HomeMy WebLinkAboutWPO201300050 Review Comments Stormwater Management Plan 2014-01-07Michelle Roberge
From: Michelle Roberge
Sent: Tuesday, January 07, 2014 10:11 AM
To: Frank Pohl; David Anhold
Subject: RE: WAHS Biofilter Plans
Hi Frank,
Glenn just passed them on to me. I approved all 4 plans.
- Michelle
From: Frank Pohl
Sent: Tuesday, January 07, 2014 9:25 AM
To: David Anhold; Michelle Roberge
Subject: RE: WAHS Biofilter Plans
Michelle,
Good morning. Is there a chance these plans can be signed /approved today? Our contractor would like to schedule his
E &S pre- construction meeting.
Thanks,
Frank
Frank V. Pohl, PE, LEED AP BD +c
Senior Project Manager
Office of Facilities Development
County of Albemarle
401 McIntire Road, Room 228
Charlottesville, Virginia 22902 -4596
T (434) 872 -4501 ext. 9 -7914
F (434) 972 -4091
C (434) 466 -7458
From: David Anhold [mailto:danhold(a)hughes.net]
Sent: Monday, January 06, 2014 2:13 PM
To: Michelle Roberge
Cc: Frank Pohl
Subject: WAHS Biofilter Plans
Michelle,
Just a heads -up. At 12:30 1 dropped off 4 sets of plans for your signature along with one signed and sealed copy of the
Drainage Report.
David
ANHOLD ASSOCIATES
Landscape Architecture Site Design Planning
8311 Rockfish Gap Trnpk.
Greenwood, VA 22943
ANHOLDLA.COM 434 - 882 -3420
�RGICn4'
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road
Charlottesville, Virginia 22902
WPO Plan Review
Project: Western Albemarle High School SWM Improvements
Number: WP0201300050
Date Plan Received: 8/13/2013
Date of Review: 8/27/2013
Reviewer: Michelle Roberge Phone: 434 - 296 -5832
This is an abbreviated review comment notice. County engineering staff is available every Thursday
afternoon to discuss details of review. To schedule, please call your reviewer for an appointment.
Erosion & Sediment Control:
(Code Chapter 17, Article II)
Y N
X Adequate
Not Adequate
State standards followed, and Design Standards Manual notes and details
Adequate limits and perimeter measures out of work areas
All stages protected adequately
Adequate channels
Stormwater Management:
(Code Chapter 17, Article III)
Y N
Adequate
g Not Adequate
Enough capture and treatment for on -site areas
Enough detention storage for on -site areas
Sealed hydrologic and hydraulic computations provided
The storm manhole serves to carry runoff to biofilter, but it will need
to fill up to elev. 653.20 before it is conveyed to the biofilter via 18"
HDPE pipe. The riser will continue to pond water and may be a
breeding ground for mosquitos. Please revise design to avoid ponding
in riser.
Mitigation:
(Code Chapter 17, Article III)
Y N
n/a Adequate
Not Adequate
Buffers and disturbed areas adequately shown
Adequate plantings at 2:1, or other mitigation provided
This review attempts to encompass the larger compliance questions. County staff does not assume
responsibility for any calculation or plan details, and cannot cover the intricacies of every plan submitted.
Each plan and calculation must have a professional seal and signature to assume these responsibilities.
This plan
Approved (please see attached Approval Fact Sheet)
X Not Approved
is
�RGICn4'
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road
Charlottesville, Virginia 22902
WPO Plan Review
Project: Western Albemarle High School SWM Improvements
Number: WP0201300050
Date: 7/23/2013
Reviewer: Michelle Roberge Phone: 434 - 296 -5832
This is an abbreviated review comment notice. County engineering staff is available every Thursday
afternoon to discuss details of review. To schedule, please call your reviewer for an appointment.
Erosion & Sediment Control:
(Code Chapter 17, Article II)
Y N
Adequate
X Not Adequate
State standards followed, and Design Standards Manual notes and details
Adequate limits and perimeter measures out of work areas
All stages protected adequately
Adequate channels
See notes on plan.
Stormwater Management: Adequate
(Code Chapter 17, Article III)
Not Adequate
Y N
Enough capture and treatment for on -site areas
Enough detention storage for on -site areas
Sealed hydrologic and hydraulic computations provided
SWM plan is required. State if stream is perennial or intermittent and
provide stream buffer per 17 -317 (b). Look into Section 17 -318
Management of Stream Buffer. See notes on plan.
Mitigation:
(Code Chapter 17, Article III) Adequate
Not Adequate
Y N
Buffers and disturbed areas adequately shown
Adequate plantings at 2:1, or other mitigation provided
Mitigation plan is required for channel restoration per Section 17 -322.
Look into Section 17 -323 for maintenance details and Albemarle
County Design Standards for mitigation requirements. Also, verify if
WPO buffer is disturbed as this may add to required mitigation area.
See notes on plan.
This review attempts to encompass the larger compliance questions. County staff does not assume
responsibility for any calculation or plan details, and cannot cover the intricacies of every plan submitted.
Each plan and calculation must have a professional seal and signature to assume these responsibilities.
This plan
Approved (please see attached Approval Fact Sheet)
X Not Approved
is
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road
Charlottesville, Virginia 22902
WPO Plan Review
Project: Western Albemarle High School SWM Improvements
Number: WPO201300050
Date Plan Received: 8/13/2013
Date of Review: 8/27/2013
Reviewer: Michelle Roberge Phone: 434-296-5832
This is an abbreviated review comment notice. County engineering staff is available every Thursday
afternoon to discuss details of review. To schedule, please call your reviewer for an appointment.
Erosion & Sediment Control:
(Code Chapter 17, Article II)
Y N
X State standards followed, and Design Standards Manual notes and details
X Adequate limits and perimeter measures out of work areas
X All stages protected adequately
X Adequate channels
Stormwater Management:
(Code Chapter 17, Article III)
Y N
X Enough capture and treatment for on-site areas
X Enough detention storage for on-site areas
X Sealed hydrologic and hydraulic computations provided
X The storm manhole serves to carry runoff to biofilter, but it will need
to fill up to elev. 653.20 before it is conveyed to the biofilter via 18”
HDPE pipe. The riser will continue to pond water and may be a
breeding ground for mosquitos. Please revise design to avoid ponding
in riser.
Mitigation:
(Code Chapter 17, Article III)
Y N
Buffers and disturbed areas adequately shown
Adequate plantings at 2:1, or other mitigation provided
This review attempts to encompass the larger compliance questions. County staff does not assume
responsibility for any calculation or plan details, and cannot cover the intricacies of every plan submitted.
Each plan and calculation must have a professional seal and signature to assume these responsibilities.
X Adequate
Not Adequate
Adequate
x Not Adequate
n/a Adequate
Not Adequate
This plan is
Approved (please see attached Approval Fact Sheet)
X Not Approved
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road
Charlottesville, Virginia 22902
WPO Plan Review
Project: Western Albemarle High School SWM Improvements
Number: WPO201300050
Date: 7/23/2013
Reviewer: Michelle Roberge Phone: 434-296-5832
This is an abbreviated review comment notice. County engineering staff is available every Thursday
afternoon to discuss details of review. To schedule, please call your reviewer for an appointment.
Erosion & Sediment Control:
(Code Chapter 17, Article II)
Y N
X State standards followed, and Design Standards Manual notes and details
X Adequate limits and perimeter measures out of work areas
X All stages protected adequately
X Adequate channels
See notes on plan.
Stormwater Management:
(Code Chapter 17, Article III)
Y N
Enough capture and treatment for on-site areas
Enough detention storage for on-site areas
Sealed hydrologic and hydraulic computations provided
SWM plan is required. State if stream is perennial or intermittent and
provide stream buffer per 17-317 (b). Look into Section 17-318
Management of Stream Buffer. See notes on plan.
Mitigation:
(Code Chapter 17, Article III)
Y N
Buffers and disturbed areas adequately shown
Adequate plantings at 2:1, or other mitigation provided
Mitigation plan is required for channel restoration per Section 17-322.
Look into Section 17-323 for maintenance details and Albemarle
County Design Standards for mitigation requirements. Also, verify if
WPO buffer is disturbed as this may add to required mitigation area.
See notes on plan.
This review attempts to encompass the larger compliance questions. County staff does not assume
responsibility for any calculation or plan details, and cannot cover the intricacies of every plan submitted.
Each plan and calculation must have a professional seal and signature to assume these responsibilities.
Adequate
X Not Adequate
Adequate
Not Adequate
Adequate
Not Adequate
This plan is
Approved (please see attached Approval Fact Sheet)
X Not Approved