WPO Plan Review
Project: Crozet Phase 2 Water Main Replacement Project
Number: WP0201300054
Date: 28 February 2014
Reviewer: Max Greene
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road
Charlottesville, Virginia 22902
Phone: 434 - 296 -5832 ext.3283
This is an abbreviated review comment notice. County engineering staff is available every Thursday
afternoon to discuss details of review. To schedule, please call your reviewer for an appointment.
Erosion & Sediment Control: Adequate
(Code Chapter 17, Article II) X Not Adequate
Y N
State standards followed, and Design Standards Manual notes and details
Adequate limits and perimeter measures out of work areas
All stages protected adequately
1. Temporary construction entrance is covering work area. Please
move temporary construction entrance to one side of work area, or
explain in detail for the inspector and contractor how the (CE) will be
maintained during construction of the site. Mud on road may delay
project.
2. Silt fence still does not appear to adequately protect the site work.
Please show short runs of silt fence along contour intervals turning up
hill (Std. & Spec 3.05) see plate 3.05 -2 for drainage way installation.
The silt fence intervals should not exceed 10' in elevation. Please see
note #6 on page III -23 of the installation section. Silt fence will be
installed after backfill over pipe. Vehicles will need room to drive
around silt fence.
3. Stream crossing area (limits of construction) appears very narrow
for staging. Should contractor exceed limits of disturbance a delay in
construction may occur. Please show actual limits required for
contractor to install stream crossing. Turning vehicles around and
delivery of supplies should be part of the considerations in design.
This review attempts to encompass the larger compliance questions. County staff does not assume
responsibility for any calculation or plan details, and cannot cover the intricacies of every plan submitted.
Each plan and calculation must have a professional seal and signature to assume these responsibilities.
This plan is
Approved (please see attached Approval Fact Sheet)
X Not Approved