Loading...
HomeMy WebLinkAboutWPO201400003 Review Comments Stormwater Management Plan 2014-02-14�RGICn4' COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road Charlottesville, Virginia 22902 WPO Plan Review Project: Earlysville Business Park Number: WP0201400003 Date: 14 Feb 2014 Reviewer: Michelle Roberge This is an abbreviated review comment notice. County engineering staff is available every Thursday afternoon to discuss details of review. To schedule, please call your reviewer for an appointment~ Erosion & Sediment Control: Adequate (Code Chapter 17, Article II) Not Adequate Y N State standards followed, and Design Standards Manual notes and details Adequate limits and perimeter measures out of work areas All stages protected adequately Adequate channels X ■Clearing and grubbing is stated in notes on sheet C2.0. Please provide an erosion and sediment control plan to include all E &S measures. ■Address MS -19. Stormwater Management: (Code Chapter 17, Article III) Y N Adequate X Not Adequate Enough capture and treatment for on -site areas Enough detention storage for on -site areas Sealed hydrologic and hydraulic computations provided ■The fee paid is for an amendment. Which plan is this amending? ■Please label the type of pond on plans. ■Please show boundary lines on plan. ■Please show DA for existing and proposed areas. Label area, CN and Tc. ■Please submit the BMP removal rate to clarify what is going to be treated. The impervious area shown on WP02006 -0003 will be treated with the proposed pond submitted on this application. However, I did not include the approved SDP200800061 (machine shop with parking lot). Please clarify what the plan is for the machine shop and if this should be included in BMP removal rate calcs. Also, clarify if future impervious areas should be assumed for the sizing of this pond. ■Please provide a sediment forebay. ■The DA for site is only 18.83 acres compared to your 23.16 acres. Please confirm DA. ■Provide a 10' wide access road. ■Label length of culvert on C2.0. ■The weir length and culvert size do not match on plans, title page, and calcs. Please match. ■The pond needs to detain the 10 year storm with a peak rate of 66.5 cfs to meet existing conditions. ■Show SWM easement. This easement should encompass the 100 year watermark and access road. ■Please add SWM notes. ■Show detail of trash rack. ■Show 10 year and 100 year elevations within pond section. Please show a complete pond section. For example combine detail 1 and 3. Show length of vegetated channel for spillway on plan. ■The access road seems to connect to an existing road. However, the existing road does not appear to be on an approved site plan. Easements should be shown on access road, but provide clarification on existing road first so that this access road may connect to it. Mitigation: (Code Chapter 17, Article III) Adequate Not Adequate Y N n/a Buffers and disturbed areas adequately shown n/a Adequate plantings at 2:1, or other mitigation provided This review attempts to encompass the larger compliance questions. County staff does not assume responsibility for any calculation or plan details, and cannot cover the intricacies of every plan submitted. Each plan and calculation must have a professional seal and signature to assume these responsibilities. This plan Approved (please see attached Approval Fact Sheet) X Not Approved is [17- 204.fJ An application for an erosion and sediment control plan that requires modifications, terms, or conditions to be included in order for it to be approved shall be deemed to be withdrawn if the owner fails to submit a revised plan addressing the omitted modifications, terms or conditions within six (6) months after the owner is informed of the omitted information as provided under paragraph (B).