Loading...
HomeMy WebLinkAboutSDP201300064 Review Comments No Submittal Type Selected 2013-12-20pF AL �411111QM NOT /:\;3 4 � Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 December 20, 2013 Eric P. Goetz Goetz Design Group 968 Mountain Road Afton VA 22920 RE: ARB- 2013 -156: Church of our Savior Annex Dear Eric, I received a site plan with revision date of 11 -22 -13 for the above -noted application. I've reviewed the plan and it appears that several of the comments from my October 22, 2013 letter have not been addressed. The following revisions are required to make the proposal consistent with the design criteria that apply to the county -wide Certificate. 1. Please add the following notes to the site plan: a. "Each outdoor luminaire equipped with a lamp that emits 3,000 or more initial lumens shall be a full cutoff luminaire and shall be arranged or shielded to reflect light away from adjoining residential districts and away from adjacent roads. The spillover of lighting from luminaires onto public roads and property in residential or rural areas zoning districts shall not exceed one half footcandle." b. "All site plantings of trees and shrubs shall be allowed to reach, and be maintained at, mature height; the topping of trees is prohibited. Shrubs and trees shall be pruned minimally and only to support the overall health of the plant." 2. Please add the following note to the site and architectural plans: "Visibility of all mechanical equipment from the Entrance Corridor shall be eliminated." 3. The plant schedule does not correspond to the plants drawn on the plan. Please correct and coordinate. 4. The work previously proposed near /along Rio Road has been eliminated from the proposal. However, two trees located south of the "one -story frame with basement" building are still identified as to be removed. Please clarify /correct. Please provide: 1. One full set of revised drawings addressing each of these conditions. Include updated revision dates on the drawings. 2. A memo including detailed responses indicating how each condition has been satisfied. If changes other than those requested have been made, identify those changes in the memo also. Highlighting the changes in the drawing with "clouding" or by other means will facilitate review and approval. 3. The attached "Revised Application Submittal" form. This form must be returned with your revisions to ensure proper tracking and distribution. When staffs review of this information indicates that all conditions of approval have been met, a Certificate of Appropriateness may be issued. If you have any questions, please do not hesitate to contact me. Sincerely, Margaret Maliszewski Principal Planner cc: ARB- 2013 -156 COUNTY OF ALBEMARLE Department of Community Development REVISED APPLICATION SUBMITTAL This form must be returned with your revisions to ensure proper tracking and distribution. County staff has indicated below what they think will be required as a resubmission of revisions. If you need to submit additional information please explain on this form for the benefit of the intake staff. All plans must be collated and folded to fit into legal size files, in order to be accepted for submittal. TO: PROJECT NAME: ARB- 2013 -156: Church of Our Saviour Annex DATE: Submittal Type Requiring Revisions O indicates Submittal Code County Project Number # Copies Erosion & Sediment Control Plan E &S # Copies Distribute To: Mitigation Plan (MP) I M. Maliszewski Waiver Request (WR) Stormwater Management Plan (SWMP) Road Plan RP Private Road Request, with private /public comparison (PRR) Private Road Request — Development Area (PRR -DA) Preliminary Site Plan PSP Final Site Plan or amendment FSP Final Plat (FP) Preliminary Plat (PP) Easement Plat (EP) Boundary Adjustment Plat (BAP) Rezoning Plan (REZ) Special Use Permit Concept Plan (SP -CP) Reduced Concept Plan (R -CP) Proffers (P) Bond Estimate Request (BER) Draft Groundwater Management Plan (D -GWMP) Final Groundwater Management Plan (F -GWMP) Aquifer Testing Work Plan (ATWP) Groundwater Assessment Report (GWAR) Architectural Review Board (ARB) ARB- 2013 -156 1 Other: Please explain (For staff use only) Submittal Code # Copies Distribute To: Submittal Code # Copies Distribute To: ARB I M. Maliszewski