COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, North Wing
Charlottesville, Virginia 22902 -4596
Phone (434) 296 -5832
February 21, 2014
Ashley Cooper
Cooper Planning
304 7h Street SW
Charlottesville VA 22903
RE: ARB- 2014 -05: Rolkin Road Shops Countywide CofA
Dear Ms. Cooper,
Fax (434) 972 -4126
I have reviewed the above -noted application. The following revisions are requested to make the proposal consistent with the design
criteria that apply to the County -wide Certificate.
1. Identify on the drawings the material of the element directly above the brick of the pick -up window.
2. Identify on the drawings the material of the "canopy" at the top of the tower.
3. The WLS fixture is not a full cutoff fixture according to the County's definition. Either specify a lamp for the fixture that emits
less than 3000 lumens or choose an alternate fixture that has no part of the fixture below the glass lens.
4. Provide a cut sheet for the WME fixture on the plan and for review. Be sure to specify a full cutoff fixture according to the
County's definition, or specify a lamp that emits less than 3000 lumens.
5. Identify on the lighting plan the colors of the fixtures and poles.
6. Clarify on the lighting plan whether bases are proposed for the light poles. If they are, indicate on the plan that the 20' height
includes the bases.
7. The L1 wall fixture shown on A4.1 is not shown on the site lighting plan. The architectural finish schedule references an L2 wall
pack that is not included in the site lighting plan. The wall light locations are not consistent among all site and architectural
drawings. Coordinate wall light types and locations among all architectural drawings and site plan drawings.
8. Add the mechanical equipment note to the architectural drawings: "Visibility of all mechanical equipment from the Entrance
Corridor shall be eliminated."
9. The Century Link "planting in the easements" letter references maintaining 7.5' of clearance. It is assumed this does not apply in
this case because there are no overhead lines. If your understanding is otherwise, provide clarification.
Within 15 days of the date of this letter, please send correspondence (email is acceptable) indicating whether you will or will not
proceed with these revisions. If you choose not to proceed with these revisions, staff will be unable to approve your application. If you
choose to proceed with the revisions, please forward me one set of revised drawings together with a memo summarizing the revisions
you've made and the attached resubmittal form. Also, please note that the comprehensive sign plan for this building is currently under
review. If you have questions, feel free to contact me.
Sincerely,
Margaret Maliszewski
Principal Planner
cc: ARB- 2014 -05
COUNTY OF ALBEMARLE
Department of Community Development
REVISED APPLICATION SUBMITTAL
This form must be returned with your revisions to ensure proper tracking and distribution. County staff has indicated
below what they think will be required as a resubmission of revisions. If you need to submit additional information please
explain on this form for the benefit of the intake staff. All plans must be collated and folded to fit into legal size files,
in order to be accepted for submittal.
TO
DATE:
PROJECT NAME: ARB- 2014 -05 Rolkin Road Shops
Submittal Type Requiring Revisions () indicates Submittal Code
County Project Number
# Copies
Erosion & Sediment Control Plan E &S
# Copies
Distribute To:
Mitigation Plan (MP)
1
M. Maliszewski
Waiver Request (WR)
Stormwater Management Plan (SWMP)
Road Plan RP
Private Road Request, with private /public comparison
(PRR)
Private Road Request — Development Area (PRR -DA)
Preliminary Site Plan PSP
Final Site Plan or amendment FSP
Final Plat (FP)
Preliminary Plat (PP)
Easement Plat (EP)
Boundary Adjustment Plat BAP
Rezoning Plan (REZ)
Special Use Permit Concept Plan (SP -CP)
Reduced Concept Plan (R -CP)
Proffers (P)
Bond Estimate Request (BER)
Draft Groundwater Management Plan (D -GWMP)
Final Groundwater Management Plan (F -GWMP)
Aquifer Testing Work Plan (ATWP)
Groundwater Assessment Report (GWAR)
Architectural Review Board (ARB)
ARB- 2014 -05
1
Other: Please explain
(For staff use only)
Submittal Code
# Copies
Distribute To:
Submittal Code
# Copies
Distribute To:
ARB
1
M. Maliszewski