Loading...
HomeMy WebLinkAboutSUB201300131 Review Comments Final Plat 2013-09-19*—&A County of Albemarle Department of Community Development The final subdivision plat has been reviewed: 1. Final plat approval cannot precede final road plan (SUB2013- 00030; not yet approved) or WPO plan (WP02013- 00016; not yet approved) approval for Westlake Hills Phase 1. 2. Pro -rata share payment to Lickinghole Basin for stormwater treatment is required prior to WPO plan approval. 3. Please indicate proposed water and sewer lines, proposed drainage lines and structures, fire hydrants, and proposed stormwater management facilities outside of dedicated public R/W after approved on Westlake Hills Phase 1 road and WPO plans. 4. Please indicate easements for proposed mitigation (MIT) areas proposed with WPO plans on final plat after WPO plan approval. A VDOT accepted public road or a subdivision - road bond will need to be posted for roads proposed with Westlake Hills Phase 1 road plan prior to the approval of the final plat. 6. Subdivision — water & sewer (by ACSA) and WPO (ESC and SWM including MIT by the county) bonds will need to be posted prior to the approval of the final plat. 7. A stormwater management maintenance agreement will be required for Westlake Hills Phase 1 prior to grading permit approval. This is recommended prior to final plat approval. C: ,incLpub\ ,_ - - t ,cit v i i z - _iictic znL�g° t i - n \t �mpd.—,ti-ia 03 Memorandum To: Ellie Ray, Project Planner From: Michael Koslow, Engineering Review (SUB201300131) Project: Westlake Hills (Phase 1) - Final Plat Plan preparer: Roudabush, Gale & Associates Inc. [434- 977 -0205] Owner or rep.: Lickinghole Creek, LLC Plan received date: 10 September 2013 Date of comments: 19 September 2013 Reviewer: Michael Koslow The final subdivision plat has been reviewed: 1. Final plat approval cannot precede final road plan (SUB2013- 00030; not yet approved) or WPO plan (WP02013- 00016; not yet approved) approval for Westlake Hills Phase 1. 2. Pro -rata share payment to Lickinghole Basin for stormwater treatment is required prior to WPO plan approval. 3. Please indicate proposed water and sewer lines, proposed drainage lines and structures, fire hydrants, and proposed stormwater management facilities outside of dedicated public R/W after approved on Westlake Hills Phase 1 road and WPO plans. 4. Please indicate easements for proposed mitigation (MIT) areas proposed with WPO plans on final plat after WPO plan approval. A VDOT accepted public road or a subdivision - road bond will need to be posted for roads proposed with Westlake Hills Phase 1 road plan prior to the approval of the final plat. 6. Subdivision — water & sewer (by ACSA) and WPO (ESC and SWM including MIT by the county) bonds will need to be posted prior to the approval of the final plat. 7. A stormwater management maintenance agreement will be required for Westlake Hills Phase 1 prior to grading permit approval. This is recommended prior to final plat approval. C: ,incLpub\ ,_ - - t ,cit v i i z - _iictic znL�g° t i - n \t �mpd.—,ti-ia 03