Loading...
HomeMy WebLinkAboutWPO201300070 Review Comments Erosion Control Plan 2013-12-03�RGICn4' COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road Charlottesville, Virginia 22902 WPO Plan Review Project: Gabriele Rausse Winery— Tasting Room Number: WP0201300070 Date Received: 20 Nov 2013 Date of Review: 3 Dec 2013 Reviewer: Michelle Roberge This is an abbreviated review comment notice. County engineering staff is available every Thursday afternoon to discuss details of review. To schedule, please call your reviewer for an appointment. Erosion & Sediment Control: (Code Chapter 17, Article II) Y N Adequate X Not Adequate X State standards followed, and Design Standards Manual notes and details X Adequate limits and perimeter measures out of work areas X All stages protected adequately X1 Adequate channels - Existing grades are missing. Provide grades at entrance, south of site and drain field. Albemarle County GIS can be utilized to obtain missing topo. - Show total acreage of limit of disturbance on plan. - Provide soil stabilization blankets and matting for 2:1 slopes. -Show temporary seeding symbol (TS), permanent seeding symbol (PS), and dust control symbol (DC) on plans. - Replace check dams near bridge with two sediment traps. -Show outlet protections for pipes shown. -Show drainage areas to pipes. This will help determine pipe capacity and ditch adequacy. Also label pipe type, size and inverts. - Provide North symbol. - Provide standard notes for E &S. -Show ditch on high side of new gravel entrance to convey runoff. I recommend showing a culvert and continue ditch west of entrance. - Provide culvert inlet protection instead of check dams before inlet of each nine. Stormwater Management: (Code Chapter 17, Article III) Y N n/a Adequate Not Adequate Enough capture and treatment for on -site areas Enough detention storage for on -site areas Sealed hydrologic and hydraulic computations provided Mitigation: (Code Chapter 17, Article III) Y N Adequate X Not Adequate Buffers and disturbed areas adequately shown Adequate plantings at 2:1, or other mitigation provided -A mitigation plan will be required. Provide a mitigation plan in next submittal with E &S revisions. - Outline proposed mitigation area and label acreage. See mitigation requirements in link: httD: / /www.albemarle.orL'/unload /images /forms center /departments /c ommunity development /forms /design standards manual/Albemarle County Design Standards Manual 22Oct2012.pdf This review attempts to encompass the larger compliance questions. County staff does not assume responsibility for any calculation or plan details, and cannot cover the intricacies of every plan submitted. Each plan and calculation must have a professional seal and signature to assume these responsibilities. This plan Approved (please see attached Approval Fact Sheet) X Not Approved is