HomeMy WebLinkAboutZMA201300012 Review Comments Zoning Map Amendment 2013-11-13Phone 434-296-5832
r
�IRGIS
County of Albemarle
Department of Community Development
401 McIntire Road,
Charlottesville, VA, 22902
Memorandum
Fax 434-972-4126
To:
Megan Yaniglos
From:
Michelle Roberge, Engineering Department
Division:
Engineering
Date:
November 13, 2013
Subject:
ZMA 2013-00012 Rivanna Village
I have reviewed the concept plan for the application noted above and offer the following comments for the
applicant. The comments are those that have been identified at this time. Additional comments may be added
or eliminated based on further review.
1) Please clarify whether roads are public or private.
[Revision 1] Comment addressed.
2) Per VDOT standards, please note that a minimum horizontal curve of 200' is required. I recommend
providing an outer radius to avoid the sharp 90 degree turns on the unnamed alley and Terrapin Circle.
There are 90 degree turns on both ends of Park St. as well. Please clarify since it appears the roads are
not shown correctly to reflect the T intersection.
[Revision 1] Comment addressed.
3) In (2) locations the access from the frontage road is not clear. Please clarify for the corner lot on Main St
and Sweetgum Lane and the lot on Terrapin Circle near the sharp bend.
[Revision 1] Comment addressed.
4) Per Section 14-409(B), "All public streets within a subdivision shall be extended and constructed to the
abutting property lines to provide vehicular and pedestrian interconnections to future development..." I
recommend showing this on plans.
[Revision 1] Comment not addressed for Park St and Terrapin Circle. Extend road to property
line. This can be addressed at final site plan phase.
5) It appears there will be disturbance within the 100' stream buffer. Please show the 100' stream buffer on
plans and provide a conceptual plan for the type of mitigation. Please see the attached sheet. Full build-
out shows some blocks have minimal space for mitigation. Reforestation may not be an adequate
solution. A combination of stream restoration and reforestation may be necessary to satisfy mitigation
requirements.
[Revision 1] Comment not addressed. The correct buffer is not shown. See the attached sheet.
The lighter orange is additional buffer that needs to be shown on plan. Also, the mitigation plan
will need to be provided and approved prior to the site plan approval.
6) It is not clear if this subdivision is a phased development. Please note that all roads will need to be
bonded prior to a grading permit if project is not phased. If it is a phased development, I recommend
providing a plan which shows the limits of each phase.
[Revision 1] Comment not addressed. The phasing plan needs to coordinate grading, E&S, SWM,
construction of road, utilities, construction of homes and stockpile locations within each phase.
See my attached recommended phasing plan.
7) The concept for placing stormwater management facilities within each block is favorable due to the
rolling topography and several streams on site. However, there are several areas that are left untreated.
I recommend placing facilities where more runoff can be captured and treated instead of narrow spaces
behind lots, where it will be very difficult to access and maintain. Also, the proposed wet ponds and
wetlands on blocks D and G will not work since it requires, at a minimum, 10 acres of watershed
drainage area. Please see the attached mark up.
[Revision 1] Comment not addressed. There is an improvement in showing BMPs at low spots
and near road for maintenance access. However, there are still areas left untreated. See the
attached sheet. Show there is adequate space for maintenance roads to BMPs noted or provide
an alternate BMP location.
8) 1 recommend a COE permit to be obtained prior to the approval of this ZMA application.
[Revision 1] Comment acknowledged. The applicant expects COE permit to be obtained before
approval of ZMA application.
9) One stormwater management facility is shown on County property, where the fire station is located. I
recommend all proposed stormwater management facilities to be on site.
[Revision 1] Comment partially addressed. The fire station is now included in project, however
maintenance of SWM is still in question. Who will maintain SWM facility?
10) 1 do not see the need to separate out wet pond 2 into (3) basins. I recommend only showing one basin.
[Revision 1] Comment addressed. One is a forebay to act as a sedimentation pond before it is
routed to SWM pond.
11) Please label each stormwater management facility with its own unique number and type for reference.
Wet swale 1 and wetland 1 were used multiple of times. It will be easier to locate on plans without
having to figure out blocks first, then the type of facility.
[Revision 1] Comment addressed.
12) For drainage area E2, please provide other measures to treat runoff. Downspout disconnects and tree
boxes are not adequate.
[Revision 1] Comment not addressed. This area is Phase 6 in my recommendation sheet. The
alternative BMP is behind homes and is difficult to access for maintenance.
13) There are impacts to traffic with this development. Most of the recommendations from the traffic study
have been addressed except for two items. I recommend adding an eastbound right turn lane with 200'
storage lane and 200' taper on the second entrance, furthest east, off of Richmond Road. I also
recommend the northbound right taper at the intersection of Glenmore Way and first entrance.
[Revision 1] Comment not addressed.
14) The traffic study does not assume a phased development. I recommend that all entrances shown on
the traffic study are constructed and fully operational at the initial phase of the project.
[Revision 1] Comment addressed. The first entrance will be constructed in Phase 1. The other
entrance off of Rte 250 will be constructed in Phase II.
Please contact Michelle Roberge in the Engineering Dept at mroberge(a)albemarle.org or 434-296-5832 ext.
3458 for further information.
Map is for Display Purposes Only • Aerial Imagery from the Commonwealth of Virginia and Other Sources March 5, 2013
79D-14
�80-46B
80-46E 79A1--OC-1379A1--0C-11
r� <> 79A1,--OB-25
v
Legend
STFq��
i%
t'
79D-15 6 80-46
(Note: Some items on map may not appear in legend)
°e oEH E
93A1-3
'3701
�
80-46A
��Qd
0i-ERESCUEs.AIII,o
aaEc-11 N"o°a�s"
a
79A1--OB-2
37 37
East Rivanna
Fire Station
< / \79A1 -O
-:
80-51 _ 4:0P
93A1-2
3760 \ `scP
\`\AT
79-25A
'80-50 37`21
80-55A 3738 80-52
3732
80-556 �MQ 80-53
i�
—�j 134
ri
93A1-4
J
80-54
79-25B
TM: 79
-
TM: 80
1192
80-55C
80-55
z
3700
'0
3699
= 79-25C
cn
j 12 0
79-33
_
ll((3A1-
3686
O
11 1
79-25
80-49A
n o
1246 9-26 35`;15
2
m �
80-56B
3595
80-47
`\AFRgFL��
1
/ 79-29
80-48
\
94-1
80-49
341 ft
ti
3A1 -B 93A4
-_._ 0
2403 �'4:•
-H3 "'93A4 --S5-43\
23971
�ti
94-4
of A eE,
�2 0l =P GIS -Web
�� Geographic Data Services
? k
3A1 --T2-20 TM' 93
\\
9.3A41=%4=8 93A4 =S5- 2
www.alt>emarle.org
i RCIN\P (434)296-5832
TM: 94 g4-3
Map is for Display Purposes Only • Aerial Imagery from the Commonwealth of Virginia and Other Sources March 5, 2013
FA
- Ar
REM❑VE ❑R PR❑VIDE
MAINTENANCE ACCESS
r1
�
1
l
REM❑VE ❑R PR❑VIDE
MAINTENANCE ACCESS
r1
�
1
ISI
µ"j'y 1' �-_.—f lit Z"
-"N
--Y-�-`` -'4. �i�Zrf f 'S 1�_�,� � J��� rf �: 4�_� ___ ,I4• �'��=i 1 ( 11� ++il(,!
•, _
-"
�,+ '• ;
si
5
+ r=� ,'• 7f1 PE raEeraVBE1•— - _ •�,1 •,: _ }4 �T �4+;,.I, ,v ,1'•
-r ; Yu'R,•LT€ � - _ _ - _ r—• 1`YlsFJ[Vli F.']L[y'1'LYC .. _ _
I 'I __ + nvrr.Ri[iTTgvf 33T15A]9 - ' � •�'.•�
rr ,
u es roP tYn <m
NOTE:
FOR ADDITIONAL STORNfWATER MANAGEMENT INFORNLALTION
PRELIMINARY STORMR ITER CONCEPT PLANS PREPARED BY
WILLLLZSSDURG MNNIRONTMENTAL GROUP, D;C, SL'IIMITTED
SEPARATELY.
—` � 1` - `! - * '�.�- -- ParrNusxexr:Fnnu-1:,: r:I� 1•.1 (1� r' ~-Yti'
v'. � FY"1 k'dA[1Z•TE31'�'IYeF:LI[ A I,
4 l' -1.� 1. + � •'r E1,LI1`.'EMP.
l\; •.� - :�: stir •I1"!_-r�rm�—�n'. AL i ,� ,£ -f.'ti-.Hlf.,'�.. AVN
� -- • '� 10£ PRILSF.RVPTi � r'
•Q�1
DENOTES AREA OF POTENTIAL STREAM BLIT•ER
FNHANCFN FN'I-IS•1'R FAM RF.L I'OIZA-I'I LIN
MITIGAC11ON TO OFFSET IW S'I'RE,"t 13t1FFER
DISTURBkNU S.
i.,'y }n •...b R i /fir'- •.,4. _ � � I nr � f� - Jf � \ " - z
PRWVRVHHXBgj. C' _ r �/ .%
H
TG ➢2 W6T['AP£P* M1 "� R6�15WAli� • ,: .� �.��l.r- }+;.
�dalar murrwrwvs p•r
MAE"
H%JE'I
PIIISISEHVL' "L�L:
AND
11V1'I$.�I'11'L,1."I'311[f-Ah1
.YDCiilLN
ue xui epi ti kx
: 1 •^ �. ' , - , "'�S l _ AND C'EiAXNEL �. ,• �-� - .
f. •
HEPR
-- UERYED - F'� - ~= 1 —•>ti r
.. ,�
.
pbl'r Y[:w'1•_:I-
- I I � �,� y � = n1 nRr�x,�brsnnHrl -- -.- -- - -- - .' � � _ � r�•;y�� , � ,�I r � rr -� a-�
moi/ r REM❑V.. ❑I�' Pk�pVT J—.731!''Yv.:s's! -� p-h`I V R. �r f .-�
MAINTENA�E ACCESS — f,'r:•. E ❑ PRUVIDE — -
- MAIN I ENANC'F ACG,ESS'
-�_ ^�_ -��� �fr,yJr{+ k •.�� ( ,`r r<' � - .+ ,� - � —!_ a.�.� I!v-�-'iii Arrwrnr � y .. i I I,+ �/'�I / � r �!'
-1 f�� i-Il�f - iI� � ''4 �' -- -�--- h�-,� - - -� _ `' I� }��{y.'. `••- �.�_ �4..r�, i�+�+
_r fJ-'? Ir+ 11 ! + �• r ]� ? --•��rt'1�verr � - 'r.,l, ' •, �� �' �"• /�//� i 1 i ++. II �`, ��'� _� - - - - - k , •�' �
V�—
=ti 1
' - - ,�� ' 1' ' + � , � I - - '! r � ` - -- - -- - r �` �fCf 4 T `'Si ` l' � y'�.ya~ • •—[M`'''$�71 1'li k7ilY787RLA61 I r ��y` f �) I + i 1��� ����--�` �;% ' �'� �% f , _..
_ '' ,!� � � - 1 ' � _ _ _ i' I - -r •�T ,r �. �- I �Y �� •I AMA[�NkLI � - ��/ I I � �i(1 �� _ .f f��r � �; 1
-- ''Jr�su,•.c.v,. r ' — •tiY 1L� � \,•.ti;\;•'•'' ','1 � ���`���r�Y L 1 - I' � ,ti i y { 1 r r
\,
CONCEPTS, P.C.
MAS=. &srrEPLAHL> rNG
EY.'IrrLEML%TPP.0 M9INC
L�NDSCAPKARCHi =L -RE
3fMA0C[ Q�L,�ABY HOAR
Yx. •Hlai#A nq
4"Ou of r.
r�
%1" L K&er
r c�w�on9
•rre s%
SC:ALFE 1"_1(81'
BUB•NIIi-EL7: 7.15-13
DRAWti 13Y: SLEK
REVISION&
L l0. O SiAFFCr1H qB
SHEET
ISI
x
z
G
W
O
4"Ou of r.
r�
%1" L K&er
r c�w�on9
•rre s%
SC:ALFE 1"_1(81'
BUB•NIIi-EL7: 7.15-13
DRAWti 13Y: SLEK
REVISION&
L l0. O SiAFFCr1H qB
SHEET