HomeMy WebLinkAboutSUB201000113 Review Comments Bond Inspection 2013-11-22AL jE
COUNTY OF ALBEMARLE
U Department of Community Development
401 McIntire Road
�rRCiNI� Charlottesville, Virginia 22902
Subdivision Bond Inspection — Private Road
Project: Avemore Phase IV
Number: _SUB2010 -00113 Road: _Avemore Pond Road
Date: _11/22/2013 BIR date: 10/25/2013
Current Bond Amount: _$101,620_ Original Amount: _$189,610
Reviewer: Michael Koslow Phone: 434 - 296 -5832 ext 3297
Your bond inspection request has been processed. This list contains an update on the items
received and approved.
Received
Approved
Y
N
Y
N
N/A
x
❑
1. Completed inspection request and fee
x
❑
x
❑
2. As -built plan, updated to current date, per As -built policy
❑
x
❑
x
❑
3. Copies of recorded plats for right -of -way, easements
❑
x
❑
x
❑
4. Letter from P.E. certifying improvements are built to plan
❑
x
❑
❑
x
5. Current certification form completed by owner /developer
❑
❑
❑
x
❑
6. CBR test reports for each road
x
❑
❑
x
❑
7. Stone depth and material inspection reports (or core tests)
x
❑
❑
x
❑
8. Pavement depth and material inspection reports (or core tests)
x
❑
❑
x
❑
9. Compaction test reports for fill areas under road
x
❑
❑
❑
x
10. Pipe trench inspection reports
❑
❑
x
X
❑
11. Pipe interior inspections reports and video
x
❑
❑
❑
x
12. Concrete test reports for struct. concrete, curbing, aprons, etc.
❑
❑
x
❑
x
13. Structural inspection reports for any bridges or box culverts
❑
❑
x
Updated bond amount based on completed work: _$81,520
(Public road bonds cannot be reduced without VDOT paperwork.)
Review notes (see above numbering):
2a. For pipe run between proposed structures D3 and D2, please provide computations verifying
adequate capacity and certifying the self - cleaning velocity of 3 fps for pipe built with 0.14% slope. Note
that this pipe cannot run under pressure since it has open joints.
2b. Please label the as -built pavement thicknesses and base on as -built plans. Include pavement types
and depths (including aggregate base).
2c. Once recorded, please update the as -built plans with the deed book and page number for all
applicable access easements for Avemore Pond Road. JT Newberry will coordinate the review of the
requested easement plat application.
2d. Please label all proposed roads including Avemore Pond Road on the as -built plans in plan view and
in typical section.
C:\ Users \mkoslow\ Documents \CurrentReviews \SUB201000113 Avemore Phase
IV \CDD EN2 MAK BI Avemore Phase IV SUB201000113.doc
4a. A revised certification letter will be required at bond inspection request resubmittal.
I la. Video for each run of installed drainage pipes indicates the 15" and 18" diameter pipes are 12 ".
Please clarify in writing the installed depth relative to the video.
11 b. Review of pipe interior video indicates each of the seven installed pipe runs is exhibiting leaking
joints. Please propose a remediation or replacement strategy. After this is approved, please provide an
updated video indicating functioning runs of drainage pipes.
Attachments:
1. Summary of Comments re: Drainage System videos
2. Reduced Subdivision -road bond estimate dated 11/22/2013
C:\ Users \mkoslow\ Documents \CurrentReviews \SUB201000113 Avemore Phase
IV \CDD EN2 MAK BI Avemore Phase IV SUB201000113.doc
a
. . . . . . . . . .. .
. . . . . . . . . . . . . . .. . . . . . . . . . . .
i
Nve /wo) PIS• iv --
Roc s_ _
at ,�
L(-p- VrY.�.m,.o:,..{..v�.�o - c•V- VV --a VLa � .gal
-
P
��� �,, �� •ll Ut�Q�o �c�tc<<��a. (Z`` �ucti,Lt�� �� �
i
I.
�� �k'• l3,_�"1. �' t v� � _ flues � a � � � EGC �e�v� - -- I,
1 j. (1
lo
i
svV (h �c� s ��1(
1 Ito P�
�\s 1s"
,ba
11
P4 P-
4w
� e ��►v� t�v .. kiwvew " cc ��� lNc4e
OL����5p
1 �I
���i�� b�.�, •ice � ���'
i
N 1,37 J.L.
6
�
(MT i,,1 J b,
_
000 (3
41
.. .. ......... . ..
-app r-
...........
Avemore Subdivision Phase 4
Road and Infrastructure Construction Bond Estimate (roads, site work, storm sewer)
Plan # SUB201000113
Item
No. Unit
Unit Cost
Cost
installed
% compete
cost remaining
Avemore Pond Road
station
road length 780.0 ft
aggregate base
6.0 in d
780.0 ft L
20.0 ft W
546.0 ton
$35.00
$19,110.00
90%
$1,911.00
blotted or prime &double seal
780.0 ft L
0.0 ft W
0.0 sy
$10.00
$0.00
0%
$0.00
asphalt base
2.0 in d
780.0 ft L
20.0 ft W
191.1 tons
$100.00
$19,110.00
90%
$1,911.00
asphalt surface
1.5 in d
780.0 ft L
20.0 ft W
143.3 tons
$120.00
$17,199.00
0%
$17,199.00
curb CG -2
0.0 ft
$13.00
$0.00
0%
$0.00
curb CG -6
1000.0 ft
$15.00
$15,000.00
100%
$0.00
sidewalk, concrete (6)
150.0 ft
$17.00
$2,550.00
100%
$0.00
ramp CG -12
0 ft
$350.00
$0.00
0%
$0.00
street name sign
0 each
$200.00
$0.00
0%
$0.00
traffic control sign
3 each
$200.00
$600.00
100%
$0.00
Street Landscape
0 Each
0 each
$150.00
$0.00
0%
$0.00
guardrail
0 ES @
0
0.0 ft
$17.00
$0.00
0%
$0.00
drop inlet or grate
7 each
$3,500.00
$24,500.00
50%
$12,250.00
standard manhole frame top (not inlet)
2 each
$500.00
$1,000.00
50%
$500.00
manhole structure (per ft. rise)
34 ft
$450.00
$15,300.00
50%
$7,650.00
pipe, rcp, cmp (15 to 48 ")
15.0 in d
0 ES -1,2
0 EC -1
377.0 ft
$35.00
$13,195.00
50%
$6,597.50
pipe, rcp, cmp (15 to 48 ")
24.0 in d
0 ES -1,2
0 EC -1
0.0 ft
$50.00
$0.00
0%
$0.00
pipe, rcp, cmp (15 to 48 ")
18.0 in d
0 ES -1,2
0 EC -1
243.0 ft
$40.00
$9,720.00
50%
$4,860.00
pipe, rcp, cmp (15 to 48 ")
18.0 in d
0 ES -1,2
0 EC -1
0.0 ft
$40.00
$0.00
0%
$0.00
rip -rap, placed
0.0 ft d
0.0 ft L
0.0 ft W
0.0 ton
$60.00
$0.00
0%
$0.00
matting, EC -2 or 3
0.0 ft L
4.0 ft W
0.0 sy
$2.00
$0.00
0%
$0.00
clear and grub (for wooded sites)
0.0 ft L
30.0 ft W
0.0 acre
$24,000.00
$0.00
0%
$0.00
cut grading
0.0 cy
$4.00
$0.00
0%
$0.00
fill grading
0.0 cy
$9.00
$0.00
0%
$0.00
as -built drawings (1 k + price per 0.1 mi.)
780.0 ft L 0.14773
mi.
2 Isum
$2,000.00
$5,000.00
0%
$5,000.00
survey and layout (price per 0.1 mi.)
780.0 ft L 0.14773
mi.
2 Isum
$2,000.00
$5,000.00
0%
$5,000.00
mobilization
0Isum
$500.00
$0.00
0%
$0.00
materials testing
780.0 ft L
1.56 inc of 500'
3 each
$200.00
$520.00
100%
$0.00
compaction testing
780.0 ft L
1.56 inc of 500'
3 each
$200.00
$520.00
0%
$520.00
CBR tests (1 every 0.1 mi. per road)
780.0 ft L
1.56 inc of 500'
3 each
$200.00
$520.00
100%
$0.00
stone depth inspections
780.0 ft L
1.56 inc of 500'
3 each
$200.00
$520.00
0%
$520.00
pavement inspections
780.0 ft L
1.56 inc of 500'
3 each
$200.00
$520.00
0%
$520.00
pipe and drainage video inspections
0 ft
$1.00
$0.00
0%
$0.00
cost sum
$149,884.00
$64,438.50
proj mgmt
$22,482.60
$9,665.78
contingency
$17,236.66
$7,410.43
Total
$189,610
$81,520