Loading...
HomeMy WebLinkAboutSUB201300031 Review Comments Bond Estimate 2014-02-05Albemarle Health & Rehabilitation Center Road and Infrastructure Construction Bond Estimate (roads, site work, storm sewer) Plan # SUB2O13O0031 Item Road Name Phillips Alley station 10 +00 to 16 +50 aggregate base blotted or prime &double seal asphalt base asphalt surface curb CG -2 curb CG -6 sidewalk, concrete (6') ramp CG -12 street name sign traffic control sign Street Landscape guardrail drop inlet or grate standard manhole frame top (not inlet) manhole structure (per ft. rise) pipe, rcp, cmp (15 to 48 ") pipe, rcp, cmp (15 to 48 ") pipe, rcp, cmp (15 to 48 ") pipe, rcp, cmp (15 to 48 ") rip -rap, placed matting, EC -2 or 3 clear and grub (for wooded sites) cut grading fill grading as -built drawings (1 k + price per 0.1 mi.) survey and layout (price per 0.1 mi.) mobilization materials testing compaction testing CBR tests (1 every 0.1 mi. per road) stone depth inspections pavement inspections pipe and drainage video inspections VDOT surety (1 lane) VDOT maintenance fee (1 In rd, 1 yr) VDOT admin. Cost recovery fee(1 lane) \\ Cob- dts01 \CityViewLnk \Docs \2013 \SUB \SUB201300031 Albemarle Health- BLA and Easement \road bond estimate 6Feb2014.xlsx 2/5/2014 No. Unit Unit Cost Cost installed % compete cost remaining road length 650.0 ft 6.0 in d 650.0 ft L 20.0 ft W 455.0 ton $35.00 $15,925.00 0% $15,925.00 650.0 ft L 0.0 ft W 0.0 sy $10.00 $0.00 0% $0.00 5.0 in d 650.0 ft L 20.0 ft W 398.1 tons $100.00 $39,812.50 0% $39,812.50 1.5 in d 650.0 ft L 20.0 ft W 119.4 tons $120.00 $14,332.50 0% $14,332.50 0.0 ft $13.00 $0.00 0% $0.00 650.0 ft $15.00 $9,750.00 0% $9,750.00 650.0 ft $17.00 $11,050.00 0% $11,050.00 3 each $350.00 $1,050.00 0% $1,050.00 1 each $200.00 $200.00 0% $200.00 2 each $200.00 $400.00 0% $400.00 0 Each 0 each $150.00 $0.00 0% $0.00 0 ES @ 3000 0.0 ft $17.00 $0.00 0% $0.00 4 each $3,500.00 $14,000.00 0% $14,000.00 0 each $500.00 $0.00 0% $0.00 26 ft $450.00 $11,700.00 0% $11,700.00 15.0 in d 1 ES -1,2 1 EC -1 570.0 ft $35.00 $20,950.00 0% $20,950.00 24.0 in d 0 ES -1,2 0 EC -1 0.0 ft $50.00 $0.00 0% $0.00 18.0 in d 0 ES -1,2 0 EC -1 0.0 ft $40.00 $0.00 0% $0.00 18.0 in d 0 ES -1,2 0 EC -1 0.0 ft $40.00 $0.00 0% $0.00 0.0 ft d 0.0 ft L 0.0 ft W 0.0 ton $60.00 $0.00 0% $0.00 300.0 ft L 20.0 ft W 666.7 sy $2.00 $1,333.33 0% $1,333.33 400.0 ft L 50.0 ft W 0.5 acre $24,000.00 $11,019.28 0% $11,019.28 3500.0 cy $4.00 $14,000.00 0% $14,000.00 0.0 cy $9.00 $0.00 0% $0.00 650.0 ft L 0.1231 mi. 2 Isum $2,000.00 $5,000.00 0% $5,000.00 650.0 ft L 0.1231 mi. 2 Isum $2,000.00 $5,000.00 0% $5,000.00 1 Isum $500.00 $500.00 0% $500.00 650.0 ft L 1.3 inc of 500' 2 each $200.00 $460.00 0% $460.00 650.0 ft L 1.3 inc of 500' 2 each $200.00 $460.00 0% $460.00 650.0 ft L 1.3 inc of 500' 2 each $200.00 $460.00 0% $460.00 650.0 ft L 1.3 inc of 500' 2 each $200.00 $460.00 0% $460.00 650.0 ft L 1.3 inc of 500' 2 each $200.00 $460.00 0% $460.00 570 ft $1.00 $570.00 0% $570.00 650.0 ft L 0.1231 mi. 1 Lanes $2,000.00 $2,462.12 0% $2,462.12 650.0 ft L 0.1231 mi. 1 Lanes $150.00 $184.66 0% $184.66 650.0 ft L 0.1231 mi. 1 Lanes $100.00 $373.11 0% $373.11 $181,912.50 $181,912.50 cost sum proj mgmt $27,286.88 $27,286.88 contingency $20,919.94 $20,919.94 \\ Cob- dts01 \CityViewLnk \Docs \2013 \SUB \SUB201300031 Albemarle Health- BLA and Easement \road bond estimate 6Feb2014.xlsx 2/5/2014 Albemarle Health & Rehabilitation Center Road and Infrastructure Construction Bond Estimate (roads, site work, storm sewer) Plan # SUB201300031 Item Road Name Phillips Alley No. Unit Unit Cost Cost installed % compete cost remaining Total $230,120 $230,120 \\ Cob- dts01 \CityViewLnk \Docs \2013 \SUB \SUB201300031 Albemarle Health- BLA and Easement \road bond estimate 6Feb2014.xlsx 2/5/2014