HomeMy WebLinkAboutWPO200500078 Review Comments Bond Inspection 2014-01-06�OF Aij� `�RG1N1P Subdivision Bond Inspection COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road Charlottesville, Virginia 22902 Project: HTC Laurel Park Lane Phase 2 Number: WP0200500078 Date: 6 Jan 2014 Reviewer: Michelle Roberge Original Bond Amount: $56,470 Phone: (434) 296 -5832 Current Bond Amount: $96,680 (rz as mlaleot bond Girxaf ) Your bond inspection request has been processed. This list contains an update on the items received and approved. Received Approved Y N Y N N/A r p Completed inspection request and fee 'M ❑ ❑ 0 ❑ As -built plan, updated to current date, per As -built policy ❑ ❑ Zr ❑ Copies of recorded plats for right -of -way, easements ❑ ❑ ❑ Z VDOT approval AM -4.3, or partial completion via punchlist ❑ ❑ ❑ ❑ X Letter from P.E. certifying improvements are built to plan ❑ ❑ ❑ ❑ 21 Current certification form completed by owner /developer ❑ ❑ ❑ 2T ❑ CBR test reports for each road ❑ ,K ❑ ❑ 0 Stone depth and material inspection reports (or core tests) ❑ ❑ ❑ ❑ 0 Pavement depth and material inspection reports (or core tests) ❑ ❑ ❑ ❑ RT Compaction test reports for fill areas under road ❑ ❑ ❑ ❑ Rr Pipe trench inspection reports ❑ ❑ ❑ ,H' ❑ Pipe interior inspections reports and video ❑ 0( ❑ ❑ Z Concrete test reports for structural concrete, curbing, aprons, etc. ❑ ❑ ❑ ❑ Z Structural inspection reports for any bridges or box culverts ❑ ❑ ❑ Updated bond amount based on completed work: $96,680 Based on the new current pricing, the bond amount increased to $96,680. Unforetunately, this amount cannot be reduced. Some items submitted for review are for the wrong phase. Please see below. Please provide the following for the next inspection request: a) Thews -built submitted is for Phase 1 and not Phase 2. Refer to As -built Road Plan policy for next submittal. The plan was not to scale and missing info from the As -built Road Plan policy. b) Recorded plat has been submitted, but I need correct as -built to compare easement locations. c) CBR appears to be for Phase 1 and not Phase 2. Please submit CBR for Phase 2. d) Pipe inspection video needs to be on a CD for our records. Also, the pipes for Phase 2 are not shown. Please show pipes east of 2a.