Loading...
HomeMy WebLinkAboutWPO201300071 Review Comments Erosion Control Plan 2013-12-05�'IRGINZP Project: Collins Medical Center Number: WP0201300071 Date: 5 December 2013 Reviewer: Max Greene COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road Charlottesville, Virginia 22902 WPO Plan Review Phone: 296 -5832 ext. 3283 This is an abbreviated review comment notice. County engineering staff is available every Thursday afternoon to discuss details of review. To schedule, please call your reviewer for an appointment. Erosion & Sediment Control: Adequate (Code Chapter 17, Article II) X Not Adequate Y N State standards followed, and Design Standards Manual notes and details Adequate limits and perimeter measures out of work areas All stages protected adequately Adequate channels *Building cannot be constructed with sediment control structure in foundation. Recommend using CIP as perimeter control structure designed per VESCH instead. *Silt fence running down hill does not perform as silt fence but as diversion. *Tree protection fence will be installed 5 feet (as a minimum) outside of actual drip edge of trees to be saved, or if not required by site plan then it should be removed from E &SC plan and enforced with contractor as separate item. *please submit documentation for MS -19 compliance per VESCH. *Please show the Albemarle County Paved construction entrance detail on the E &SC plan. *Please submit an easement/letter of intent from adjacent property owner for off -site disturbance /work. *Please include "detail C -9" in the E &SC plan. *pipe in SCC -A appears to be in the flow path and will erode and expose pipe over time. Please correct either pipe location or flow path of SCC -A. *Additional comments /conditions may be forthcoming due to requested changes to the E &SC plan No approved SWM plan for this site on file. Please submit an application and fee along with two SWM plans for review. Stormwater Management Agreement will need to be updated with new information after submittal of SWM plan. Stormwater Management: (Code Chapter 17, Article III) Adequate g Not Adequate Y N Enough capture and treatment for on -site areas Enough detention storage for on -site areas Sealed hydrologic and hydraulic computations provided Please submit 4 copies of the WPO plans and computations with original signatures on seal. Mitigation: N/A Adequate (Code Chapter 17, Article III) Not Adequate Y N m Buffers and disturbed areas adequately shown m Adequate plantings at 2:1, or other mitigation provided This review attempts to encompass the larger compliance questions. County staff does not assume responsibility for any calculation or plan details, and cannot cover the intricacies of every plan submitted. Each plan and calculation must have a professional seal and signature to assume these responsibilities. This plan is Approved (please see attached Approval Fact Sheet) g Not Approved Project Name: Collins Medical Center WPO file number: wpo201400071 Stormwater Management Plan Bond Estimate Item Item Number permanent diversion or ditch standard manhole frame top (not role drop inlet or grate manhole structure (per ft. nee) pipe, rcp. crop (15 to 48 ") 24.0 in d aggregate base or drainage stone 3.0 in d sanhwork for trap/basin 110.0 ftw 0 ft height of dam at toe 0 ft height of 611 at face cut at face length of dam 0 ft top width 0 ft (area above transition) width of cut (total width of tlam) 0 of (height below transition 0 of (area below transition) (total witlth of cut) (total fill volume) 0 ft length of spillway 0 ft width of spillway structures for basin 0 of 0.0 cy door height 00 cY riser diameter GOAL CV estimate) barrel length 0 ft barrel diameter tress shrubs seedlings underdmin(LF) bloflter soil mix (Cy) trash rack) and vortex devices maintenance access road (LF) ril placed depth 2 ft length width 5.0 (tons) survey and layout (price per 0.1 mi.) acres 1 basins mobilization as -built drawings (per facility) materials testing (per facility) compaction testing (per dam) manufactured facilities (attach manufacturer's or contractor's price as a base) 5.0 ft 3.75 1 No. Unit Unit Cost Cost (installed) 55 ft $13.00 $715.00 4 ea $500.00 $2,000.00 1 as $3,500.00 $3,500.00 13 ft $450.00 $5,850.00 312.0 ft $50.00 $15,600.00 19.3 ton $35.00 $673.75 $0.00 $200.00 $0 $0.00 $200.00 $0 $50.00 $0 0 as 0 ES-1,2 0 EC -1 $50.00 $0.00 10.0 ftL 110.0 ftw 0 ft cut at high side 0 ft 0 ft cut at face 0 ft 0 ft length of cut 0 ft 0 ft width of cut 0 ft 0 of (area below transition) 0 of 0 ft (total witlth of cut) 0 ft 0 ft (depth below transition 0 ft 0 of (area above transition) 0 of 0.0 cy (total 611 volume) 00 cY 0 ft GOAL CV estimate) 0 cy 0 ft (spillway stone tons) 0 tons Oft 0 in (riser unit price) $000 0 ft base plate or ran 0 0 in (barrel unit price) $0.00 barrel collars 0 baffle length 0 ft tress shrubs seedlings underdmin(LF) bloflter soil mix (Cy) trash rack) and vortex devices maintenance access road (LF) ril placed depth 2 ft length width 5.0 (tons) survey and layout (price per 0.1 mi.) acres 1 basins mobilization as -built drawings (per facility) materials testing (per facility) compaction testing (per dam) manufactured facilities (attach manufacturer's or contractor's price as a base) 5.0 ft 3.75 1 No. Unit Unit Cost Cost (installed) 55 ft $13.00 $715.00 4 ea $500.00 $2,000.00 1 as $3,500.00 $3,500.00 13 ft $450.00 $5,850.00 312.0 ft $50.00 $15,600.00 19.3 ton $35.00 $673.75 $0.00 $200.00 $0 $0.00 $200.00 $0 $50.00 $0 0 as $150.00 $0.00 0 as $50.00 $0.00 0 as $5.00 $0.00 0 ft $5.00 $0.00 0 cY $38.00 $0.00 0 ft $1,500.00 $0.00 0 ft $50.00 $0.00 $60.00 $225.00 $1,000.00 $500.00 1 as $2,000.00 $2,000.00 0 as $2,000.00 $0.00 0 as $5,000.00 $0.00 $0.00 cost sum $32,063.75 pmt mgrr4 $4,806.56 contingency $3,687.33 Total $40,570 11/3/2014 Project Name: Collins Medical Center WPO file number: WP0201300071 Erosion and Sediment Control Bond Estimate Item Item Number stal lization (PS, TS) all fence (SF) safety fence(SAF) diversion (DD, FD, RW D) temporary slope drain (TSD) pipe length earthwork for trap /basin length check dam height of dam at toe construction entrance (CE) height of fill at face wash rack length of dam paved construction entrance lap width rip-rap, placed (area above transition) 10 ft (total width of dam) survey and layout (price par 0.1 mi.) (height below transition) mobilization (area below transition) stream crossing (computed independently) (total fill volume) (depth below lransilior length of spillway 0 at width of spillway structures for basin 0.0 cy (total fill volume) riser height 6 ft riser diameter 11 cy barrel length (spillway stone tons) barrel diameter all fence inlet protection (IP) stone inlet protection (IP) outlet protection (OP) length channel (SCC, matted) length check dam depth in channel construction entrance (CE) cut at face wash rack 10 ft paved construction entrance 30 ft rip-rap, placed depth 10 ft width survey and layout (price par 0.1 mi.) acres mobilization (total width of cut) stream crossing (computed independently) 0 ft pipe diameter 0 in 0 ft cut at high side 2 ft 0 ft cut at face 0 ft 10 ft length of cut 30 ft 0 ft width of cut 10 ft 0 sf (area below transtion) 0 sf 0 ft (total width of cut) 14 ft O ft (depth below lransilior 2 ft 0 at (area above transition) 10 sf 0.0 cy (total fill volume) 11.1 cy 6 ft (TOAL CV estimate) 11 cy 0 ft (spillway stone tons) 0 tons Oft 0 in (rise unit price) $0.00 0 ft base plate or fdo 0 0 in (barrel unit price) $0.00 barrel collars 0 baffle length 0 ft 15 ft width 10 ft 55 ft width 10 ft 1 ft channel width 10 ft 0 it length 0.0 ft 0.0 (tons) 0 tons 1 traps and basins 1 No. Unit Unit Cost Cost (installed) 0.6 acres $5,000.00 $2,750.00 1260.0 ft $5.00 $6,300.00 0.0 ft $5.00 $0.00 290 ft $13.00 $3,770.00 $0.00 $0.00 I cost sum prcj mgmt contingency Total $13.00 $143.00 $50.00 $0.00 $0.00 $200.00 $0 $0.00 $200.00 $0 $50.00 $0 $100.00 $0.00 $200.00 $400.00 $675.00 $675.00 $715.00 $225.00 $0.00 $2,000.00 $0.00 $2,000.00 $2,000.00 $3,500.00 $3,500.00 $60.00 $0.00 $1,000.00 $500.00 $0.00 $21,753.00 $3,262.95 $2,501.60 $27,520 11/3/2014