material.
Stormwater Management:
(Code Chapter 17, Article III)
M 'l
X Adequate
Not Adequate
Enough capture and treatment for on -site areas
- Please note that previous design under WP02008 -79 was approved to
allow no treatment for area north of pump station. This current
design is mimicking this. Please note that for all future projects
impervious areas should be treated to the maximum amount possible.
Enough detention storage for on -site areas
Sealed hydrologic and hydraulic computations provided
Mitigation:
(Code Chapter 17, Article 111) Adequate
Not Adequate
Y N
Buffers and disturbed areas adequately shown
Adequate plantings at 2:1, or other mitigation provided
N/A
This review attempts to encompass the larger compliance questions. County staff does not assume
responsibility for any calculation or plan details, and cannot cover the intricacies of every plan submitted.
Each plan and calculation must have a professional seal and signature to assume these responsibilities.
This plan
Approved (please see attached Approval Fact Sheet)
X Not Approved
is
Michelle Roberge
From: Michelle Roberge
Sent: Tuesday, September 17, 2013 11:53 AM
To: 'mbuswell @hazenandsawyer.com'
Subject: E3_esc_Rivanna Pump Station & Interceptor Tunnel
Hello Matthew,
Please consider this as the official approval notice for WPO2013 -38. There is one slight change to the note on sheet C-
10. See attached. Please revise the plans and resubmit 4 signed copies which I will then stamp "approved." Thanks!
El
E3_esc_Rivanna EngApprovalFactS
Pump Station & ... heet.doc
- Michelle
Michelle Roberge
Department of Community Development
County of Albemarle, Virginia
401 McIntire Road i Charlottesville, VA 22902
434.296.5832 ext. 3458
�RGICn4'
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road
Charlottesville, Virginia 22902
WPO Plan Review
Project: Rivanna Pump Station and Interceptor Tunnel
Number: WP02013 -38
Plan Received Date: 28 Aug 2013
Review Date: 17 Sep 2013
Reviewer: Michelle Roberge
This is an abbreviated review comment notice. County engineering staff is available every Thursday
afternoon to discuss details of review. To schedule, please call your reviewer for an appointment.
Erosion & Sediment Control:
(Code Chapter 17, Article II)
X Adequate
Not Adequate
Y N
X State standards followed, and Design Standards Manual notes and details
X Adequate limits and perimeter measures out of work areas
X All stages protected adequately
X Adequate channels
Stormwater Management:
(Code Chapter 17, Article 111)
M N
X Adequate
Not Adequate
Enough capture and treatment for on -site areas
Enough detention storage for on -site areas
Sealed hydrologic and hydraulic computations provided
- Please note that previous design under WP02008 -79 was approved to
allow no treatment for area north of pump station. This current
design is mimicking this and therefore I will approve. Please note that
for all future projects impervious areas should be treated to the
maximum amount possible.
- Change note 5 on Sheet C10 to revise portion of note to
"...perforations shall contain at least 6 holes."
- Contractor shall provide manufacturer's certification.
Mitigation:
(Code Chapter 17, Article III) Adequate
Not Adequate
Y N
F__T I Buffers and disturbed areas adequately shown
Adequate plantings at 2:1, or other mitigation provided
N/A
This review attempts to encompass the larger compliance questions. County staff does not assume
responsibility for any calculation or plan details, and cannot cover the intricacies of every plan submitted.
Each plan and calculation must have a professional seal and signature to assume these responsibilities.
This plan
X Approved (please see attached Approval Fact Sheet)
Not Approved
is
�RGICn4'
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road
Charlottesville, Virginia 22902
WPO Plan Review
Project: Rivanna Pump Station and Interceptor Tunnel
Number: WP02013 -38
Plan Received Date: 21 Jan 2014
Review Date: 27 Jan 2014
Reviewer: Michelle Roberge
This is an abbreviated review comment notice. County engineering staff is available every Thursday
afternoon to discuss details of review. To schedule, please call your reviewer for an appointment.
Erosion & Sediment Control:
(Code Chapter 17, Article II)
Adequate
X Not Adequate
Y N
X State standards followed, and Design Standards Manual notes and details
X Adequate limits and perimeter measures out of work areas
X All stages protected adequately
X Adequate channels
- Please show tunnel profile within Albemarle County limits only.
(Gray out section within Charlottesville limits). Label the station at end
of County limits.
- Calculate amount of borrow from tunnel and pump station.
-Show proposed grades for stockpile areas and label cf or cy of
stockpile in each designated stockpiling area. Note max grade for slope
is 2:1. (We need to verify if stockpile locations are adequate)
-It appears a staging area for tunnel boring is required near the pump
station. Show phasing since pump station excavation may not be
possible until after the tunnel is drilled.
Stormwater Management:
(Code Chapter 17, Article III)
M N
Adequate
X Not Adequate
Enough capture and treatment for on -site areas
- Please note that previous design under WP02008 -79 was approved to
allow no treatment for area north of pump station. This current
design is mimicking this. Please note that for all future projects
impervious areas should be treated to the maximum amount possible.
Enough detention storage for on -site areas
Sealed hydrologic and hydraulic computations provided
- Certain pipes for storm drains changed. Provide updated calcs,
sealed and signed.
- Change note 5 on Sheet C10 to revise portion of note to
"...perforations shall contain at least 6 holes."
- Contractor shall provide manufacturer's certification.
Mitigation:
(Code Chapter 17, Article I1I) Adequate
Not Adequate
Y N
Buffers and disturbed areas adequately shown
Adequate plantings at 2:1, or other mitigation provided
N/A
This review attempts to encompass the larger compliance questions. County staff does not assume
responsibility for any calculation or plan details, and cannot cover the intricacies of every plan submitted.
Each plan and calculation must have a professional seal and signature to assume these responsibilities.
This plan
Approved (please see attached Approval Fact Sheet)
X Not Approved
is
�RGICn4'
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road
Charlottesville, Virginia 22902
WPO Plan Review
Project: Rivanna Pump Station and Interceptor Tunnel
Number: WP02013 -38
Plan Received Date: 3 Feb 2014
Review Date: 10 Feb 2014
Reviewer: Michelle Roberge
This is an abbreviated review comment notice. County engineering staff is available every Thursday
afternoon to discuss details of review. To schedule, please call your reviewer for an appointment.
Erosion & Sediment Control:
(Code Chapter 17, Article II)
lip
Adequate
X Not Adequate
X State standards followed, and Design Standards Manual notes and details
X Adequate limits and perimeter measures out of work areas
X All stages protected adequately
X Adequate channels
Please show on a plan the waste /disposal area for the remainder of
excavated material.
Stormwater Management:
(Code Chapter 17, Article III)
M 'l
X Adequate
Not Adequate
Enough capture and treatment for on -site areas
- Please note that previous design under WP02008 -79 was approved to
allow no treatment for area north of pump station. This current
design is mimicking this. Please note that for all future projects
impervious areas should be treated to the maximum amount possible.
Enough detention storage for on -site areas
Sealed hydrologic and hydraulic computations provided
Mitigation:
(Code Chapter 17, Article 111) Adequate
Not Adequate
Y N
Buffers and disturbed areas adequately shown
Adequate plantings at 2:1, or other mitigation provided
N/A
This review attempts to encompass the larger compliance questions. County staff does not assume
responsibility for any calculation or plan details, and cannot cover the intricacies of every plan submitted.
Each plan and calculation must have a professional seal and signature to assume these responsibilities.
This plan
Approved (please see attached Approval Fact Sheet)
X Not Approved
is
�RGICn4'
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road
Charlottesville, Virginia 22902
WPO Plan Review
Project: Rivanna Pump Station and Interceptor Tunnel
Number: WP02013 -38
Date: 31 Jul 2013
Reviewer: Michelle Roberge
This is an abbreviated review comment notice. County engineering staff is available every Thursday
afternoon to discuss details of review. To schedule, please call your reviewer for an appointment.
Erosion & Sediment Control: Adequate
(Code Chapter 17, Article I1) Not Adequate
Y N
State standards followed, and Design Standards Manual notes and details
Adequate limits and perimeter measures out of work areas
All stages protected adequately
Adequate channels
N/A
Stormwater Management:
(Code Chapter 17, Article III)
Y N
Adequate
X Not Adequate
Enough capture and treatment for on -site areas
Enough detention storage for on -site areas
Sealed hydrologic and hydraulic computations provided
-The pre condition shows 2.32 acres being treated. Post condition
shows only 1.78 acres being treated. Please provide treatment for 2.32
acres.
-For SWM facility, provide more detail, dimensions, and cross sections
of each chamber. Clarify baffle details.
- Verify all items from VSMH (3.12A -5 to 3.12A -8) are provided.
- Provide manufacturers certification.
Mitigation:
(Code Chapter 17, Article I1I) Adequate
Not Adequate — Provide a mitigation plan
Y N
Buffers and disturbed areas adequately shown
Adequate plantings at 2:1, or other mitigation provided
- Disturbance of 100' stream buffer will be allowed per 17- 321.1, but a
mitigation plan must be submitted and approved. See Albemarle
County Design Manual.
This review attempts to encompass the larger compliance questions. County staff does not assume
responsibility for any calculation or plan details, and cannot cover the intricacies of every plan submitted.
Each plan and calculation must have a professional seal and signature to assume these responsibilities.
This plan is
Approved (please see attached Approval Fact Sheet)
g Not Approved