Project: New Hope Church — Early Grading Plan WP0201300061
Plan preparer: Blackwell Engineering [fax 540- 349 -0321]
Owner or rep.: New Hope Community Church; Michael Henderson Trustee
Plan received date: 19 September 2013
Date of comments: 24 September 2013
Reviewer: Max Greene
The Erosion & Sediment Control Plans (WP0201300061) submitted 19 September 2013 has
received Engineering Review and meets Albemarle County minimum checklist items for
engineering approval. This is an early grading plan and does not authorize the installation of
hardscape as shown on the Initial Site Plan Submittal. This WPO plan approval is for earth
moving, and erosion and sediment control installations as shown on the plan. Once the Final Site
plan and Final Water Protection Plans are approved, a new WPO bond amount will be generated
to replace the early grading bond amount.
The forms and instructions to request the Water Protection Ordinance Bond amount can be found
on the Community Development Department Web site at
hqp:// www.albemarle.org/upload/images /forms_ center / departments /Community Development/f
orms/ bonds /Bond_ EstimateReguestForm.pdf
You may contact Ana Kilmer (Albemarle County Department of Community Development) at
ext. 3246 for further information on bonding procedures.
Once the E &SC bond has been posted, you may contact the Department of Community
Development to arrange a pre - construction meeting with a County Erosion & Sediment Control
Inspector. Should the County Inspector find the limits of disturbance increased or the need for
additional control measures required to protect the site, additional fees will be required.
[17- 204.G] An approved erosion and sediment control plan shall be void if the owner fails to obtain a grading,
building, or other permit for activities involving land disturbing activities within one (1) year after the date of the
approval.
File: E &SC Approval letter.doc