HomeMy WebLinkAboutSUB201000113 Review Comments Bond Inspection 2013-11-22AL jE COUNTY OF ALBEMARLE U Department of Community Development 401 McIntire Road �rRCiNI� Charlottesville, Virginia 22902 Subdivision Bond Inspection — Private Road Project: Avemore Phase IV Number: _SUB2010 -00113 Road: _Avemore Pond Road Date: _11/22/2013 BIR date: 10/25/2013 Current Bond Amount: _$101,620_ Original Amount: _$189,610 Reviewer: Michael Koslow Phone: 434 - 296 -5832 ext 3297 Your bond inspection request has been processed. This list contains an update on the items received and approved. Received Approved Y N Y N N/A x ❑ 1. Completed inspection request and fee x ❑ x ❑ 2. As -built plan, updated to current date, per As -built policy ❑ x ❑ x ❑ 3. Copies of recorded plats for right -of -way, easements ❑ x ❑ x ❑ 4. Letter from P.E. certifying improvements are built to plan ❑ x ❑ ❑ x 5. Current certification form completed by owner /developer ❑ ❑ ❑ x ❑ 6. CBR test reports for each road x ❑ ❑ x ❑ 7. Stone depth and material inspection reports (or core tests) x ❑ ❑ x ❑ 8. Pavement depth and material inspection reports (or core tests) x ❑ ❑ x ❑ 9. Compaction test reports for fill areas under road x ❑ ❑ ❑ x 10. Pipe trench inspection reports ❑ ❑ x X ❑ 11. Pipe interior inspections reports and video x ❑ ❑ ❑ x 12. Concrete test reports for struct. concrete, curbing, aprons, etc. ❑ ❑ x ❑ x 13. Structural inspection reports for any bridges or box culverts ❑ ❑ x Updated bond amount based on completed work: _$81,520 (Public road bonds cannot be reduced without VDOT paperwork.) Review notes (see above numbering): 2a. For pipe run between proposed structures D3 and D2, please provide computations verifying adequate capacity and certifying the self - cleaning velocity of 3 fps for pipe built with 0.14% slope. Note that this pipe cannot run under pressure since it has open joints. 2b. Please label the as -built pavement thicknesses and base on as -built plans. Include pavement types and depths (including aggregate base). 2c. Once recorded, please update the as -built plans with the deed book and page number for all applicable access easements for Avemore Pond Road. JT Newberry will coordinate the review of the requested easement plat application. 2d. Please label all proposed roads including Avemore Pond Road on the as -built plans in plan view and in typical section. C:\ Users \mkoslow\ Documents \CurrentReviews \SUB201000113 Avemore Phase IV \CDD EN2 MAK BI Avemore Phase IV SUB201000113.doc 4a. A revised certification letter will be required at bond inspection request resubmittal. I la. Video for each run of installed drainage pipes indicates the 15" and 18" diameter pipes are 12 ". Please clarify in writing the installed depth relative to the video. 11 b. Review of pipe interior video indicates each of the seven installed pipe runs is exhibiting leaking joints. Please propose a remediation or replacement strategy. After this is approved, please provide an updated video indicating functioning runs of drainage pipes. Attachments: 1. Summary of Comments re: Drainage System videos 2. Reduced Subdivision -road bond estimate dated 11/22/2013 C:\ Users \mkoslow\ Documents \CurrentReviews \SUB201000113 Avemore Phase IV \CDD EN2 MAK BI Avemore Phase IV SUB201000113.doc a . . . . . . . . . .. . . . . . . . . . . . . . . . .. . . . . . . . . . . . i Nve /wo) PIS• iv -- Roc s_ _ at ,� L(-p- VrY.�.m,.o:,..{..v�.�o - c•V- VV --a VLa � .gal - P ��� �,, �� •ll Ut�Q�o �c�tc<<��a. (Z`` �ucti,Lt�� �� � i I. �� �k'• l3,_�"1. �' t v� � _ flues � a � � � EGC �e�v� - -- I, 1 j. (1 lo i svV (h �c� s ��1( 1 Ito P� �\s 1s" ,ba 11 P4 P- 4w � e ��►v� t�v .. kiwvew " cc ��� lNc4e OL����5p 1 �I ���i�� b�.�, •ice � ���' i N 1,37 J.L. 6 � (MT i,,1 J b, _ 000 (3 41 .. .. ......... . .. -app r- ........... Avemore Subdivision Phase 4 Road and Infrastructure Construction Bond Estimate (roads, site work, storm sewer) Plan # SUB201000113 Item No. Unit Unit Cost Cost installed % compete cost remaining Avemore Pond Road station road length 780.0 ft aggregate base 6.0 in d 780.0 ft L 20.0 ft W 546.0 ton $35.00 $19,110.00 90% $1,911.00 blotted or prime &double seal 780.0 ft L 0.0 ft W 0.0 sy $10.00 $0.00 0% $0.00 asphalt base 2.0 in d 780.0 ft L 20.0 ft W 191.1 tons $100.00 $19,110.00 90% $1,911.00 asphalt surface 1.5 in d 780.0 ft L 20.0 ft W 143.3 tons $120.00 $17,199.00 0% $17,199.00 curb CG -2 0.0 ft $13.00 $0.00 0% $0.00 curb CG -6 1000.0 ft $15.00 $15,000.00 100% $0.00 sidewalk, concrete (6) 150.0 ft $17.00 $2,550.00 100% $0.00 ramp CG -12 0 ft $350.00 $0.00 0% $0.00 street name sign 0 each $200.00 $0.00 0% $0.00 traffic control sign 3 each $200.00 $600.00 100% $0.00 Street Landscape 0 Each 0 each $150.00 $0.00 0% $0.00 guardrail 0 ES @ 0 0.0 ft $17.00 $0.00 0% $0.00 drop inlet or grate 7 each $3,500.00 $24,500.00 50% $12,250.00 standard manhole frame top (not inlet) 2 each $500.00 $1,000.00 50% $500.00 manhole structure (per ft. rise) 34 ft $450.00 $15,300.00 50% $7,650.00 pipe, rcp, cmp (15 to 48 ") 15.0 in d 0 ES -1,2 0 EC -1 377.0 ft $35.00 $13,195.00 50% $6,597.50 pipe, rcp, cmp (15 to 48 ") 24.0 in d 0 ES -1,2 0 EC -1 0.0 ft $50.00 $0.00 0% $0.00 pipe, rcp, cmp (15 to 48 ") 18.0 in d 0 ES -1,2 0 EC -1 243.0 ft $40.00 $9,720.00 50% $4,860.00 pipe, rcp, cmp (15 to 48 ") 18.0 in d 0 ES -1,2 0 EC -1 0.0 ft $40.00 $0.00 0% $0.00 rip -rap, placed 0.0 ft d 0.0 ft L 0.0 ft W 0.0 ton $60.00 $0.00 0% $0.00 matting, EC -2 or 3 0.0 ft L 4.0 ft W 0.0 sy $2.00 $0.00 0% $0.00 clear and grub (for wooded sites) 0.0 ft L 30.0 ft W 0.0 acre $24,000.00 $0.00 0% $0.00 cut grading 0.0 cy $4.00 $0.00 0% $0.00 fill grading 0.0 cy $9.00 $0.00 0% $0.00 as -built drawings (1 k + price per 0.1 mi.) 780.0 ft L 0.14773 mi. 2 Isum $2,000.00 $5,000.00 0% $5,000.00 survey and layout (price per 0.1 mi.) 780.0 ft L 0.14773 mi. 2 Isum $2,000.00 $5,000.00 0% $5,000.00 mobilization 0Isum $500.00 $0.00 0% $0.00 materials testing 780.0 ft L 1.56 inc of 500' 3 each $200.00 $520.00 100% $0.00 compaction testing 780.0 ft L 1.56 inc of 500' 3 each $200.00 $520.00 0% $520.00 CBR tests (1 every 0.1 mi. per road) 780.0 ft L 1.56 inc of 500' 3 each $200.00 $520.00 100% $0.00 stone depth inspections 780.0 ft L 1.56 inc of 500' 3 each $200.00 $520.00 0% $520.00 pavement inspections 780.0 ft L 1.56 inc of 500' 3 each $200.00 $520.00 0% $520.00 pipe and drainage video inspections 0 ft $1.00 $0.00 0% $0.00 cost sum $149,884.00 $64,438.50 proj mgmt $22,482.60 $9,665.78 contingency $17,236.66 $7,410.43 Total $189,610 $81,520 C:\ Users \mkoslow\ Documents \Cu rrentReviews \SUB201000113 Avemore Phase IV \2013 -11 -22 -road bond estimate R1 Avemore Phase IV SUB201000113 11/22/2013