Loading...
HomeMy WebLinkAboutSDP201300055 Review Comments Initial Site Plan 2013-11-19Maude Ginty Service Auth6rity TO: Christopher Perez FROM: Alexander J. Morrison, Civil Engineer DATE: November 18, 2013 RE: Site Plan Technical Review for: SDP201300055: Stonewater Townhomes- Initial Site Plan TMP# 61 Al -1 -A -100 & 61Al -1 -B -100 The below checked items apply to this site. ✓ 1. This site plan is within the Authority's jurisdictional area for: ✓ A. Water and sewer B. Water only C. Water only to existing structure D. Limited service ✓ 2. A 10 inch water line is located approximately on site. 3. Fire flow from, nearest public hydrant, located distant from this site plan, is Gpm + at 20 psi residual. ✓ 4. An 8 inch sewer line is located approximately on site. 5. An Industrial Waste Ordinance survey form must be completed. ✓ 6. No improvements or obstructions shall be placed within existing or future easements. 7. and plans are currently under review. 8. and plans have been received and approved. 9. No plans are required. ✓ 10. Final water and sewer plans are required for our review and approval prior to granting construction approval. 11. Final site plan may /may not be signed. 12. RWSA approval for water and /or sewer connections. 13. City of Charlottesville approval for sewer. ✓ Comments: • Submit 3 sets of construction drawings to the ACSA for review and approval (for sewer and water meter location verification). • Dedication of Stonewater infrastructure (less the section of sewer installed across Penfield Lane) before the ACSA will grant construction approval. 168 Spotnap Road • Charlottesville • VA 22911 • Tel (434) 977 -4511 • Fax (434) 979 -0698 www.serviceauthority.org