HomeMy WebLinkAboutARB201300187 Review Comments Final Site Plan and Comps. 2014-01-30ARCHITECTURAL REVIEW BOARD STAFF REPORT Project #/Name ARB- 2013 -187: Fifth Street Station Final Site Plan — Wegman's Review Type Final Site Development Plan Parcel Identification 076M10000002A0, 076M10000002B0, 076MI0000004AO Location North of I64, east of Fifth Street, west of Avon Street Extended Zoned Planned Development Shopping Center (PDSC), Entrance Corridor (EC) Owner /Applicant New Era Properties LLC /Bohler Engineering (Daniel R. Hines) Magisterial District Scottsville Proposal To construct a Wegman's grocery store as the first phase of development of a shopping center with 470,00 sf of buildings and associated site improvements on approximately 66 acres. None of the other shopping center buildings are proposed at this time. Context The site is bounded on the north by Moore's Creek and the Willoughby subdivision. A portion of the site adjacent to 5th Street falls within the City of Charlottesville. The remaining parcels fall within the 164 and Avon Street Entrance Corridors. In the vicinity on Avon Street is a mix of industrial, commercial and residential development. In the vicinity along 164 are the Holiday Inn and Christian Aid Mission to the west and the Joint Security Complex across 164 to the southeast. A number of residential developments, including apartment complexes, have been constructed in the vicinity adjacent to 164. A warehouse currently stands on the site. It is surrounded by a paved area that is surrounded by a wooded area. Visibility Site sections provided at the October 7, 2013 work session showed that the upper part of the Wegman's building will be visible from the 164 Entrance Corridor. The view will be through trees that stand in the right -of -way, and trees added with this proposal. The corner towers and the main 80' -tall tower will have greater visibility than the main walls of the building due to the increased height. The site sections also showed that the southeast corner of the building will be minimally visible from the Avon Street bridge over 164 in winter. The view from Avon Street at the entrance to the site will be of Bent Creek Parkway (the road leading to and around the development), the graded slopes along that road, and the park- and -ride lot. The Wegman's towers will also likely be visible from 5th Street. It is anticipated that the cleared site and illumination in the development will make the site evident from the corridors even if detailed views of the buildings are not available. ARB Meeting Date February 3, 2014 Staff Contact Margaret Maliszewski PROJECT HISTORY DATE APPLICATION RESULT 4/15/2013 Initial Site Plan The ARB reviewed the Initial Site Plan for this proposal and provided comments. See Attachment A for the action letter. 10/7/2013 Work Session The ARB held a work session on the 5th Street Station proposal with the focus of the discussion on the visibility of the Wegman's building from the ECs, including a review of site sections, planting and fence design for screening of loading areas, site and building lighting, and building height. CHANGES TO THE PROPOSAL Primary changes to the proposal since the last review include the following: 1. The retaining wall at the southwest corner of the site has been deleted by shifting the building and revising the parking layout. 2. A berm and landscaping are shown along the I64 side of the site. The fence discussed at the work session is not proposed at this time. ANALYSIS Please note the following: DG# refers to the action letter comments listed under "regarding requirements to satisfy the design guidelines." F# refers to the action letter comments provided "for future ARB submittals /reviews." GP# refers to the action letter comment listed under "conditions to be satisfied prior to issuance of a grading permit." In addition to the items listed in Table A, this analysis refers to site sections and photo - perspectives reviewed at the 10/7/2013 work session. The work session illustrations will be available for viewing at the 2/3/2014 meeting. REF GUIDELINE PREVIOUS ARB COMMENT ISSUE RECOMMENDATION Site development & layout, Structure design 6 Site development should be sensitive to the existing DG3. Revise the massing of Wegman's The overall mass of the building has not Revise the plant to indicate if the natural landscape and should contribute to the and Major Tenant A buildings to a scale changed from the Initial Site Plan proposal. windows in the shorter towers are creation of an organized development plan. This that does not overpower the natural Changes made to address massing have not transparent glass or some other may be accomplished, to the extent practical, by setting. changed the footprint of the building; instead, material. Indicate if the interior tower preserving the trees and rolling terrain typical of the the elevation facing I64 has been treated with space is illuminated. area; planting new trees along streets and pedestrian various elements to help improve the ways and choosing species that reflect native forest appearance of the long wall with no windows. Revise the plant to indicate if the elements; insuring that any grading will blend into Treatments that help address the massing issue clock in the tower is to be the surrounding topography thereby creating a include: the stepping of the angled walls of the illuminated. If it is, provide details continuous landscape; preserving, to the extent loading bays; horizontal bands of contrasting and clarify brightness. practical, existing significant river and stream color; two wide "piers" flanking the central 2 valleys which may be located on the site and integrating these features into the design of surrounding development; and limiting the building mass and height to a scale that does not overpower the natural settings of the site, or the Entrance Corridor. " Wegman's" sign mounted on the metal siding; and towers added at both ends of the rear elevation. The lower parts of the elevation are not expected to be visible from the EC due to topography. Grading and landscaping are proposed to reduce visibility of the building, and thereby reduce evidence of its scale and its Clarify if/how the concrete stains will match the corresponding materials listed on the materials board. Revise the elevation drawings to distinguish between Brick 1 and Brick 2, and to accurately label the concrete 9 Building forms and features, including roofs, DG1. Revise the massing of the windows, doors, materials, colors and textures Wegman's and Major Tenant A impact on the setting. stain colors. should be compatible with the forms and features of buildings to reflect the traditional the significant historic buildings in the area, architecture of the area. Break up the An 80' -tall tower is proposed at the northwest Provide a physical sample of the exemplified by (but not limited to) the buildings mass into components whose scale corner of the building and shorter towers are standing seam metal for review. described in Appendix A [of the design guidelines]. reflects that of the traditional proposed at the ends of the I64 elevation. The The standard of compatibility can be met through architecture of the area. shorter towers have a pyramidal standing seam scale, materials, and forms which may be embodied metal roof and an upper wall that is faced with in architecture which is contemporary as well as DG2. Revise the Wegman's and Major EIFS and divided into windows. (The windows traditional. The replication of important historic Tenant A buildings to reduce the visual aren't rendered like the other windows in the sites in Albemarle County is not the objective of effect from the Entrance Corridors. building.) The detailing is compatible with these guidelines. historic architecture in the area. F4. Where visible from the Entrance Corridors, provide a tower design The 80' -tower has a tall pyramidal roof with a whose form, materials and color respect decorative shingle pattern and gables at the the traditions of local historic buildings. base of the roof, above clock faces on EIFS- covered walls. The submittal does not indicate F5. Incorporate forms, features, if the clock is to be illuminated. The clock materials and colors to make the tower design doesn't specifically relate to local Wegman's and Major Tenant A examples. It is a Wegman's standard, but it buildings compatible with the historic incorporates generally traditional details and buildings in the area. Incorporate proportions. building relief. The elevation drawing doesn't distinguish between the Brick 1 and Brick 2 presented on the materials board. The concrete stains on the materials board are labeled as "to match" the EIFS, brick and block, but the displayed colors are not matches. Also, the color elevations appear to misidentify the concrete stains. The standing seam metal is proposed in a shade of red that differs significantly between the materials board and the color rendering; a physical sample hasn't been submitted. 11 The overall design of buildings should have human F2. Break down the massing of the The overall mass of the building hasn't None. scale. Scale should be integral to the building and Wegman's and Major Tenant A changed. The rear wall is treated with materials site design. buildings with form, color and and details to help break up its length and architectural detailing to reflect the blankness, and to correspond better to human traditional architecture of the area and scale. to reflect human scale. 13 Any appearance of "blankness" resulting from F3. Reduce the amount of blank wall on building design should be relieved using design the Entrance Corridor. detail or vegetation, or both. 15 Trademark buildings and related features should be F6. Revise trademark designs to meet Minor changes have been made to the standard None. modified to meet the requirements of the the Entrance Corridor guidelines. Wegman's design for this site. Additional Guidelines. changes would be recommended for a building with greater visibility than that which is illustrated in the site sections. Accessory structures and equipment 17 Accessory structures and equipment should be DG4. Eliminate the visual effect of the The site sections and photo - perspectives Provide elevations with the roofline, integrated into the overall plan of development and loading/service /refuse areas from the provided at the work session indicate that the equipment locations, and equipment shall, to the extent possible, be compatible with the Entrance Corridors. service areas won't be visible from the EC due heights shown. building designs used on the site. F I. Provide adequate visible to topography and trees. Parapets are expected to screen rooftop equipment, but an indication Add the standard mechanical 18 The following should be located to eliminate visibility from the Entrance Corridor street. If, after appropriate representation such as site sections, of roofline and equipment locations and equipment note to the site and siting, these features will still have a negative visual animations, digital models of existing heights on the elevations would confirm this. architectural drawings. impact on the Entrance Corridor street, screening topography and proposed development should be provided to eliminate visibility. a. Loading to clarify the degree of visibility of the The mechanical equipment note does not areas, b. Service areas, c. Refuse areas, d. Storage development from the Entrance appear on the site or architectural drawings. areas, e. Mechanical equipment, f. Above - ground Corridors, the visibility of the Major utilities, and Tenant A loading areas from the EC, g. Chain link fence, barbed wire, razor wire, and and to show how equipment, similar security fencing devices. particularly rooftop equipment, will be made invisible from the Entrance 21 The following note should be added to the site plan and the architectural plan: "Visibility of all Corridors. Consider flying balloons at mechanical equipment from the Entrance Corridor proposed building corners to further shall be eliminated." clarify visibility. F18c. Add the following notes to the plan: Visibility of all mechanical equipment from the Entrance Corridor shall be eliminated. Lighting A lighting plan was not previously provided. 22 Light should be contained on the site and not spill F8. Design site and building lighting to There is spillover in excess of .5 fc at the Revise the photometric plan to over onto adjacent properties or streets; minimize noticeability and impacts of the lighting. entrance on Bent Creek Road, where one OA fixture is proposed off site. eliminate spillover in excess of .5 fc, including at the entrance to the site 24 Light levels exceeding 30 footcandles are not appropriate for display lots in the Entrance from Bent Creek Road. Corridors. Lower light levels will apply to most F 14. Maximize planting of trees on site. Footcandle readings are not carried out to the other uses in the Entrance Corridors. Minimize the impact of lighting perhaps by limiting the height of parking lot and property line on the I64 side of the site. Eliminate the OA fixture that is proposed off -site. 27 The height and scale of freestanding, pole- mounted light fixtures should be compatible with the height roadway lighting to 20'. Some light levels exceed 20 footcandles at the and scale of the buildings and the sites they are rear service area of the building. 20 fc has Revise the photometric plan to carry illuminating, and with the use of the site. Typically, generally been considered a maximum for all the footcandle readings out to the the height of freestanding pole- mounted light but display lots in the ECs. property line on the I64 side of the fixtures in the Entrance Corridors should not exceed site. 20 feet, including the base. Fixtures that exceed 20 20' is identified as the maximum height for feet in height will typically require additional proposed pole fixtures. However, the plan does Limit illumination to 20 fc maximum. screening to achieve an appropriate appearance from not specify whether bases are proposed for the the Entrance Corridor. pole lights, and whether or not the base height is included in the 20' pole height. Indicate on the plan if bases are proposed for the pole lights and 28 In determining the appropriateness of lighting fixtures for the Entrance Corridors, the individual indicate that the base height is context of the site will be taken into consideration Two pole fixtures are shown on the slope up to included in the maximum 20' height. on a case by case basis. 164. Eliminate pole fixtures from the slope A clock tower is proposed at the northwest up to 164. corner of the building. The submittal does not indicate if the clock is illuminated. Revise the plan to include details on the illumination of the clock, if The numbers of HC and HD fixtures shown on illumination is proposed. the plan do not appear to coordinate with the quantities shown in the schedule. Coordinate the plan and fixture schedule regarding the quantity of HC There appear to be numerous conflicts between and HD fixtures. light poles and pipes. Revise the lighting plan to eliminate The materials board illustrates a lantern style light pole and utility conflicts. wall fixture for the building, but the lighting plans only show a lantern fixture as a pole Coordinate all drawings regarding the light. wall - mounted lantern fixtures. 29 The following note should be included on the F 18b. Add the following notes to the The note does not appear on the plan. Add the standard lighting note to the lighting plan: "Each outdoor luminaire equipped plan: Each outdoor luminaire equipped plan. with a lamp that emits 3,000 or more initial lumens with a lamp that emits 3,000 or more shall be a full cutoff luminaire and shall be arranged initial lumens shall be a full cutoff or shielded to reflect light away from adjoining luminaire and shall be arranged or residential districts and away from adjacent roads. shielded to reflect light away from The spillover of lighting from luminaires onto adjoining residential districts and away public roads and property in residential or rural from adjacent roads. The spillover of areas zoning districts shall not exceed one half lighting from luminaires onto public footcandle." roads and property in residential or rural areas zoning districts shall not exceed one half footcandle. Landscaping 32 Landscaping along the frontage of Entrance DG6. Revise the plan to show Trees proposed along the I64 side of the site do Locate all EC frontage trees within Corridor streets should include the following: consistent and adequate planting area not appear to conflict with utilities. the limits of the parcel, not in the a. Large shade trees should be planted parallel to the free of utilities and easements along the right -of -way. Entrance Corridor Street. Such trees should be at 164 side of the site, to a width sufficient 3'/2" American Sycamores are spaced 25' on least 3'h inches caliper (measured 6 inches above to mitigate visual impact from the center along the Avon Street frontage, but Intersperse flowering ornamental the ground) and should be of a plant species Entrance Corridor. some are in the right -of -way. No ornamental trees among the Sycamores along common to the area. Such trees should be located at trees are interspersed among the Sycamores. Avon Street. least every 35 feet on center. F9. Provide the standard Entrance b. Flowering ornamental trees of a species common to Corridor planting along Avon Street, the area should be interspersed among the trees consistent with the approved landfill required by the preceding paragraph. The ornamental work plan. trees need not alternate one for one with the large shade trees. They may be planted among the large shade trees in a less regular spacing pattern. c. In situations where appropriate, a three or four board fence or low stone wall, typical of the area, should align the frontage of the Entrance Corridor street. d. An area of sufficient width to accommodate the foregoing plantings and fencing should be reserved parallel to the Entrance Corridor street, and exclusive of road right -of -way and utility easements. 33 Landscaping along interior roads: DG7. Provide planting area for trees Trees are provided along Bent Creek Parkway. Submit revised road plans for review. a. Large trees should be planted parallel to all along Bent Creek Parkway from Avon The road plans identify the tree species and Along Bent Creek Parkway, label all interior roads. Such trees should be at least 2'/2 Street at least to the intersection of Bent sizes, but the trees don't appear to be trees, coordinate plant counts with inches caliper (measured six inches above the Creek Parkway with the first turnoff for coordinated with the retaining wall that also quantities listed in the plant schedule, ground) and should be of a plant species common to the Major Tenant A building, consistent runs along most of that road. Also, some plant and clearly show trees coordinated the area. Such trees should be located at least every with the approved landfill work plan. labels are missing and some of the plant counts with retaining walls. 40 feet on center. are inaccurate. F11. Provide Bent Creek Parkway trees Provide trees at a minimum of 2%2" at a minimum of 2'/2" caliper spaced 40' Trees are not proposed consistently along the caliper, spaced 40' on center, along on center, consistent with the approved travelway that connects Bent Creek Road with the travelway that connects Bent landfill work plan. the Wegman's parking lot. Creek Road with the Wegman's parking lot. 34 Landscaping along interior pedestrian ways: F12. Provide medium trees along all Trees are provided along Bent Creek Parkway, Provide medium trees, 2'/2" caliper, a. Medium trees should be planted parallel to all interior pedestrian ways at a minimum where there are sidewalks, but none are spaced 25' on center along the interior pedestrian ways. Such trees should be at of 2%2" caliper, spaced 25' on center. proposed along the sidewalk that runs through sidewalk that runs through the least 2'h inches caliper (measured six inches above the parking lot to the northeast corner of the parking lot to the northeast corner of the ground) and should be of a species common to building. the building. the area. Such trees should be located at least every 25 feet on center. Provide perimeter parking lot trees on the north side of the northern parking 35 Landscaping of parking areas: F 13. Provide perimeter parking lot trees Parking lots are located north, west and east of a. Large trees should align the perimeter of parking at 40' on center. the building. Trees are provided along the west lot, 2'/2" caliper at planting, 40' on areas, located 40 feet on center. Trees should be side of the northern parking lot, but not on its center. planted in the interior of parking areas at the rate of north or east sides. Trees are not provided on one tree for every 10 parking spaces provided and the west side of the western lot; that perimeter Provide the parking space count on should be evenly distributed throughout the interior is at the base of a 30' slope. the plan. Provide large trees at the of the parking area. interior of the parking lot, 1 for every b. Trees required by the preceding paragraph should There appear to be 823 parking spaces 10 parking spaces, 2'/2" caliper at measure 2'/2 inches caliper (measured six inches proposed, requiring 82 large interior parking planting. above the ground); should be evenly spaced; and lot trees. 67 large and 11 medium interior trees should be of a species common to the area. Such are proposed. None of the trees meet the trees should be planted in planters or medians required 2%2" planting size. sufficiently large to maintain the health of the tree and shall be protected by curbing. c. Shrubs should be provided as necessary to minimize the parking area's impact on Entrance Corridor streets. Shrubs should measure 24 inches in height. 36 Landscaping of buildings and other structures: F7. Planting area on the I64 side of the The landscape plan for the 164 side of the site Continue the planting on the I64 side a. Trees or other vegetation should be planted along site shall accommodate a mix of shows a mix of deciduous (red maple, pin oak, of the site the full length of the the front of long buildings as necessary to soften the deciduous and evergreen trees sufficient willow oak, sweetbay magnolia) and evergreen grading along the property line. appearance of exterior walls. The spacing, size, and to soften the appearance of the long (American holly, Norway spruce and white type of such trees or vegetation should be elevations of the Wegman's and Major pine) trees on the regularly graded slope south Coordinate the quantities of ZS, PS determined by the length, height, and blankness of Tenant A buildings, to integrate the of the service area. Some of the trees are and IG on the plan and in the plant such walls. buildings into the Entrance Corridor, proposed off site. South of the building they schedule. b. Shrubs should be used to integrate the site, and to mitigate any visibility of loading, are located between the 430' and 440' buildings, and other structures; dumpsters, service and refuse areas that remains elevations. West of the building they range Provide documentation showing that accessory buildings and structures; "drive thru" after appropriate siting. from the 452' elevation to 464'. The mature the planting and grading in the right - windows; service areas; and signs. Shrubs should height of the large trees ranges from 50' -70' to of -way is acceptable to VDOT. measure at least 24 inches in height. 60' -90'. Grading to be completed with this phase of development extends along the I64 side of the site 400' east of the easternmost tree that is proposed to be planted. Continuing the planting throughout this area would further mitigate appearances. 3 ZS trees are shown on the plan but ZS is not included in the plant schedule. The numbers of PS and IG shown on the plan do not appear to correspond to the quantities listed in the plant schedule. 38 Plant health: F18a. Add the following notes to the The note does not appear on the plan. Add the standard planting note to the The following note should be added to the landscape plan: All site plantings of trees and plan. plan: "All site plantings of trees and shrubs shall be shrubs shall be allowed to reach, and be allowed to reach, and be maintained at, mature maintained at, mature height; the height; the topping of trees is prohibited. Shrubs topping of trees is prohibited. Shrubs and trees shall be pruned minimally and only to and trees shall be pruned minimally and support the overall health of the plant." only to support the overall health of the plant. Site Grading 40 Site grading should maintain the basic relationship of DG5. Revise the interface between the By shifting the building and revising the None. the site to surrounding conditions by limiting the use site layout and the existing surrounding parking layout, the retaining wall located at the of retaining walls and by shaping the terrain through topography which is visible from the southwest corner of the site has been deleted the use of smooth, rounded land forms that blend with Entrance Corridors to better transition from the proposal. This has decreased tree the existing terrain. Steep cut or fill sections are between the proposed shopping terrace removal and provides a somewhat less abrupt generally unacceptable. Proposed contours on the and the existing grades, using a transition between the existing wooded slope grading plan shall be rounded with a ten foot combination of planting, material, and the building. Other retaining walls minimum radius where they meet the adjacent terracing, and other strategies to more proposed in this phase of development are not condition. Final grading should achieve a natural, effectively correspond to the guidelines. expected to be visible from the corridors. The rather than engineered, appearance. Retaining walls 6 Major Tenant A building is not proposed at this feet in height and taller, when necessary, shall be F 15. Terrace the wall at the Major time. terraced and planted to blend with the landscape. Tenant A building into segments no more than 6' tall. Plant the terraces. F 16. Provide retaining wall details for review. Identify materials and colors; provide samples. F17. Round contours with a 10' minimum radius where they meet the adjacent condition. 41 No grading, trenching, or tunneling should occur GP 1. Provide a conservation plan The checklist is provided. None. within the drip line of any trees or other existing checklist. Show all the checklist items features designated for preservation in the final on the plan. Certificate of Appropriateness. Adequate tree protection fencing should be shown on, and coordinated throughout, the grading, landscaping and erosion and sediment control plans. 42 Areas designated for preservation in the final Certificate of Appropriateness should be clearly delineated and protected on the site prior to any grading activity on the site. This protection should remain in place until completion of the development of the site. 43 Preservation areas should be protected from storage or movement of heavy equipment within this area. 45 Fuel Pump Canopies No fuel pump canopies are included in this phase of development. None at this time. Staff recommends the following as the primary points of discussion: 1. Building mass /scale, visibility, and architectural design. 2. Tower visibility and architectural design 3. Building materials /colors 4. The berm and planting along the I64 side of the site Staff offers the following comments on the proposal: 1. Revise the plan to indicate if the windows in the shorter towers are transparent glass or some other material. Indicate if the interior tower space is illuminated. 2. Revise the plan to indicate if the clock in the tower is to be illuminated. If it is, provide details and clarify brightness. 3. Clarify if /how the concrete stains will match the corresponding materials listed on the materials board. 4. Revise the elevation drawings to distinguish between Brick 1 and Brick 2, and to accurately label the concrete stain colors. 5. Provide a physical sample of the standing seam metal for review. 6. Provide elevations with the roofline, equipment locations, and equipment heights shown. 7. Add the standard mechanical equipment note to the plan: "Visibility of all mechanical equipment from the Entrance Corridor shall be eliminated." 8. Revise the photometric plan to eliminate spillover in excess of .5 fc, including at the entrance to the site from Bent Creek Road. 9. Eliminate the OA fixture that is proposed off -site. 10. Revise the photometric plan to carry the footcandle readings out to the property line on the I64 side of the site. 11. Limit illumination to 20 fc maximum. 12. Indicate on the plan if bases are proposed for the pole lights and indicate that the base height is included in the maximum 20' height. 13. Eliminate pole fixtures from the slope up to I64. 14. Coordinate the plan and fixture schedule regarding the quantity of HC and HD fixtures. 15. Revise the lighting plan to eliminate light pole and utility conflicts. 16. Coordinate all drawings regarding the wall - mounted lantern fixtures. 17. Add the standard lighting note to the plan: "Each outdoor luminaire equipped with a lamp that emits 3,000 or more initial lumens shall be a full cutoff luminaire and shall be arranged or shielded to reflect light away from adjoining residential districts and away from adjacent roads. The spillover of lighting from luminaires onto public roads and property in residential or rural areas zoning districts shall not exceed one half footcandle." 18. Locate all EC frontage trees within the limits of the parcel, not in the right -of -way. 19. Intersperse flowering ornamental trees among the Sycamores along Avon Street. 20. Submit revised road plans for review. Label all trees, coordinate plant counts with quantities listed in the plant schedule, and clearly show trees coordinated with retaining walls. 21. Provide trees at a minimum of 21/2" caliper, spaced 40' on center, along the travelway that connects Bent Creek Road with the Wegman's parking lot. 22. Provide medium trees, 2%2" caliper, spaced 25' on center along the sidewalk that runs through the parking lot to the northeast corner of the building. 23. Provide perimeter parking lot trees on the north side of the northern parking lot, 21/2" caliper at planting, 40' on center. 24. Provide the parking space count on the plan. Provide large trees at the interior of the parking lot, 1 for every 10 parking spaces, 2%2" caliper at planting. 10 25. Continue the planting on the I64 side of the site the full length of the grading along the property line. 26. Coordinate the quantities of ZS, PS and IG on the plan and in the plant schedule. 27. Provide documentation showing that the planting and grading in the right -of -way is acceptable to VDOT. 28. Add the standard landscape note to the plan: "All site plantings of trees and shrubs shall be allowed to reach, and be maintained at, mature height; the topping of trees is prohibited. Shrubs and trees shall be pruned minimally and only to support the overall health of the plant." TABLE A This report is based on the following submittal items: Sheet # Drawing Name Drawing Date Materials 1 Cover 12/13/2013 Brick 1.Field — Old Virginia Red Colonial Range 5 Overall Site Plan 12/13/2013 2.Trim — Old Virginia Flashed Virginia Rose 6A -6G Site Plan 12/13/2013 1 Split face CMU York Building Products YBP -25 7A -7G Grading Plan 12/13/2013 Manufactured stone veneer Eldorado - New Haven Limestone 13A -13J Landscape Plan 12/13/2013 Chiseled edge wainscot sill - Eldorado Stone Buckskin 14A -14B Landscape Details 12/13/2013 Fiberglass shingle GAF Slateline — Weathered Slate 15A -15G Lighting Plan 12/13/2013 GAF Slateline — Victorian Red 16A -16E Lighting Details 12/13/2013 Standing seam metal roof Red A -1 Building Floor Plan 12/23/2013 EMS 1.Dryvit 381 Monastery Brown - Color Elevations 1/10/2014 2.D it 442 Cotton 3.Dryvit 108 Manor White 4.Dryvit 374A Fudge Siding effect, barn door detail Precast concrete stain 1.To match EIFS 1 2.To match EFIS 2 3. To match Brick 1 4.To match CMU base 11 ATTACHMENT A Phone (434) 296 -5832 April 19, 2013 Bohler Engineering C/O Daniel R. Hines, P.E. 28 Blackwell Park Lane Warrenton, Va 20186 RE: ARB- 2013 -26: Fifth Street Station Initial Site Plan 076M10000002A0, 076M10000002B0, 076M10000004A0 Dear Mr. Hines: Lrf2C;l1�ZA COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902 -4596 Fax (434) 972 -4126 At its meeting on Monday, April 15, 2013, the Albemarle County Architectural Review Board, by a vote of 3:0, voted to forward the following recommendations on the above -noted Initial Site Development Plan to the agent for the Site Review Committee: Regarding requirements to satisfy the design guidelines as per 30.6.4(2), (3) and (5): 1. Revise the massing of the Wegman's and Major Tenant A buildings to reflect the traditional architecture of the area. Break up the mass into components whose scale reflects that of the traditional architecture of the area. 2. Revise the Wegman's and Major Tenant A buildings to reduce the visual effect from the Entrance Corridors. 3. Revise the massing of Wegman's and Major Tenant A buildings to a scale that does not overpower the natural setting. 4. Eliminate the visual effect of the loading /service /refuse areas from the Entrance Corridors. 5. Revise the interface between the site layout and the existing surrounding topography which is visible from the Entrance Corridors to better transition between the proposed shopping terrace and the existing grades, using a combination of planting, material, terracing, and other strategies to more effectively correspond to the guidelines. 6. Revise the plan to show consistent and adequate planting area free of utilities and easements along the 164 side of the site, to a width sufficient to mitigate visual impact from the Entrance Corridor. 12 7. Provide planting area for trees along Bent Creek Parkway from Avon Street at least to the intersection of Bent Creek Parkway with the first turnoff for the Major Tenant A building, consistent with the approved landfill work plan. Regarding recommended conditions of initial site plan approval: 1. Approval of a Certificate of Appropriateness is required prior to final site plan approval. Regarding conditions to be satisfied prior to issuance of a grading permit: 1. Provide a conservation plan checklist. Show all the checklist items on the plan. The ARB also provided the following comments for future ARB submittals /reviews: 1. Provide adequate visible representation such as site sections animations digital models of existing topography and proposed development to clarify the degree of visibility of the development from the Entrance Corridors, the visibility of the Major Tenant A loading areas from the EC, and to show how equipment, particularly rooftop equipment, will be made invisible from the Entrance Corridors. Consider flying balloons at proposed building corners to further clarify visibility. 2. Break down the massing of the Wegman's and Major Tenant A buildings with form, color and architectural detailing to reflect the traditional architecture of the area and to reflect human scale. 3. Reduce the amount of blank wall on the Entrance Corridor. 4. Where visible from the Entrance Corridors, provide a tower design whose form, materials and color respect the traditions of local historic buildings. 5. Incorporate forms, features, materials and colors to make the Wegman's and Major Tenant A buildings compatible with the historic buildings in the area. Incorporate building relief. 6. Revise trademark designs to meet the Entrance Corridor guidelines. 7. Planting area on the 164 side of the site shall accommodate a mix of deciduous and evergreen trees sufficient to soften the appearance of the long elevations of the Wegman's and Major Tenant A buildings, to integrate the buildings into the Entrance Corridor, and to mitigate any visibility of loading, service and refuse areas that remains after appropriate siting. 8. Design site and building lighting to minimize noticeability and impacts of the lighting. 9. Provide the standard Entrance Corridor planting along Avon Street, consistent with the approved landfill work plan. 10. Include parcel 77 -11 E on the cover sheet. 11. Provide Bent Creek Parkway trees at a minimum of 21/2" caliper spaced 40' on center, consistent with the approved landfill work plan. 12. Provide medium trees along all interior pedestrian ways at a minimum of 2'/2" caliper, spaced 25' on center. 13. Provide perimeter parking lot trees at 40' on center. 14. Maximize planting of trees on site. Minimize the impact of lighting perhaps by limiting the height of parking lot and roadway lighting to 20'. 15. Terrace the wall at the Major Tenant A building into segments no more than 6' tall. Plant the terraces. 16. Provide retaining wall details for review. Identify materials and colors; provide samples. 17. Round contours with a 10' minimum radius where they meet the adjacent condition. 18. Add the following notes to the plan: All site plantings of trees and shrubs shall be allowed to reach, and be maintained at, mature height; the topping of trees is prohibited. Shrubs and trees shall be pruned minimally and only to support the overall health of the plant. Each outdoor luminaire equipped with a lamp that emits 3,000 or more initial lumens shall be a full cutoff luminaire and shall be arranged or shielded to reflect light away from adjoining residential districts and away from adjacent roads. The spillover of lighting from luminaires onto public roads and property in residential or rural areas zoning districts shall not exceed one half footcandle. 13 Visibility of all mechanical equipment from the Entrance Corridor shall be eliminated. You may submit your application for continued ARB review at your earliest convenience. Application forms, checklists and schedules are available on -line atwww.albemarle.org/ARB. Please be certain that your ARB submittal addresses the above -noted issues. If you have any questions concerning any of the above, please feel free to call me. Sincerely, Margaret Maliszewski Principal Planner cc: Dan Tucker, S.J. Collins Enterprises 5b Southwest Broad St., Suite B Fairburn, Ga 30213 New Era Properties LLC P O Box 1467 Charlottesville Va 22902 14