Loading...
HomeMy WebLinkAboutSP201300027 Review Comments Special Use Permit 2014-02-20County of Albemarle Department of Community Development Memorandum To: Claudette Grant, Senior Planner From: Glenn Brooks, County Engineer Date: 20 Feb 2014 Subject: 5`h Street Development drive through (SP201300027) The special use permit for a drive-through lane on the 5th Street Development has been reviewed. This drive-through configuration is recommended for denial. This drive through proposal has no by-pass. It appears to have inadequate stacking. The order or teller window has not been located, so the exact stacking layout cannot be determined. The split entrance with very small radii is not acceptable. Lastly, the turning radius around the building corner are unacceptable. file: El_sp_GEB_5thStrDevDriveThru.doc