Loading...
HomeMy WebLinkAboutWPO201200076 Review Comments Bond Estimate 2013-10-29Project Name: Charlottesville - Albemarle Airport, Extend Runway 21, Phase 4 WPO file number: WP0201200076 Erosion and Sediment Control Bond Estimate Item Item Number stablization (PS, TS) pipe diameter silt fence (SF) 3 ft safety fence (SAF) 2 ft diversion (DD, FD, RWD) cut at high side temporary slope drain (TSD) pipe length 1 temporary sediment trap (ST or CIP) 25 ft 2.5 ft height of dam at toe 15 ft height of dam at face (cut vol) length of dam loft top width 155.8 (camp. fill vol) (spillway stone tons) length of spillway 0 ft width of spillway sift fence inlet protection (IP) 0 ft stone inlet protection flo) 0 ft outlet protection (OP) length channel (SCC, matted) length check dam depth in channel construction entrance (CE) (tons) wash rack 1 paved construction entrance 2 rip -rap, placed depth width survey and layout (price per 0.1 mi.) acres mobilization stream crossing (computed independently) 0 ft pipe diameter 0 in 3 ft cut at dam 2 ft 6 ft cut at high side 6 ft 30 ft length of cut 25 ft 2.5 ft width of cut 15 ft 117.5 cy (cut vol) 114.8 cy loft (cy set) 155.8 7 ft (spillway stone tons) 10.5 0 ft width 0 ft 0 ft width 0 ft 3 ft channel width loft 0 ft length 1.0 ft 0.0 (tons) 0 1 traps and basins 2 No. Unit Unit Cost Cos $0.00 (installed) $1,200.00 12.0 acres $5,000.00 $60,000.00 900.0 ft $5.00 $4,500.00 0.0 ft $5.00 $0.00 350 ft $13.00 $4,550.00 $0.00 $0.00 $13.00 $50.00 $2,550.03 0 $100.00 $0.00 6 $200.00 $1,200.00 0 $0.00 $0.00 $0.00 10 $675.00 $6,750.00 0 $2,000.00 $0.00 1 $2,000.00 $2,000.00 1 $3,500.00 $3,500.00 t $1,500.00 $500.00 cost sum $87,050.03 prol mgmt $13,057.50 contingency $10,010.75 Total $110,120 Method for volumE (tenth) x (total widt assume face at 2: total width = 3x(tof average height = ( 10/29/2013