Project: Collins Medical Center
Number: WP0201300071
Date: 5 December 2013
Reviewer: Max Greene
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road
Charlottesville, Virginia 22902
WPO Plan Review
Phone: 296 -5832 ext. 3283
This is an abbreviated review comment notice. County engineering staff is available every Thursday
afternoon to discuss details of review. To schedule, please call your reviewer for an appointment.
Erosion & Sediment Control: Adequate
(Code Chapter 17, Article II) X Not Adequate
Y N
State standards followed, and Design Standards Manual notes and details
Adequate limits and perimeter measures out of work areas
All stages protected adequately
Adequate channels
*Building cannot be constructed with sediment control structure in
foundation. Recommend using CIP as perimeter control structure designed
per VESCH instead.
*Silt fence running down hill does not perform as silt fence but as
diversion.
*Tree protection fence will be installed 5 feet (as a minimum) outside of
actual drip edge of trees to be saved, or if not required by site plan then it
should be removed from E &SC plan and enforced with contractor as
separate item.
*please submit documentation for MS -19 compliance per VESCH.
*Please show the Albemarle County Paved construction entrance detail on
the E &SC plan.
*Please submit an easement/letter of intent from adjacent property owner
for off -site disturbance /work.
*Please include "detail C -9" in the E &SC plan.
*pipe in SCC -A appears to be in the flow path and will erode and expose
pipe over time. Please correct either pipe location or flow path of SCC -A.
*Additional comments /conditions may be forthcoming due to requested
changes to the E &SC plan
No approved SWM plan for this site on file. Please submit an application and
fee along with two SWM plans for review.
Stormwater Management Agreement will need to be updated with new
information after submittal of SWM plan.
Stormwater Management:
(Code Chapter 17, Article III) Adequate
g Not Adequate
Y N
Enough capture and treatment for on -site areas
Enough detention storage for on -site areas
Sealed hydrologic and hydraulic computations provided
Please submit 4 copies of the WPO plans and computations with original
signatures on seal.
Mitigation: N/A Adequate
(Code Chapter 17, Article III)
Not Adequate
Y N
m Buffers and disturbed areas adequately shown
m Adequate plantings at 2:1, or other mitigation provided
This review attempts to encompass the larger compliance questions. County staff does not assume
responsibility for any calculation or plan details, and cannot cover the intricacies of every plan submitted.
Each plan and calculation must have a professional seal and signature to assume these responsibilities.
This plan is
Approved (please see attached Approval Fact Sheet)
g Not Approved
Project Name: Collins Medical Center
WPO file number: wpo201400071
Stormwater Management Plan Bond Estimate
Item Item
Number
permanent diversion or ditch
standard manhole frame top (not role
drop inlet or grate
manhole structure (per ft. nee)
pipe, rcp. crop (15 to 48 ")
24.0 in d
aggregate base or drainage stone
3.0 in d
sanhwork for trap/basin
110.0 ftw
0 ft
height of dam at toe
0 ft
height of 611 at face
cut at face
length of dam
0 ft
top width
0 ft
(area above transition)
width of cut
(total width of tlam)
0 of
(height below transition
0 of
(area below transition)
(total witlth of cut)
(total fill volume)
0 ft
length of spillway
0 ft
width of spillway
structures for basin
0 of
0.0 cy
door height
00 cY
riser diameter
GOAL CV estimate)
barrel length
0 ft
barrel diameter
tress
shrubs
seedlings
underdmin(LF)
bloflter soil mix (Cy)
trash rack) and vortex devices
maintenance access road (LF)
ril placed depth 2 ft length
width 5.0 (tons)
survey and layout (price per 0.1 mi.) acres 1 basins
mobilization
as -built drawings (per facility)
materials testing (per facility)
compaction testing (per dam)
manufactured facilities (attach manufacturer's or contractor's price as a base)
5.0 ft
3.75
1
No. Unit Unit Cost Cost
(installed)
55 ft $13.00 $715.00
4 ea $500.00 $2,000.00
1 as $3,500.00 $3,500.00
13 ft $450.00 $5,850.00
312.0 ft $50.00 $15,600.00
19.3 ton $35.00 $673.75
$0.00
$200.00 $0
$0.00
$200.00 $0
$50.00 $0
0 as
0 ES-1,2
0 EC -1
$50.00 $0.00
10.0 ftL
110.0 ftw
0 ft
cut at high side
0 ft
0 ft
cut at face
0 ft
0 ft
length of cut
0 ft
0 ft
width of cut
0 ft
0 of
(area below transition)
0 of
0 ft
(total witlth of cut)
0 ft
0 ft
(depth below transition
0 ft
0 of
(area above transition)
0 of
0.0 cy
(total 611 volume)
00 cY
0 ft
GOAL CV estimate)
0 cy
0 ft
(spillway stone tons)
0 tons
Oft
0 in
(riser unit price)
$000
0 ft
base plate or ran
0
0 in
(barrel unit price)
$0.00
barrel collars
0
baffle length
0 ft
tress
shrubs
seedlings
underdmin(LF)
bloflter soil mix (Cy)
trash rack) and vortex devices
maintenance access road (LF)
ril placed depth 2 ft length
width 5.0 (tons)
survey and layout (price per 0.1 mi.) acres 1 basins
mobilization
as -built drawings (per facility)
materials testing (per facility)
compaction testing (per dam)
manufactured facilities (attach manufacturer's or contractor's price as a base)
5.0 ft
3.75
1
No. Unit Unit Cost Cost
(installed)
55 ft $13.00 $715.00
4 ea $500.00 $2,000.00
1 as $3,500.00 $3,500.00
13 ft $450.00 $5,850.00
312.0 ft $50.00 $15,600.00
19.3 ton $35.00 $673.75
$0.00
$200.00 $0
$0.00
$200.00 $0
$50.00 $0
0 as
$150.00 $0.00
0 as
$50.00 $0.00
0 as
$5.00 $0.00
0 ft
$5.00 $0.00
0 cY
$38.00 $0.00
0 ft
$1,500.00 $0.00
0 ft
$50.00 $0.00
$60.00 $225.00
$1,000.00
$500.00
1 as
$2,000.00 $2,000.00
0 as
$2,000.00 $0.00
0 as
$5,000.00 $0.00
$0.00
cost sum
$32,063.75
pmt mgrr4
$4,806.56
contingency
$3,687.33
Total
$40,570
11/3/2014
Project Name: Collins Medical Center
WPO file number: WP0201300071
Erosion and Sediment Control Bond Estimate
Item Item
Number
stal lization (PS, TS)
all fence (SF)
safety fence(SAF)
diversion (DD, FD, RW D)
temporary slope drain (TSD)
pipe length
earthwork for trap /basin
length
check dam
height of dam at toe
construction entrance (CE)
height of fill at face
wash rack
length of dam
paved construction entrance
lap width
rip-rap, placed
(area above transition)
10 ft
(total width of dam)
survey and layout (price par 0.1 mi.)
(height below transition)
mobilization
(area below transition)
stream crossing (computed independently)
(total fill volume)
(depth below lransilior
length of spillway
0 at
width of spillway
structures for basin
0.0 cy
(total fill volume)
riser height
6 ft
riser diameter
11 cy
barrel length
(spillway stone tons)
barrel diameter
all fence inlet protection (IP)
stone inlet protection (IP)
outlet protection (OP)
length
channel (SCC, matted)
length
check dam
depth in channel
construction entrance (CE)
cut at face
wash rack
10 ft
paved construction entrance
30 ft
rip-rap, placed
depth
10 ft
width
survey and layout (price par 0.1 mi.)
acres
mobilization
(total width of cut)
stream crossing (computed independently)
0 ft
pipe diameter
0 in
0 ft
cut at high side
2 ft
0 ft
cut at face
0 ft
10 ft
length of cut
30 ft
0 ft
width of cut
10 ft
0 sf
(area below transtion)
0 sf
0 ft
(total width of cut)
14 ft
O ft
(depth below lransilior
2 ft
0 at
(area above transition)
10 sf
0.0 cy
(total fill volume)
11.1 cy
6 ft
(TOAL CV estimate)
11 cy
0 ft
(spillway stone tons)
0 tons
Oft
0 in
(rise unit price)
$0.00
0 ft
base plate or fdo
0
0 in
(barrel unit price)
$0.00
barrel collars
0
baffle length
0 ft
15 ft
width
10 ft
55 ft
width
10 ft
1 ft
channel width
10 ft
0 it
length
0.0 ft
0.0
(tons)
0 tons
1
traps and basins
1
No. Unit
Unit Cost
Cost
(installed)
0.6 acres
$5,000.00
$2,750.00
1260.0 ft
$5.00
$6,300.00
0.0 ft
$5.00
$0.00
290 ft
$13.00
$3,770.00
$0.00
$0.00
I
cost sum
prcj mgmt
contingency
Total
$13.00 $143.00
$50.00 $0.00
$0.00
$200.00 $0
$0.00
$200.00 $0
$50.00 $0
$100.00 $0.00
$200.00 $400.00
$675.00 $675.00
$715.00
$225.00 $0.00
$2,000.00 $0.00
$2,000.00 $2,000.00
$3,500.00 $3,500.00
$60.00 $0.00
$1,000.00
$500.00
$0.00
$21,753.00
$3,262.95
$2,501.60
$27,520
11/3/2014