Loading...
HomeMy WebLinkAboutWPO201300010 Review Comments Erosion Control Plan 2013-12-03�RGICn4' COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road Charlottesville, Virginia 22902 WPO Plan Review Project: Seminole Trail Fire Station Additions & Renovations Number: WP0201300010 Date Received: 03 Nov 2013 Date of Review: 3 Dec 2013 Reviewer: Michelle Roberge This is an abbreviated review comment notice. County engineering staff is available every Thursday afternoon to discuss details of review. To schedule, please call your reviewer for an appointment. Erosion & Sediment Control: (Code Chapter 17, Article II) Y N X X X Adequate g Not Adequate State standards followed, and Design Standards Manual notes and details X I Adequate limits and perimeter measures out of work areas All stages protected adequately Adequate channels -Show diversions dikes to sediment trap on plan. I recommend avoiding sharp bend to trap. -Show pipe protruding from ground on plan. -Show calcs for sediment trap. Show how much DA will be draining to sediment trap. -Show limits for stockpile area west of building. -Show TS, PS and DC symbol on plans. -This is amending the previous plan and will replace the previous plan. Please clearly show the revised E &S phasing for this project since it appears the construction sequence has been revised. Stormwater Management: (Code Chapter 17, Article III) Y N n/a Adequate Not Adequate Enough capture and treatment for on -site areas Enough detention storage for on -site areas Sealed hydrologic and hydraulic computations provided Mitigation: (Code Chapter 17, Article III) Y n/a Adequate Not Adequate Buffers and disturbed areas adequately shown Adeauate nlantinas at 2:1, or other mitivation This review attempts to encompass the larger compliance questions. County staff does not assume responsibility for any calculation or plan details, and cannot cover the intricacies of every plan submitted. Each plan and calculation must have a professional seal and signature to assume these responsibilities. This plan Approved (please see attached Approval Fact Sheet) X Not Approved is