Loading...
HomeMy WebLinkAboutWPO201200062 Review Comments Bond Estimate 2013-12-10Old Trail Creekside III Phase III WPO file number: WP0201200062 Stormwater Management Plan Bond Estimate Item Item Number 19 3 4 5 6 7 8 9 10 11 pipe, rep, cmp (15 to 48 ") 24.0 in d proj mgmt 1 ES -1,2 $50.00 basin Total $77,470 $0.00 2 ea $1,500.00 height of dam at toe 0 ft cut at dam 0 ft height of dam at face 0 ft cut at high side 0 ft $19.00 length of dam 260 ft length of cut 0 ft top width 0 ft width of cut 0 ft 1 ea (comp. fill Vol) 0.0 cy (cut Vol) 0.0 cy $5,000.00 length of spillway 0 ft (cy est) 0.0 width of spillway 0 ft (spillway stone tons) 0 (price of base) $0 barrel collars 0 baffle length 0 ft trash rack/ anti vortex devices maintenance access road (LF) rip -rap, placed depth 3 ft length 127.0 ft width 8.0 (tons) 228.6 filter cloth - geotextile fabric length 127.0 ft width 9.5 ft survey and layout (price per 0.1 mi.) acres 17 basins 1 mobilization as -built drawings (per facility) materials testing (per facility) compaction testing (per dam) No. Unit Unit Cost Cost installed 1 EC -1 0.0 ft $50.00 $1,000.00 cost sum $13.00 proj mgmt $9,185.25 $50.00 $0.00 Total $77,470 $0.00 2 ea $1,500.00 $3,000.00 500 ft $50.00 $25,000.00 $60.00 $13,716.00 134 sy $2.00 $19.00 $9,000.00 $500.00 1 ea $2,000.00 $2,000.00 1 ea $2,000.00 $2,000.00 1 ea $5,000.00 $5,000.00 cost sum $61,235.00 proj mgmt $9,185.25 contingency $7,042.03 Total $77,470 C:\ Users \mkoslow\ Documents \CurrentReviews \WP0201200062 Old Trail Creekside Phase III Street Plans\2013- 12- 10 -SWM bond estimate WPO2012 -00062 12/10/2013