HomeMy WebLinkAboutSP201300027 Review Comments Special Use Permit 2014-02-20County of Albemarle
Department of Community Development
Memorandum
To: Claudette Grant, Senior Planner
From: Glenn Brooks, County Engineer
Date: 20 Feb 2014
Subject: 5`h Street Development drive through (SP201300027)
The special use permit for a drive-through lane on the 5th Street Development has been reviewed. This
drive-through configuration is recommended for denial.
This drive through proposal has no by-pass. It appears to have inadequate stacking. The order or teller
window has not been located, so the exact stacking layout cannot be determined. The split entrance with
very small radii is not acceptable. Lastly, the turning radius around the building corner are unacceptable.
file: El_sp_GEB_5thStrDevDriveThru.doc