Loading...
HomeMy WebLinkAboutARB201300092 Review Comments Initial Site Plan 2013-08-19Lrf2C;l1�ZA COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 August 23, 2013 Tim Miller 1413 Sachem Place, Ste 1 Charlottesville, Va 22901 RE: ARB- 2013 -92: Cole's Import Specialists TMP: 045000000100B0 Dear Mr. Miller: At its meeting on Monday, August 19, 2013, the Albemarle County Architectural Review Board reviewed the above -noted application and took the following actions: Regarding the Preliminary Review of the site and architectural design The ARB offered the following comments on the preliminary proposal: 1. Revise the window size and placement to achieve proportions that are more compatible with the overall building and to relieve blankness. 2. Revise the storefront to achieve proportions that are more compatible with the overall building and to relieve blankness. 3. Provide the left side elevation for review. Clarify the window and door placement on the left elevation. 4. Coordinate the materials schedule on the building elevation sheets with the submitted material samples. 5. Include the standard equipment visibility, landscaping and lighting notes on the plans. 6. All wall and site lights shall be full cutoff fixtures. Provide a complete lighting plan for review. 7. Provide a complete plant schedule on the landscape plan for review. 8. Add a third large shade tree to the EC frontage planting. 9. Intersperse flowering ornamental trees along the EC frontage. 10. Confirm that trees and shrubs can be planted along the existing water line as currently shown. If the water line precludes the ability to plant, increase the planting area to accommodate the required trees. 11. Confirm that all utilities and easements are clearly identified on the plans. 12. Provide large trees, 2'/2" caliper at planting, 40' on center, along the travelway on the east side of the parcel. 13. Provide large trees, 2'/2" caliper at planting, 40' on center, along the perimeters of the parking lots. 14. Provide shrubs along the west side of the front parking lot. 15. Provide all plants without conflicting with utilities or easements. 16. Provide trees, in sufficiently large planting beds, along the building elevations to mitigate the blank wall areas. 17. Indicate on the plan the proposed materials and colors for the retaining wall, and include details for the handrail, with proposed colors and materials. 18. Show tree protection fencing on the plan. Regarding the Intial Site Plan By a vote of 4:0 the ARB forwarded the following recommendations to the agent for the Site Review Committee: 1. Regarding requirements to satisfy the design guidelines as per § 18- 30.6.4(2), (3) and (5): o As per § 32.4.2.2(b)(3) and 30.6.4(c)(3) and EC Guidelines 35a and 36a, it is not clear that sufficient planting area is available along the west side of the site to accommodate shrubs and trees at 2'/2" caliper, 40' on center, along the front parking lot or that sufficient planting area is available to accommodate trees and shrubs to mitigate the appearance of the east and west building elevations. 2. Regarding recommendations on the plan as it relates to the guidelines: o None. 3. Regarding recommended conditions of initial site plan approval: a. A Certificate of Appropriateness is required prior to final site plan approval. • Provide utility free planting area along the west side of the site to accommodate shrubs and trees at 2'/2" caliper, 40' on center, along the front parking lot or provide evidence that those trees and shrubs in this area will not conflict with or be compromised by existing or proposed utilities. • Provide sufficient planting area for trees and shrubs to mitigate the appearance of the east and west building elevations. 4. Regarding conditions to be satisfied prior to issuance of a grading permit: a. Provide a tree conservation plan. Show tree protection fencing along all tree lines to remain. You may submit your application for continued ARB review at your earliest convenience. Application forms, checklists and schedules are available on -line at www.albemarle.org /ARB. Revised drawings addressing the comments listed above are required. Include updated ARB revision dates on each drawing. Please provide a memo including detailed responses indicating how each comment has been addressed. If changes other than those requested have been made, identify those changes in the memo also. Highlighting the changes in the drawing with "clouding" or by other means will facilitate review and approval. If you have any questions concerning any of the above, please feel free to call me. Sincerely, Margaret Maliszewski Principal Planner cc: Green, Clarence William 300 Camellia Drive Charlottesville Va 22903 Katurah Roell Piedmont Development Group 2811 Hydraulic Road Charlottesville, VA 22901 File