Loading...
HomeMy WebLinkAboutSUB201300124 Review Comments Bond Inspection 2014-01-10N- Subdivision Bond Inspection COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road Charlottesville, Virginia 22902 Project: HTC Area C Timberwood Blvd Phase 2 Number: 2301 HTC Timberwood Ph II (road plan) Date: 10 Jan 2014 Reviewer: Michelle Roberge Original Bond Amount: $244,710 Phone: (434) 296 -5832 Current Bond Amount: $421,690 (recalculated bond amount) Your bond inspection request has been processed. This list contains an update on the items received and approved. Received Approved Y N Y N N/A ,r ❑ Completed inspection request and fee ❑ ❑ ❑ ❑ As -built plan, updated to current date, per As -built policy ❑ .a° ❑ 0 ❑ Copies of recorded plats for right -of -way, easements ❑ 9 ❑ ❑ ❑ VDOT approval AM -4.3, or partial completion via punchlist ❑ ❑ ❑ ❑ ❑ Letter from P.E. certifying improvements are built to plan ❑ ❑ ❑ ❑ ❑ Current certification form completed by owner /developer ❑ ❑ ❑ -e ❑ CBR test reports for each road ❑ lr ❑ ❑ ❑ Stone depth and material inspection reports (or core tests) ❑ ❑ ❑ ❑ ❑ Pavement depth and material inspection reports (or core tests) ❑ ❑ ❑ ❑ ❑ Compaction test reports for fill areas under road ❑ ❑ ❑ ❑ ❑ Pipe trench inspection reports ❑ ❑ ❑ z ❑ Pipe interior inspections reports and video ❑ W ❑ ❑ ❑ Concrete test reports for structural concrete, curbing, aprons, etc. ❑ ❑ ❑ ❑ ❑ Structural inspection reports for any bridges or box culverts ❑ ❑ ❑ Updated bond amount based on completed work: $421,690 (recalculated bond amount) Based on the new current pricing, the bond amount increased to $421,690. Unfortunately, this amount cannot be reduced since I have not received the punchlist from VDOT. Please provide the following for the next inspection request: a) Provide the punchlist from VDOT. b) The plan is not to scale and is not legible. Please refer to the As -built Road Plan policy for other information on what to show on an as- built. c) The recorded plat has been submitted, but I will compare easements with as- builts when I have a legible plan. d) The pipe inspection video needs to be on a CD for our records.