Loading...
HomeMy WebLinkAboutSDP201300053 Review Comments Initial Site Plan 2013-10-21 (3)pF AL �IRGII31P+ COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 October 24, 2013 Tim Miller Meridian Planning Group, LLC 1413 Schein Place, Suite 2 Charlottesville, Virginia 22901 RE: SDP - 2013 -053 MonU Park- Initial Site Plan Mr. Miller: The Agent for the Board of Supervisors hereby grants administrative approval to the above referenced site plan. This approval shall be valid for a period of five (5) years from the date of this letter, provided that the developer submits a final site plan for all or a portion of the site within one (1) year after the date of this letter as provided in section 32.4.3.1 of Chapter 18 of the Code of the County of Albemarle, and thereafter diligently pursues approval of the final site plan. An Erosion and Sediment Control Permit may be issued after the following approvals are received: 1. Approval an Erosion and Sediment Control Plan meeting the requirements of Chapter 17 of the Code of the County of Albemarle. 2. Approval of a Stormwater Management Plan meeting the requirements of Chapter 17 of the Code. 3. Approval of all easements for facilities for stormwater management and drainage control. 4. Approval of a mitigation plan for the disturbance of Water Protection Ordinance buffers. 5. Submittal of a tree conservation checklist. The final site plan will not be considered to have been officially submitted until the following items are received: 1. A final site plan that satisfies all of the requirements of section 32.6 of Chapter 18 of the Code. 2. A fee of $1,500. 3. Submittal of plans directly to each of the agencies /departments listed below necessary to satisfy the conditions of approval. The final site plan will not be approved until the following conditions are met: The Department of Community Development shall not accept submittal of the final site plan for signature until tentative approvals for the following conditions have been obtained: Planning Division Approval of (2 Copies are required to be submitted for review) 1. A site plan meeting all the requirements of section 32.6 of Chapter 18 of the Code. 2. [32.5.2(a)] The special use permit approval letter on sheet C -301 is not the approved/signed letter. Replace with correct letter and conditions. The letter is dated September 25, 2013. 3. [32.5.2(a)] Revise the setbacks on the cover sheet to be 75 feet not inches 4. [32.5.2(a)] Provide the names of the owners, zoning district, tax map and parcel numbers and present uses of all abutting parcels. Engineering Division Approval of. (1 Copy is required to be submitted for review) 1. An Erosion and Sediment Control Plan meeting the requirements of Chapter 17 of the Code of the County of Albemarle 2. A Stormwater Management Plan meeting the requirements of Chapter 17 of the Code. 3. All easements for facilities for stormwater management and drainage control. 4. A mitigation plan for the disturbance of Water Protection Ordinance buffers. 5. On sheet C -201, the plan calls for a gravel parking area and gravel access road. The title page shows the parking area as 6" - #21 aggregate base with prime and double seal and the access road as 6" 421 aggregate base. To clarify, please show a pavement section on sheet C -201 for access road and parking area. 6. For proper drainage, show a crown on the access road pavement section. Please show a ditch on both sides of gravel road. 7. After conducting a site visit, there appears to be a low spot near the 348 contour on the access road. Please address drainage for low spot. 8. If parking is gravel, address how each parking space will be delineated. The site had timber lined to separate each parking space. This will need to be installed or drilled into ground. Please address on plans. Also, install handicap parking signs. 9. The parking area is pretty flat. It does not appear that much runoff will drain to water quality swale. Show l' proposed countours on plan to show runoff to water quality Swale. Albemarle County Fire &Rescue Approval (1 Copy is rewired to be submitted for review) Albemarle County Service AuthorityApproval. 2 Copies are required to be submitted for review) Virginia Department of Transportation Approval. (1 Cop, is to be submitted for review) 1. The entrance shown on the plan is existing and should be shown and dimensioned based on as- built conditions. Dimensioning should include entrance radius and taper length. In previous correspondence, it was noted that the taper needed to be 100' in length. If you have any questions about these conditions or the submittal requirements please feel free to contact me at Extension 1234, myname @albemarle.org. Sincerely, t Megan Yaniglos Senior Planner