Loading...
HomeMy WebLinkAboutARB201300137 Review Comments Minor Amendment 2013-10-10pF AL �411111QM MY /:\ 45114 � Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 October 10, 2013 Scott Collins Collins Engineering 200 Garrett Street, Suite K Charlottesville, VA 22902 RE: ARB- 2013 -137: Microaire Amendment Dear Scott, We have received the above -noted application and I have determined that it may be reviewed as a county- wide Certificate of Appropriateness. However, revisions are required to make the proposal consistent with the design criteria that apply to the county -wide Certificate. 1. Pole light locations are not entirely clear. Revise the lighting plan to make the pole lights legible, distinguishing new from existing and relocated fixtures. 2. Relocated fixtures must meet all ordinance requirements. Provide information in the plan sufficient to confirm this. Clarify on the lighting plan which fixtures are the relocated fixtures. 3. Provide in the plan cut sheets for each of the proposed fixtures. 4. Provide a luminaire schedule. Indicate lamp type, wattage, fixture color, etc. Entrance Corridor Guidelines require a consistent lamp type and either dark brown, bronze or black for fixture /pole colors. 5. Ensure that fixtures with lamps that emit 3,000 lumens or more are full cutoff fixtures. 6. Key the cut sheets to the luminaire schedule and lighting plan. 7. Indicate on the plan the maximum light pole height, including bases, if proposed. Indicate on the plan if bases are proposed. Ensure that maximum light pole height does not exceed 20'. 8. Spillover appears to exceed .5 footcandles along Grand Forks Blvd. and at the Grand Forks /Airport Road intersection. Include the following note on the plan: "Each outdoor luminaire equipped with a lamp that emits 3,000 or more initial lumens shall be a full cutoff luminaire and shall be arranged or shielded to reflect light away from adjoining residential districts and away from adjacent roads. The spillover of lighting from luminaires onto public roads and property in residential or rural areas zoning districts shall not exceed one half footcandle." Revise the plan to ensure conformity with this note. 9. Ensure that photometrics are calculated using a maintenance factor of 1.0. Indicate this on the lighting plan. 10. A note on the lighting plan states, "Refer to civil drawings for exact light pole locations." Revise the civil drawings to make the light pole locations legible. Ensure that light pole locations are coordinated with landscaping and utilities. Please also note that your lighting /photometric plans will need to accompany your request for an electrical permit for site electrical work/light poles. Within 15 days of the date of this letter, please send me a letter (by email is acceptable) indicating whether you will or will not proceed with these revisions. If you choose not to proceed with these revisions, staff will be unable to approve your application. If you choose to proceed with the revisions, please forward me one set of revised drawings together with a memo summarizing the revisions you've made. Your decision to make the revisions will suspend the 60 -day review period associated with your original submittal. However, I expect to complete the review of your revised proposal within 2 weeks of your re- submittal. If you have any questions about this action, please contact me as soon as possible. I look forward to receiving your revisions and completing this review with an approval letter. Sincerely, Margaret Maliszewski Principal Planner cc: ARB- 2013 -137 COUNTY OF ALBEMARLE Department of Community Development REVISED APPLICATION SUBMITTAL This form must be returned with your revisions to ensure proper tracking and distribution. County staff has indicated below what they think will be required as a resubmission of revisions. If you need to submit additional information please explain on this form for the benefit of the intake staff. All plans must be collated and folded to fit into legal size files, in order to be accepted for submittal. TO: DATE: PROJECT NAME: ARB- 2013 -137: Microaire Amendment Submittal Type Requiring Revisions O indicates Submittal Code County Project Number # Copies Erosion & Sediment Control Plan E &S # Copies Distribute To: Mitigation Plan (MP) 1 M. Maliszewski Waiver Request (WR) Stormwater Management Plan (SWMP) Road Plan RP Private Road Request, with private /public comparison (PRR) Private Road Request — Development Area (PRR -DA) Preliminary Site Plan PSP Final Site Plan or amendment FSP Final Plat (FP) Preliminary Plat (PP) Easement Plat (EP) Boundary Adjustment Plat (BAP) Rezoning Plan (REZ) Special Use Permit Concept Plan (SP -CP) Reduced Concept Plan (R -CP) Proffers (P) Bond Estimate Request (BER) Draft Groundwater Management Plan (D -GWMP) Final Groundwater Management Plan (F -GWMP) Aquifer Testing Work Plan (ATWP) Groundwater Assessment Report (GWAR) Architectural Review Board (ARB) ARB- 2013 -137 1 Other: Please explain (For staff use only) Submittal Code # Copies Distribute To: Submittal Code # Copies Distribute To: ARB 1 M. Maliszewski